    MUSASHI SOUTH CAROLINA AMENDMENTS

    DOC NO:MSC-QM1

    Issued by: Ralph Sulser

    Edition: 01

    TS Manual Amendment Record

    CLAUSE CHANGE

    7/30/03 1 5- Mgmt. Resp. Updated for organization changes RSS

    7/6/04 2 5- Mgmt. Resp. Updated for organization changes RSS9/13/04 1 Forward Distribution list revised to post on "S" RSS

    3/1/05 3 5- Mgmt. Resp. Updated for organization changes RSS

    5/3/05 1 1-Scope Revised scope statement, & expanded RSS

    7.3 Product design exclusion detail

    8/31/05 4 5- Mgmt. Resp. Updated for organization changes RSS

    of responsibilities

    REVISIONDATE

    REVISIONNUMBER

    APPROVEDBY

  • 8/7/2019 TSQualityManual.master

    4/59

    MUSASHI SOUTH CAROLINA INTRODUCTIONPage 4 of 82

    DOC NO.:MSC-QM1SECTION#: 00

    Issued by: Ralph Sulser

    Edition : 01

    SECTION NO. TITLE

    0 0 5

    0.1

    0.2

    0.3

    0.4

    -Manual Revision, Updating & Amendment Procedu0.5

    0.6 -0.7 1

    1 Scope 1 0 1

    1.1

    1.2

    3 Terms and Definitions 3 0 1

    4 Quality Management System 4 0 3

    - General Requirement 4.1

    4.24.2.1

    4.2.2

    4.2.3

    4.2.4

    +May not be part of the "Uncontrolled Copy

    of this Manual which is meant for distribution to External Agencies.

    SECTION NO. TITLE

    5 Management Responsibility 5 7

    - Management Commitment 5.1

    - Customer Focus 5.2

    - Quality Policy 5.3

    5.4

    5.4.1

    5.4.2

    5.5

    5.5.1

    5.5.2

    5.5.3

    5.6

    5.6.15.6.2

    5.6.3

    6 Resource Management 6 0 2

    6.1

    6.2

    6.2.1

    6.2.2

    6.3

    6.4

    CL.REF.

    REVISIONNO.

    NO. OFPAGES

    Introduction

    - Table of Contents

    - Foreword

    - Structure of the Manual

    - Manual Issue Procedure

    - Company Profile

    - Distribution List +

    - General

    - Application (Exclusions, if any)

    - Documentation requirement- General

    - Quality Manual

    - Control of Documents

    - Control of Records

    CL.REF.

    REVISIONNO.

    NO. OFPAGES

    3 Updated positionsresp. 3/01/05

    - Planning

    - Quality Objectives

    - Quality Management System Planning

    - Responsibility, Authority & Communication

    - Responsibility & Authority of Managers

    - Management Representative

    - Internal Communication

    - Management Review

    - General- Review Inputs

    - Review Outputs

    - Provision of Resources

    - Human Resources

    - General

    - Competence, Awareness & Training

    - Infrastructure

    - Working Environment

  • 8/7/2019 TSQualityManual.master

    5/59

    MUSASHI SOUTH CAROLINA INTRODUCTIONPage 5 of 82

    DOC NO.:MSC-QM1SECTION#: 00

    Issued by: Ralph Sulser

    Edition : 01

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

  • 8/7/2019 TSQualityManual.master

    6/59

    MUSASHI SOUTH CAROLINA INTRODUCTIONPage 6 of 82

    DOC NO.:MSC-QM1SECTION#: 00

    Issued by: Ralph Sulser

    Edition : 01

    SECTION NO. TITLE

    0 7

    7 Product Realization 7- Planning of Product Realization 7.1

    - Customer Related Processes 7.2

    7.2.1

    7.2.2

    7.2.37.3

    7.4

    7.4.1

    7.4.2

    7.4.3

    7.5

    7.5.1

    7.5.2

    production and service provision

    7.5.3

    7.5.4

    7.5.5

    7.6

    7.6.1

    7.6.27.6.3

    7.6.3.1

    SECTION NO. TITLE

    8 8 0 3

    8.1

    8.2

    8.2.1

    8.2.2

    8.2.3

    8.2.4

    8.3

    8.4

    8.5

    8.5.1

    8.5.2

    8.5.3

    9 Section 2- Customer Specific requirements 1

    10 Amendment Record 1

    Annex 0 4

    Annex Organization Chart 0 1

    Note: Printed documents are not controlled copies-check master computer files for latest revisions 36

    CL.REF.

    REVISIONNO.

    NO. OFPAGES

    -Determination of requirements related to the produc

    -Review of Requirements related to the product

    -

    Customer Communication- Design & Development

    - Purchasing

    - Purchasing Process

    - Purchasing Information

    - Verification of Purchased Product

    - Production & Service Provision

    - Control of production and service provision

    *Validation of processes for

    - Identification & Traceability

    - Customer Property

    - Preservation of product

    -Control of Monitoring and Measuring Devices

    - Measurement system analysis

    - Calibration/verification records- Laboratory requirements

    - Internal Laboratory

    CL.REF.

    REVISIONNO.

    NO. OFPAGES

    Measurement, Analysis andImprovement

    - General

    - Monitoring & Measurement

    - Customer Satisfaction

    - Internal Audit

    - Monitoring & Measurement of Processes

    - Monitoring & Measurement of Products

    - Control of Non-conforming Product

    - Analysis of Data

    - Improvement

    - Continual Improvement

    - Corrective Action

    - Preventive Action

    Product Process Flow Chart , Process ApproachCharts

  • 8/7/2019 TSQualityManual.master

    7/59

    MUSASHI SOUTH CAROLINA INTRODUCTIONPage 7 of 82

    DOC NO.:MSC-QM1SECTION#: 00

    Issued by: Ralph Sulser

    Edition : 01

    Introduction

    0.2 FOREWORD

    0.3

    0.4 MANUAL ISSUE PROCEDURE

    Printed documents are not controlled copies-check master computer files for latest

    revisions.

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    This Quality Manual describes the Quality Management System Requirements adopted by Musashi South Carolina.The Manual lists the Procedures and measures stipulated for ensuring the quality of products manufactured by this unit.

    The Quality Management System has been formulated on the basis of ISO/TS 16949:2002(E) for MSC. This Sectiontitled "Introduction" explains the Structure, Issue and Updating procedure of the Quality System Manual. This Manualand the information incorporated herein are the property of Musashi South Carolina. It must not be reproduced in wholeor in part or otherwise disclosed without prior consent in writing from MSC.

    STRUCTURE OF THE MANUAL

    This Quality Manual is structured as shown in the content pages of the Manual. Different sections are arrangedsequentialy as per clause number of ISO/TS 16949:2002(E) and ISO 9001: 2000 (herein after called QMS Standard).The main clause number of QMS Standard has also been indicated along with title of each Section. For all Sections,relevant sub-clause numbers under the main clause of QMS Standard have been indicated in the text. Quality SystemManual pages are numbered serially with page number indication. All pages of the Master Copy of each Section of the

    manual contain electronic signature(s) of the Issuing and Approving Authority of the manual. The current revisionnumbers and edition numbers on each page is also indicated. Revision no. 0 has been given to first issue of theSection. This master manual is available in English Language only, and copies may be available in Japanese if required

    The TS16949 Coordinator/Management Representative is authorized by the Quality Control Manager, and the Presidentto carry out the activities of preparing, issuing, maintaining and updating of this Quality System Manual.

    The distribution of the Manual and the amendment(s) are con-trolled and the TS16949 Coordinator/ ManagementRepresentative carries out this activity.

    The Master Copy contains the electronic signature of the approving and issuing authority in original. The Master files arein the controlled in the TS16949 Coordinators computer files, with restricted access. Printed Controlled Copies are redstamped "Controlled Document" on the first page. Uncontrolled copies issued to designated individual s (as perdistribution list) are legibly photocopied from the Master Copy.

    Additional copies of the Manual, required by external agencies, if any, are issued by the TS16949Coordinator/Management Representative and such copies of the Manual issued are not stamped in red. This indicates thatthe copies are not controlled by virtue of the non-red stamp due to the copy process. These uncon-trolled copies do notcome under the control of the document amen-dment procedure, and are used for reference only, and are not used withinthe Company.

    The TS16949 Coordinator / Management Representative maintains a record of the distribu-tion list of the Quality SystemManual. This list is used as reference for updating of the respective controlled copies.

  • 8/7/2019 TSQualityManual.master

    8/59

    MUSASHI SOUTH CAROLINA INTRODUCTIONPage 8 of 82

    DOC NO.:MSC-QM1SECTION#: 00

    Issued by: Ralph Sulser

    Edition : 01

    0.5 MANUAL REVISION, UPDATING AND AMENDMENT PROCEDURE

    The TS16949 Coordinator/Management Representative retains one copy of the

    earlier version of the Section(s) in archives for Five Years.

    0.6 COMPANY PROFILE

    In 1938, Musashi Seimitsu Industry Co. LTD, Toyohashi, Japan started its first

    Manufacturing operation in Musashino City, Tokyo. Business flourished and

    they soon became a major supplier of precision automotive components worldwide.

    Musashi Seimitsu has grown to include facilities in the United States, Thailand,

    United Kingdom, Brazil, Indonesia and Canada.

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    The TS16949 Coordinator/ Management Representative in consultation with the related departments reviews the QualitySystem Manual periodically. No revision is implemented unless it has been approved by the Senior Manager QualityControl, then formally issued.

    Each revision is introduced formally by the TS16949Coordinator/ Management Represen-tative by issue of revisedsection(s) for each of the copies as per the Distribution List.

    When revisions take place, the revisions are indicated by the revision number in each of the revised sections and recordedin the Amendment Sheet (Refer Amendment Sheet) supplied with the controlled copies of the Manual. If there are morethan 20 revisions, the complete manual is revised to the next edition number.

    The insertion of the additional/amended sections and the removal of the old sections in the individual controlled copiesas per the distribution list of the Manual are the responsibility of the person holding the individual copy. All old sectionsso removed are crossed with an inscription of the marking "OBSOLETE" and returned to the TS16949 Coordinator/Management Representative who ensures that the same are destroyed.

    Musashi South Carolina, Inc. was established on October 25th, 1999, and started production in 2001. The 120,000 squarefoot main plant and 10,000 square foot assembly plant were built on 40.4 acres of land near Bennettsville, SouthCarolina. MSC produces ATV gears and assemblies and automotive differential gears.

    MSC is dedicated to the Team Philosophy. Teamwork is essential, and open communication is the cornerstone of all ourprocesses.

    MSC's production areas are supported by several departments, including General Administration, Human Resources,Purchasing, Engineering, E/H/S, Quality Control, Maintenance and Tool and Die.

    QUALITY, CUSTOMER FOCUS, AND CUSTOMER SATISFACTION is a way of life at Musashi South Carolina.Our products are sold in the international automotive and ATV markets. Musashi products have an established reputationin the world market for excellence in quality, and customer focus.

    Musashi continually upgrades technology and customer focus for quality, to optimize product performance, superior ininternational world-class quality expectations.

  • 8/7/2019 TSQualityManual.master

    9/59

    MUSASHI SOUTH CAROLINA INTRODUCTIONPage 9 of 82

    DOC NO.:MSC-QM1SECTION#: 00

    Issued by: Ralph Sulser

    Edition : 01

    DISTRIBUTION LIST

    (Distributed uncontrolled copy by electronic e-mail)

    Posted on the "shared" computer file

    TS16949 Coordinator (Printed Controlled copy)

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    MasterCopy

  • 8/7/2019 TSQualityManual.master

    10/59

    MUSASHI SOUTH CAROLINA SCOPE

    DOC NO.:MSC-QM1

    Issued by: Ralph Sulser

    Edition: 01

    1 SCOPE

    1.1 General

    Manufacture of Gears, and Gear Assemblies for the Automotive Industry

    Application

    1.2

    The following ISO/TS16949:2002 requirement is not applicable to MSC QMS, and therefore excluded from our scope:

    MSC does not have product design responsibility. All products are manufactured to customer drawings.

    MSC has adopted Technical Specification, ISO/TS 16949:2002(E) and Visteon Customer Specific Requirements, which

    specifies the requirements for a Quality Management System in order to:

    a) Demonstrate ability to consistently provide product(s) that meet(s) customers standards, and applicable regulatory

    requirements, and

    b) Enhance customer satisfaction through the effective application of the system, including the processes for continualimprovement of the system and the assurance of conformity to customer and applicable regulatory requirements.

    The established system is applicable to the activities of the company plant located at One Musashi Drive,Bennettsville, SC. The scope of implementation of this standard is as given below:

    Clause 7.3 activities related to Product Design and Development.

  • 8/7/2019 TSQualityManual.master

    11/59

    MUSASHI SOUTH CAROLINA SCOPE

    DOC NO.:MSC-QM1

    Issued by: Ralph Sulser

    Edition: 01

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

  • 8/7/2019 TSQualityManual.master

    12/59

    MUSASHI SOUTH CAROLINA TERMS and DEFINITIONS12 of 82

    DOC NO.:-QM1SECTION#:3

    Issued by: Ralph Sulser

    Edition: 01

    3.0 TERMS, DEFINITION & ABBREVIATIONS

    3.1OrganizatiMusashi South Carolina (MSC)

    Supplier: Organizations supplying the materials, parts and /or services to MSC

    Customer: The Customer /end user who buys the MSC products. It is also used for Internal

    Customers

    3.2

    QMS Quality Management System NC Non-conformance

    OPI Operator Process Instructions FMEA Failure Mode Effect AnalysisT/L Team Leaders PPAP Production Part Approval Process

    PC Production Control APQP Advanced Product Quality Planning

    MT Maintenance PH Purchasing

    PC Production Control PD Production

    MGT Management CP Control Plan

    SP Standard procedure CAR Corrective Action Request

    In this Quality System Manual and related procedures / instructions, following terms / definitions andabbreviations have been used:

    Terms and definitions:

    Abbreviations:

  • 8/7/2019 TSQualityManual.master

    13/59

    MUSASHI SOUTH CAROLINA TERMS and DEFINITIONS13 of 82

    DOC NO.:-QM1SECTION#:3

    Issued by: Ralph Sulser

    Edition: 01

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

  • 8/7/2019 TSQualityManual.master

    14/59

    MUSASHI SOUTH CAROLINAQUALITY MANAGEMENT SYSTEM

    Page 14 of 82DOC NO.:MSC-QM1

    SECTION#: 4

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    4.1 General Requirements

    MSC has therefore:

    These processes are managed by MSC in accordance with the requirements of the QMS Standard.

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    4.0 Quality Management System

    The MSC has established, documented, and implemented a Quality Management System. The company maintains andcontinually improves the effectiveness of our QMS in accordance with the requirements of ISO/TS 16949:2002

    a) identified the processes needed for the quality management system, and their application throughout MSC, except forthe exclusion as mentioned at Section 1.0 (Refer 1.2), The outsource processes, if any, that affect product conformity withrequirements, have also been identified. Apart from their identification, the Company has also identified the controls overtheir processes in order to ensure product conformity.

    b) determined the sequence and interaction of these processes (QC-PM-001 &001b) , and a typical bevel gearProcess Flow Diagram(s) shown in each parts PPAP/QAV booklet. (located in the front of manual)

    c) determined the criteria and the methods needed to ensure that both the operation and control of theseprocesses are effective. This has been done while planning for the processes. (Refer Section 7.1).d) ensured the availability of resources and information necessary to support the operation and monitoring ofthese processes (Refer Section 6 & 7.1). These have been determined and verified at the time of planning theprocesses.

    e) decided to monitor, measure and analyze the above identified processes (Refer Section 8), and

    f) implemented actions necessary to achieve the planned results and deciding, the continual improvement ofthese processes.

    4.1.1 MSC assures control over any outsourced processes and responsibility of same conforming to all customerrequirements.

  • 8/7/2019 TSQualityManual.master

    15/59

    MUSASHI SOUTH CAROLINAQUALITY MANAGEMENT SYSTEM

    Page 15 of 82DOC NO.:MSC-QM1

    SECTION#: 4

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    4.2 Documentation Requirements

    The Quality Management System documentation of the MSC includes:

    a) Documented statement of Quality Policy and Quality Objectives, (Refer Section 5.3 & 5.4.1 of this Manual)

    b) Quality System Manual,

    The Company has developed document structure as given below:

    Level 1- Quality System Manual

    Level 2- Standard Procedures

    Level 3 -Operator Process Instructions

    Work Instructions

    Process Flow Diagrams

    Drawings / Specifications

    Level 4- Checksheets, Charts, Forms, Tags

    4.2.1 General

    c) Documented procedures wherever required by ISO/TS 16949:2002 and where the absence of these procedurescan affect the quality of the product.

    d) Applicable documents needed by the Company to ensure the effective planning, operation and control of itsprocesses, and

    e) Quality Records specified by this standard required for demonstrating the objective evidence of having carriedout the activity.

    MSC has established procedures to conform with those specified in the Standard and identified as Documented

    Procedures. These have been established, documented, implemented and maintained. While planning for theprocesses, apart from the required procedures, other procedures and guidelines / work instructions have also beenidentified based on the type of the activity, complexity of the processes and the existing competence of thepersonnel.

  • 8/7/2019 TSQualityManual.master

    16/59

    MUSASHI SOUTH CAROLINAQUALITY MANAGEMENT SYSTEM

    Page 16 of 82DOC NO.:MSC-QM1

    SECTION#: 4

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    The controls defined in the procedure include the methods:

    and implementation of all customers engineering standards/specifications and

    changes. Timely review shall not exceed two working weeks.

    A record will be maintained of the date each change is implemented, and corresponding document changes

    Procedure No.: QC SP 003 -Document Control

    4.2.2 Quality Manual

    MSC has established and maintains a Quality Manual that includes the applicable Scope of the QualityManagement System (Refer Section 1.1). Procedures established have been referenced in the relevant Sections.

    Wherever no procedures are required, the required methodology as adopted and implemented to meet therequirement of the standard have been explained in the Manual itself. The interaction between the processes(QC-PM-001) of the Quality Management System have also been described in the Manual and by including theProcess Flow Diagram(s) of the product(s) processed by the Company.

    4.2.3 Control of Documents

    Documents required by Quality Management Systems (refer documentation structure under 4.2.1) are controlled.The Company has established a Documented Procedure which defines the controls needed to effectivelyimplement the Quality Management Systems.

    a) To approve documents for adequacy prior to issue, from designated approving authorities,

    b) To review and update, as necessary, as a part of improvement of the management systems and re-approvethe documents after modifications by the designated approving authorities,

    c) To ensure that changes and the current revision status of documents are identified through establishingdistribution and maintaining revision / issue number.

    d) To ensure that relevant versions of applicable documents are available at the points of use.

    e) To ensure that documents, while distributing and use, remain legible and are readily identifiable by theirdocument numbers, revision status and/or titles,

    f) To ensure that documents of external origin like customer drawings, international / other national standards areidentified and updated periodically and their distribution controlled.

    g) To prevent the unintended use of obsolete documents by eliminating same and substituting with revised version, and toapply suitable identification to them if they are retained for any legal / reference purposes.

    4.2.3.1 A system has been established and maintained to assure timely review distribution

    4.2.4 Control of Quality Records

    While planning for the processes (Refer Section No. 7.1), the MSC has determined, established and maintainedapplicable Quality Records which provide evidence of conformity to requirements [including regulatory andcustomer requirements] and of the effective operation of the Quality Management System. These quality recordsserve as the objective evidence and are part of the Quality Management Systems. Quality records are maintainedin such a manner that these remain legible, readily identifiable and retrievable.

    MSC has established a documented procedure which defines the controls needed for identification, storage,protection, retrieval, retention time, and disposition of records.

    4.2.4.1 Records retention controls shall satisfy regulatory, and customer requirements if these differ from MSC

  • 8/7/2019 TSQualityManual.master

    17/59

    MUSASHI SOUTH CAROLINAQUALITY MANAGEMENT SYSTEM

    Page 17 of 82DOC NO.:MSC-QM1

    SECTION#: 4

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    company policies. Procedure No.: QC SP 004 - Control of Records

  • 8/7/2019 TSQualityManual.master

    18/59

    MUSASHI SOUTH CAROLINAMANAGEMENT RESPONSIBILITY

    Page 18 of 82

    DOC. NO.;MSC-QM1SECTION #: 5

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 08/31/05

    Rev. 4

    5.2 Customer Focus

    Methods of determining customer requirements, expectations and satisfactions are defined in the procedures

    MGT SP 001 Contract Review (Product Requirement Review)

    QC SP 023 APQP (Planning for product realization)

    QC-SP-007 Failure Mode And Effect Analysis

    5.3 Quality Policy

    The Management of the company has defined the quality policy ensuring that the quality policy

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    5.0 Management Responsibility

    5.1 Management Commitment

    The MSC management is committed to the development and implementation of the quality management systemand continually improve its effectiveness by:

    a) Communicating to all employees of the company: the importance of meeting customer as well as

    statutory and regulatory requirements through regular training programs, display of documents anddepartmental meetings, communication meetings, and manag

    b) Establishing the quality policy based on the improvement objectives,

    c) Ensuring that quality objectives are established,

    d) Conducting regular management reviews, and

    e) Ensuring the availability of resources for improvements when required.

    f) Product realization process and support processes are reviewed for their effectiveness and efficiency

    The Top Management of MSC ensures that customer requirements are determined and fulfilled with the aim of enhancingcustomer satisfaction. While reviewing the requirements, the implied needs and expectation of the customer are alsoidentified. These are conveyed to the respective functions for ensuring that they are met. As a part of Management Review

    (Refer 5.6 below), a focus is made for communicating the customer requirements to all functions and ensuring productconformance.

    a) is appropriate to the purpose and organizational goals of the company,

    b) includes a commitment to comply with requirements and continually improve the effectiveness of the qualitymanagement system,

    c) provides a framework for establishing and reviewing quality objectives,

    d) is communicated to all employees of the company and is understood at all levels in the company,

    e) is periodically reviewed for continuing suitability.

  • 8/7/2019 TSQualityManual.master

    19/59

    MUSASHI SOUTH CAROLINAMANAGEMENT RESPONSIBILITY

    Page 19 of 82

    DOC. NO.;MSC-QM1SECTION #: 5

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 08/31/05

    Rev. 4

    QUALITY POLICY

    Dated: 03/20/2003 S. Okubo President

    customer satisfaction. Current plant organizational charts are on file in H.R.

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    The Policy of the company has been displayed at strategic locations and also distributed to all employees. Periodic TrainingPrograms are held for understanding by all the functions through out the organization. Quality Policy distribution and displayrecords are maintained.

    The policy of Musashi South Carolina is to achieve total customer satisfaction by delivering products and providing servicesthat meet or exceed customer quality requirements and expectations. Deliver on time, and at the most competitive prices indomestic and export market for our entire product range.

    It is implied that all people at all levels in our organization be committed to comply with requirements and continuallyimprove the effectiveness of the Quality Management System and their performance. Ultimate goal of working towardsachieving zero defects. Necessary measures are also taken towards product safety, and environmental needs to minimizepotential risks to employees, and subsequent end users.

    Our mission is to make Musashi South Carolina a synonym for a world-class organization excelling in gear, and gearassembly manufacturing.

    MSC Senior Management, Department Managers, Assistant Managers, and area Team Leaders shall ensure that this policy isunderstood, implemented and maintained by all personnel in their respective division / department / section.

    MSC will continually strive to produce quality products that meet orexceed customer expectations, cost competitiveness, and timelydeliveries QCD (Quality, Cost, Delivery) through exercise ofcontinual improvement, employee support, and customercommunication.

    Process interactions of achieving product realization are described on QC-PM-001. Outlined below aretypical duties, and inputs of the department management to focus on objectives, and

  • 8/7/2019 TSQualityManual.master

    20/59

    MUSASHI SOUTH CAROLINAMANAGEMENT RESPONSIBILITY

    Page 20 of 82

    DOC. NO.;MSC-QM1SECTION #: 5

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 08/31/05

    Rev. 4

    5.4 Planning5.4.1 Quality objectives

    Quality objectives address customer expectations and achievement goals within a defined time period.

    5.4.2 Quality management system planning

    Top management ensures that

    5.5 Responsibility, authority and communication

    5.5.1 Responsibility and authority

    Top management ensures that the responsibilities and authorities are defined and communicated within the organization.

    Top management ensures that quality objectives, including those needed to meet requirements for product [see 7.1 a)] areestablished at relevant functions and levels within the organization. The quality objectives are measurable and consistent

    with the quality policy.

    Top management defines quality objectives and measurements that are included in the business plan and used to deploy thequality policy.

    a) the planning of the quality management system is carried out in order to meet the requirements given in 4.1, as well as thequality objectives, and

    b) the integrity of the quality management system is maintained when changes to the quality management system areplanned and implemented.

    1. President - Musashi South Carolina The senior most executive at the plant and designated as President, and has responsibility for the entire operation..

    Approves customer and supplier contract review actives.

    Approves the company's policies and gives directions for managing the objectives, and company activities.

    Approves the MSC's quality policy and objectives.

    Responsible for providing essential resources and personnel for implementation of the quality policy, and quality

    management system.

    Responsible for effective implementation of the quality management system.

    Through leadership and actions, the President creates an environment where people are fully involved, and in which a

    QMS can operate effectively. Reviews customer scorecards for Visteon, and other customers, on their web sites

    Chairman of the Management Review Committee.

    2. Senior Manager Engineering/Maintenance

    Overall responsibility for planning, coordinating & managing activities related to functions of Manufacturing

    Engineering, Maintenance, Projects.

    Preventive/Predictive Maintenance, Tool/Die, Mechanical, Electrical, Compressor, pump house and LPG and all utilities

    Manages, and coordinates any modifications to be carried out in the existing operations or enhancing the efficiency of the

    plant.

    Responsible for building the required competency level in the employees reporting to him.

    Assisted by Manufacturing Engr. Mgr, Maint. Manager. Authorized for approval of production processes in the plant.

    Authorized for taking corrective & preventive action in case of deviations in the operations.

    Authorized to STOP PRODUCTION if systems are not being implemented.

    Developing facilities, processes and equipment, and contingency plans.

    Supporting QMS activities including regulatory requirement if any, for the products.

    Reports to the Plant President.

  • 8/7/2019 TSQualityManual.master

    21/59

    MUSASHI SOUTH CAROLINAMANAGEMENT RESPONSIBILITY

    Page 21 of 82

    DOC. NO.;MSC-QM1SECTION #: 5

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 08/31/05

    Rev. 4

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

  • 8/7/2019 TSQualityManual.master

    22/59

    MUSASHI SOUTH CAROLINAMANAGEMENT RESPONSIBILITY

    Page 22 of 82

    DOC. NO.;MSC-QM1SECTION #: 5

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 08/31/05

    Rev. 4

    Responsible for quality systems, procedures, and instructions for the plant

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    3. Senior Manager Quality Control

    Monitoring the Process for outputs.

    Providing Test Status on In-coming, In-process and Finished Products

    Documenting trends in quality and current quality levels.

    Controlling of non-conforming products. Authorized for dispositioning deviations on Non-conforming products for use at next stages.

    Authorized for release of finished product.

    Obtaining waivers from customer on non-conforming finished products.

    Developing and implementation of plans for customer complaint resolution.

    Assessment of Preliminary (Ppk) and on going process capabilities (Cpk).

    Preparing details for Production Part Approval Process.

    Inspection and testing at incoming, in process and final stages

    Controlling the procedures for In-coming, In-process and Final Inspection Stages

    Calibration of all identified inspection, measuring and test equipment.

    Authorized for providing inspection and test status on all products.

    Identifying and implementing statistical technical techniques for process and product.

    Verifying the effectiveness of corrective and preventing actions.

    Issuing and maintaining originals and withdrawal of obsolete APQP documents, process standards, drawing anddocuments of external origin.

    Production Part Approval Process (PPAP&PSW) and liaison with customers for same

    Establishing, and maintaining customer communication channels.

    Monitoring and Measuring Customer Satisfaction metrics.

    Representing the needs of the customer in internal functions in addressing the ISO/TS 16949 requirements.

    Assisted by Quality Control Mgr. QC, QC Technicians, QC Associates, TS16949 Coordinator

    Reviews and maintains scorecards for Visteon, and other customers, weekly on their web sites

    Designated as Customer Representative to ensure customer requirement are met, and contact for quality issues.

    Representing the needs of the customer in internal functions addressing the product realization planning (APQP) forISO/TS 16949 requirements (e.g. selection of special characteristics, setting quality parameters.

    Develops manufacturing process design quality controls including Process Flow Diagram, FMEAs, Control Plans andProcess Standards, and Inspection Standards.

    Authorized to STOP PRODUCTION if systems are not being implemented.

    Reports to the Plant President

  • 8/7/2019 TSQualityManual.master

    23/59

  • 8/7/2019 TSQualityManual.master

    24/59

    MUSASHI SOUTH CAROLINAMANAGEMENT RESPONSIBILITY

    Page 24 of 82

    DOC. NO.;MSC-QM1SECTION #: 5

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 08/31/05

    Rev. 4

    Identification of training needs for building a team of internal quality auditors

    5.5.1.1 Responsibility and authority of managers

    Personnel responsible for product quality have the authority to stop production to correct quality problems.

    5.5.2 Management representative

    d) liaison with external parties on matters relating to the quality management system.

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    7. MSI Engineering- Japan

    Reviewing, recommending and providing guideance for effectiveness of the procedures on Product requirement

    Review Manufacturing Process Designing and Development; Plant Facilities and Equipments Provisioning,

    Developing guidelines of new products planning. Reviewing customer engineering specifications and standards.

    8. President - Sales and Marketing-Musashi North America, Detroit, MI Receipt of Inquiries from the customers, review, and passes thyrough to Musashi South Carolina

    Coordinating with MSI, MSC President for planning future business

    Assists in assessments of customer satisfaction.

    Reports to President Musahi North America

    9. Management Representative ( Ref. 5.5.2 )

    The Management of the company has appointed theTS16949 Coordinator, as Management Representative, who, irrespectiveof other responsibilities, has the responsibility and authority that includes:

    Management Representative (MR) / TS16949 Coordinator, Quality Controlare responsible for

    Establishing, implementing and maintaining quantity system in accordance with ISO/TS 16949:2002 (E)

    Reporting the performance of the Quality System for Management Review, which forms the basis for

    improvement of Quality System.

    Liaison with internal and external parties on matters relating to Quality System.

    Ensuring timely management review of the Quality System.

    Organizing Audit Summary Report, and summary of the Preventive Actions for Management Review.

    Approving and ensuring effectiveness of procedures on Document Control, Quality Management System Auditingand Records Control.

    Preparation and issue of Quality System, and Procedures Manuals

    Maintaining original documents and their master lists and issue of Quality System Manual, all Quality System

    Procedures, all work instructions, and samples of all formats

    Managers with responsibility and authority for corrective action are promptly informed of products or processes that do notconform to requirements.

    Production operations across all shifts are staffed with personnel in charge of, or delegated responsibility for, ensuringproduct quality.

    Top management has appointed the TS16949 Coordinator-Quality Control who, irrespective of other responsibilities, has theresponsibility and authority that includes:

    a) ensuring that processes needed for the quality management system are established, implemented and maintained,

    b) reporting to top management on the performance of the quality management system and any need for improvement, and

    c) ensuring the promotion of awareness of customer requirements throughout the organization.

  • 8/7/2019 TSQualityManual.master

    25/59

    MUSASHI SOUTH CAROLINAMANAGEMENT RESPONSIBILITY

    Page 25 of 82

    DOC. NO.;MSC-QM1SECTION #: 5

    Issued by: Ralph SulserApproved by: Keith Shepard

    Edition: 01Date: 08/31/05

    Rev. 4

    5.5.3 Internal communication

    5.6 Management review5.6.1 General

    5.6.1.1 Quality Management System Performance-Input

    5.6.2.1 Additional Review Inputs

    a) Management analysis of actual and potential field failures, and their impact on quality, safety, or the environment.

    5.6.3 Review output

    Procedure No. QC SP 001 Management Review

    Management Review Form: QC-F-MR418

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    5.5.2.1 The Sr. Manager-Quality Control has been designated as Customer Representative to assure customer requirementsare addred within MSC. Visteron will be notified of any changes to customer rep., or senior mgmt.

    The Management of the MSC ensures that appropriate communication processes are established within the company and thatcommunication takes place regarding the effectiveness of the quality management system, and actions to be taken on non-conformances encountered in the activities including customer communication.

    Top Management of MSC reviews the companys quality management system, at planned intervals to ensure its continuingsuitability, adequacy and effectiveness. The Quality Management System of the company is reviewed by the ManagementReview Team that comprises all Managers of Departments under the Chairmanship of the President.

    The review includes assessing opportunities for improvement and the need for changes to the quality management system,including the quality policy and quality objectives. Management Representative maintains records of management reviews.

    - All requirements of the quality management system, performance, and trends for continual improvement.

    - Monitoring quality objectives

    - Regular reporting and evaluation of cost of poor quality- Evidence of achieving: quality objective specified in the business plan

    - Evidence of customer satisfaction with products supplied

    5.6.1 Review input

    The input to management review in the form of Agenda for Management Review Team meeting includes information for theperiod under review on sections of applicable QMS STANDARDS. However, more focus is placed on the following:

    a) Business Plan/Quality objectives

    b) Cost of poor quality

    c) Customer satisfaction, feedback, (Customer perceptions & Complaints)

    d) Analysis of actual and potential field failures and their impact on quality, safety or the environment

    e) Follow-up actions from previous management reviews,

    f) Results of internal/external audits including the trends,

    g) Process performance and product conformity,h) Status of preventive and corrective actions,

    i) Planned changes that may affect the quality management system, and

    j) Recommendations for improvement especially for product / process characteristics,

    k) Status and results of Quality objectives and Quality Improvement Programs,

    l) Performance of Suppliers, e.a., monthly ratings for quality, and delivery

    b) Measurements at specified stages of design and development will be defined, analyzed, and reported with summaryresults. Items such as quality risks, costs, lead times, critical paths, and others as appropriate.

    The minutes of the management review meeting are recorded and maintained for a specified period. The output from themanagement review in the form of minutes of meeting and action plans include any decisions and actions related to:

    a) Improvement of the effectiveness of the quality management system and its processes,

    b) Improvement of product related to customer requirements, and

    c) Resource needs support

  • 8/7/2019 TSQualityManual.master

    26/59

    MUSASHI SOUTH CAROLINARESOURCE MANAGEMENT

    Page 26 of 82

    DOC NO.: MSC-QM1SECTION#: 6

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev.: 0

    6 Resource Management

    6.1 Provision of Resources

    6.2 Human Resources

    6.2.1 General

    For process design responsible personnel this includes competence on design tools and techniques

    MSC determines and provides the resources, such as competent personnel, proper working environment and adequateinfrastructure needed to implement and maintain the Quality Management System and continually improve its effectiveness.

    Equipment and instruments needed for work and verification are identified, procured. Procedures are issued to ensure thatthese are fit for use in carrying out work and verification activities.

    Department Managers identify the resources required for implementing, performing and verification activities related toMSCs quality management systems. These are further examined, reviewed and provided as and when required to enhancecustomer satisfaction by meeting customer requirements. These resources are identified at the time of planning for productrealization and periodically reviewed (Refer Section No. 7.1). Necessary identified resources are planned and provided tomeet the requirements.

    MSC has identified the competence level required for the personnel carrying out the activities in different areas of operationsand production departments. The Job Description (Profiles) for all functions have been defined on the basis of requirementsrelated to appropriate education, training, skills and experience for the specific jobs. Hence the personnel performing suchwork, which affects product quality, are assigned the tasks on the basis of defined competence. The job descriptions are alsoused for identifying the training needs of the personnel to ensure they are competent to do their assigned activities.

    6.2.2 Competence, Awareness and Training

    MSC has established a documented procedure for Training. Through this procedure, the training needs of personnel areidentified to ensure competence for carrying out their activities. The controls exercised for making the personnel competentare:

    a) To determine the required minimum competence for the personnel performing work affecting product quality in termsof criticality of the process through defined Job Description (Profiles) (Refer Section 6.2.1 above),

    a) To provide structured / unstructured training (i.e. technical college courses, on job training / coaching under thesupervision of their seniors) to the identified personnel to satisfy and meet their training needs. On the jobtraining isprovided to all the personnel including temporary/contract personnel whenever there is any new or modified job/processaffecting product quality is incorporated. During this training, associates are informed of the consequences to the customerof non-conformity to quality requirements.

    b) To evaluate, after a defined period, the effectiveness of the structured / unstructured training provided, toward progress

    in their achievements:

    c) To ensure that the MSC associates are fully aware of the relevance and the importance of their activities including theirinvolvement and contribution to the achievement for the identified quality objectives.

    d) To maintain records of education, training, skills and experience of all associates as quality records. These records alsohelp in determining the need for multi-skill training requirements, if any. (Refer to Skill Maps for each department)

    f) A documented procedure has been established and maintained for employee motivation and empowerment for achievingquality objectives, continual improvement and promote innovation. A process is in place to ensure that personnel are awareof the relevance and importance of their activities and contribution in achieving quality objectives.

    Procedure: HR SP 001 Training

  • 8/7/2019 TSQualityManual.master

    27/59

    MUSASHI SOUTH CAROLINARESOURCE MANAGEMENT

    Page 27 of 82

    DOC NO.: MSC-QM1SECTION#: 6

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev.: 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    Infrastructure

    As per the identified requirements, MSC provides the infrastructure needed to achieve conformity to product requirements.

    Procedure: QC SP 024 Contingency Plan

    MT-SP-001

    6.4 Work Environment

    MSC determines and manages the required work environment needed to achieve conformity

    to product requirements as per documented process. At the time of planning for Product Realization

    wherever required, reviewed upgrading. The following applicable work environment factors

    6.4.1 Personnel safety to achieve product quality

    6.4.2 Cleanliness of premises

    MSC maintains the premises in a state of order, cleanliness, and repair consistent with the product and manufacturing needs.

    Cleanliness of premises is maintained using 5S check lists to ensure the premises in a state of order, cleanliness and repair.

    HR SP 002 Resource Management

    6.3

    MSC identifies and determines, with a multidisciplinary approach, the required infrastructure at the time of Planning forProduct Realization (Refer Section No. 7.1). The infrastructure considered during planning includes:

    a) adequate buildings for storage, processing, inspectionsb) adequate workspace for working and house keeping, processing and storage

    c) required associated utilities like power, compressors, water supply, fuel supply, utilities etc.;

    d) required process equipment / machinery (both hardware and software) which can meet needs for converting the inputsinto required outputs at relevant stages of processing, and can meet the customer requirements.

    e) supporting services, such as transport for movement within and outside of MSC and required means of communication.

    f) Plant layout is developed in such a way so that it optimizes material travel; handling and value added use of floorspace, and facilitates a synchronous flow of material. A system is in place to evaluate and monitor the effectiveness ofexisting operation.

    g) A contingency plan is prepared and followed in all manufacturing departments to ensure supply of products in the eventof emergency such as utility interruptions, labor shortage, key equipment failure and field returns.

    MSC has also established a documented procedure, and preventative maintenance schedule matrix for maintaining the aboveinfrastructure by conducting preventive, condition monitoring and break-down maintenance in order to ensure continuingsuitability. The data related to maintenance is analyzed and maintenance objectives are established for continualimprovements.

    - Procedure for Preventative Maintenance(update-CG)

    (Refer Section No. 7.1), the requirements of Work Environment are considered and examined and

    are considered at the time of planning:

    Temperature, humidity, vibration, air quality, noise, lighting, as appropriate to the nature of the work being performed.

    Product safety and means to minimize potential risks to employees, and customers are addressed by MSC, especially in thedesign and development process and in manufacturing process activities.

    Human factors such as ergonomics (space required for effective working), and need for the use of personal protective

    equipment (PPE).

  • 8/7/2019 TSQualityManual.master

    28/59

    MUSASHI SOUTH CAROLINARESOURCE MANAGEMENT

    Page 28 of 82

    DOC NO.: MSC-QM1SECTION#: 6

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev.: 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    The work conditions and environment are continually improved for meeting the product requirements. These requirementsare met by providing the adequate facilities and conducting regular maintenance for their upkeep.

  • 8/7/2019 TSQualityManual.master

    29/59

    MUSASHI SOUTH CAROLINARESOURCE MANAGEMENT

    Page 29 of 82

    DOC NO.: MSC-QM1SECTION#: 6

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev.: 0

  • 8/7/2019 TSQualityManual.master

    30/59

    MUSASHI SOUTH CAROLINARESOURCE MANAGEMENT

    Page 30 of 82

    DOC NO.: MSC-QM1SECTION#: 6

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev.: 0

  • 8/7/2019 TSQualityManual.master

    31/59

    MUSASHI SOUTH CAROLINARESOURCE MANAGEMENT

    Page 31 of 82

    DOC NO.: MSC-QM1SECTION#: 6

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev.: 0

  • 8/7/2019 TSQualityManual.master

    32/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 32 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    7.0 Product Realization

    7.1.1 Customer requirements and references or differences to the specified technical specifications are included in the plannin

    The following are considered, as appropriate, at the time of development, updating / modification for improvement in the exis

    Procedure No. MGT-SP-001 Contract Review

    Procedure No. QC SP 023 Advanced Product Quality Planning

    7.2 Customer Related Processes

    7.2.1 Determination of Requirements Related to Product

    The organization has established a documented procedure to determine:

    customer and statutory and regulatory requirements;

    characteristics;

    7.2.1.1 Customer designated special characteristics are identified for conformance according to

    customer requirements of the designation, documented and controlled

    7.2.2 Review of Requirements Related to Product

    7.1 Planning of Product Realization

    MSC uses a multi-disciplinary approach for Planning for the products realization [using advance product quality process].While Planning for product realization, it is ensured that the requirements of the other processes of the Quality ManagementSystem (see 4.1) are consistent with the anticipated requirements.

    Product and process regulatory requirements are also given due consideration during the development and preparation ofrelevant Process Control Documents. The resources, infrastructure, work environment and competency of required personnelare identified.

    a) identified quality objectives and requirements for the product; [7.1.2 Acceptance criteria are defined by the company, anby the customer if required. The acceptance level for attribute data sampling is always zero defects.]

    b) the need to establish processes, documents, and provide resources specific to meet the requirements of the product;

    c) required verification, validation, monitoring, inspection and test activities specific to the products processed at relevant sprocesses and the criteria for the product acceptance; Acceptance criteria for attribute data sampling is zero defects.

    d) 7.1.3 Confidentiality of customer contracted product/projects and related product information.

    e) records needed to provide objective evidence that the realization processes and resulting product fulfill requirements.

    The business risks, the FMEAs (failure modes), their current status (i.e. Severity, Occurrence, Detection criteria) are studied arequired controls are identified. If upgrades are required for improvements, then action plans are initiated.

    The output of this planning in the form of a Control Plan, FMEA, Operator Process Instructions, or process control standards (quality inspection plans are made and provided at the relevant stages of processing for implementation.

    7.1.4 A system is in place to control and react to changes that impact product realization. Assessment, verification, validationthe changes including the changes by the supplier.

    - requirements related to product including those specified by the customer, not stated by the

    - conformity to customer requirements for designation, documentation, and control of special

    - review of requirements related to product prior to supply and resolving any differences;

    - amendments of relevant documents if product requirements are changed;

    - investigating, conforming and documenting the manufacturing feasibility of the proposed product

    - determining and implementing effective arrangements with the customer; and

    - ability to communicate necessary information in customer specified language and format

    MSC reviews the requirements related to the product. This review is conducted via a check list prior to the organization's comsupply products to the customer and ensures that:

    a) Product requirements including delivery schedules, packing requirements are clearly defined. Where the customer providocumented requirements, the customer requirements are confirmed before acceptance by: phone calls, e-mails, meetings, lett

  • 8/7/2019 TSQualityManual.master

    33/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 33 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    Records of the results of the review and actions arising from the review as quality records are also maintained.

    Procedure No. MGT-SP-001 Contract Review

    Procedure No. QC SP 023 APQP

    b) Contract or order requirements differing from those previously expressed are resolved, and

    c) MSC has the ability to meet the defined requirements.

    d) Manufacturing feasibility including risk analysis is investigated, confirmed and documented before contracting.

    e) In case any formal review of the contract is not applicable, prior authorization from the customer is obtained before procthe contract.

    If any amendments to product requirements are received from the customer, MSC ensures that these are reviewed for ability tand the relevant documents are amended accordingly. The modified documents are conveyed to relevant functions for makingof the changed requirements for immediate compliance.

    7.2.3 Customer communication

    MSC has determined and assigned responsibilities for implementing effective arrangements for communicating with custometo:

    a) Product information through customer visits, meetings, letters, e-mails, and web site.

    b) Inquiries, contracts or order handling, including amendments, and

    c) Customer feedback, including resolving customer complaints. Such feedbacks from customer are reviewed and analyzedcause of the problems through problem solving techniques. The decisions taken for corrective and preventive actions includinimprovements in the products / processes.

    d) Where required by the customer, necessary information including data is communicated to customers in their specified lformat. (web sites, e-mail, electronic data exchange)

    Procedure No. MGT SP 001 - Procedure for Contract Review

    QC SP 019 - Corrective Action (Includes Customer complaint response)

    QC SP 011 - Procedure for internal & External Customer Satisfaction

    7.3.2 Design and Development Planning

    MSC only manufactures products from customer provided designs and specifications, and therefore performs only manufacturdesign and development activities in conjunction with Planning for product Realization.

    Upon receiving a Letter of Intent (LOI) or Purchase Order (PO) from the customer the organization develops a process designdevelopment plan defining the development stages design review, verification and validation requirements and responsibilitieauthorities for design and development.

    7.3.2.1 The organization uses cross-functional teams for manufacturing process design and development. The team carries outstudies, prepares process flow diagrams, PFMEA, (process failure mode and effective analysis), develops Control Plans and ispecial characteristics for products giving due care to product safety, utilizing appropriate mistake proofing methodologies witdefect prevention rather than detection and, creating internal awareness on safety considerations.

    7.3.2.2 The design and development inputs are then identified, documented and reviewed based on product and customer requand experience from previous developments.

    Control Plans are developed at the system, sub system and component levels for the products supplied at the different phases

    Prototype, Pre-launch and Production as appropriate including listing all controls used for process control.

    7.3.2.3 Manufacturing design outputs consist of process control guidelines, i.e., FMEAs, Control Plans, Process Standards anProcess Instructions. These are marked with the customers special characteristics symbols, if specified by the customer on thdrawings/documents supplied.

    All production processes, which directly affect the quality of products, are considered during quality planning. Control Plans aand updated if the product or process changes, or becomes in-capable / unstable. Inspection methods, and frequencies are alsonecessary.

    Process approval acceptance criteria data for quality, reliability, maintainability and measurability results of error-proofing actMethods of rapid detection and feed back of manufacturing process non conformities are defined, as appropriate as an output,

  • 8/7/2019 TSQualityManual.master

    34/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 34 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    -identification of need for submission / preparation of PPAP-decision on submission level

    -Preparation of Part Submission Warrant and submitting a copy of PPAP document / sample to customer, as appropriate

    -Maintaining original PPAP documents / records

    -Maintaining master sample (s)

    -Incorporating changes required by customer in the documents and processes

    Purchasing

    PH-SP- 002 Approved Supplier List

    7.4.2 Purchasing information

    Quality management system requirements.

    design and development activity in the form of procedures, work instructions or process standards.

    Programs of design and development is monitored at defined stages / frequency, analyzed and reported with summary results imanagement reviews.

    7.3.6.3 A procedure has also been established forproduction part approval process (PPAP) addressing the following activitiesapplicable:

    Part approval process is used for suppliers. The system ensures that the engineering changes are properly validated. Review, vand validation of the newly designed and developed manufacturing process is carried out at sample / prototype, production paand pre-launch stages of production respectively. Developed product is reviewed at sample / prototype stage, verified and valiproduction part approval. Records of results of reviews, verification and validation of manufacturing process design and develactivities are maintained.

    Procedure No. QC SP 009 Parts Submission Warrant/PPAP

    7.47.4.1 Purchasing process

    MSC has established a documented procedure to ensure that purchased products conform to specify purchase requirements [inconformity to applicable regulatory requirements]. The type and extent of control applied to the supplier and the purchased prdepends upon the effect of the purchased product on subsequent product realization or the finished / final product. The Compaevaluates and selects suppliers based on their ability to supply product in accordance with the Companys requirements [wherby the customer, purchasing is done from customer approved sources only unless waived by the customer.

    Criteria for selection, evaluation and periodical re-evaluation have been established[monitoring of the supplier is done usingprocess which considers the indicators like quality, delivery schedule performance, premium freight, field return and special scustomer notification]. Records of the results of evaluations and any necessary actions arising from the evaluation at companyend are maintained.

    MGT-SP- 001 Contract Review (Sr. Manager Production Control and President)

    PH-QP- 4.6 Purchasing Materials/Components (Production Control Manager)

    MSC has established criteria for detailing adequate Purchasing Information in the Purchase Documents (in hard copies / thrmails) for the products to be procured. The product and supplier details are described in Purchase Documents or e-mails, incluapplicable:

    a) Requirements for approval of product, procedures, processes, and equipment,

    b) Requirements for qualification of personnel, and

    The authorized Production Control Manager or Purchasing Manager reviews the purchase information to ensure the adequacypurchase requirements prior to their communication or issue to the suppliers.

    MGT-SP- 001 Contract Review (Sr. Manager Production Control and President)

    PH-QP-4.6 Purchasing-Materials/Components (Production Control Manager)

    PH- SP- 005 Purchasing Indirect Materials, Tooling, Supplies(Purchasing Manager)

  • 8/7/2019 TSQualityManual.master

    35/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 35 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    Procedure No. QC SP 014 Receiving Inspection-Bar Stock

    Work Instruction PD-WI-017 Receiving Steel Bars

    Work Instruction PD-WI-HF-109 Receiving and inspection of ATV Billets

    Production and service provision7.5.1 Control of Production and Service Provision

    Equipment, tooling and gages not likely to be used for a considerable time are packaged and preserved per a checklist.

    A system has been established to assure minimum stocks of replacement parts for all key manufacturing equipment.

    Maintenance objectives are developed in the beginning of financial year which are evaluated and improved at planned interval

    A goal has been established for quality management system development of suppliers That goal is eventual supplier conformit

    ISO/TS 16949-2002. As a first phase suppliers are encougred to pursue and obtain third party certification to ISO 9001-2000to ISO/TS16949-2002 if applicable.

    7.4.3 Verification of Purchased Product

    a) MSC has established a documented procedure for implementing the Inspection / Testing or Verification of the products,necessary, for ensuring that purchased products meet the specified purchase requirements. The company ensures that throughprocedure for receiving inspection and testing, all material at incoming stage are inspected, tested/verified for conformance tospecified requirements.

    b) During verification of purchase product one of the methods as given below are followed:

    - Receipt and evaluation of statistical data

    - Receiving inspection and testing on the basis of sampling

    - Assessment of supplier by customer or third party supported through acceptable product quality record.

    - Test Report from accredited laboratory.

    - Other methodology as advised by the customer.

    c) If contractually agreed, the company also allows its customers or their representatives to verify that the purchased materisupplier end for ensuring materials conformance to specified requirements. When it is proposed to verify the purchased produsupplier's premises by either customer or companys representatives, the verification arrangements and the method of productspecified in the purchase order or its attachments.

    7.5

    Servicing, and Appearance Items are not currently a contractual part of Musashi South Carolina customer requirements, and nMSCs current manufacturing operations. If in the future these become a requirement, we will address them in accordance wit

    applicable specification, and/or standards.

    Production is controlled by way of preparing and implementing Operator Process Instructions, Work Instructions, Check Sheebar & R Charts. Suitable equipment, and monitoring and measuring devices are provided and maintained. Release and deliverare implemented.

    MSI Engineering Departments during Manufacturing Process Designing and Development process prepares initial FMEAs, Cand Operator process Instructions. These are then modified to reflect MSC actual conditions.

    7.5.1.1 Controls Plans are developed at the system, subsystem, component and / or material level for the product supplied, forstages of process development i.e. prototype pre-launch and production, from the process FMEA output.

    Control Plans are reviewed and updated when any change occurs effecting product, manufacturing process, measurement, logisupply source or FMEA.

    7.5.1.2 The manufacturing departments carry out production based on the Operator Process Instructions and prepare any additiinstructions necessary, and checklists for employee responsible for the operation of process including set up personnel, which

    accessible for use at the work station.7.5.1.3 First piece set up is approved, before allowing massproduction by authorized person during each job change of each o

    7.5.1.4 Detailed checklists developed for each process equipment are used for preventive maintenance and predictive maintenthe maintenance plans developed yearly and reviewed monthly.

    7.5.1.5 A system for maintenance of production tooling has been established including maintenance personnel storage and rec

  • 8/7/2019 TSQualityManual.master

    36/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 36 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisionsRelated procedures/Instructions:

    Shear Operations PD-WI- SH-101

    Hot Forging Press Start Up PD-WI- HF- 102 &103

    Hot Forging Press Die Change PD-WI-HF-105

    Heat Treatment PD-WI-HT-100

    Shot Blast-Billets and Forged Gears PD-WI-FSB-101

    Handling, Storage, Packing, Preservation

    Customer Supplied Parts and Packaging PH SP 001

    Final Inspection & Packing of Visteon Gears PD-WI-HT-109

    Before starting mass production, validation of processes, equipment and personnel is performed.

    Procedure No. QC-SP-009 PSW/PPAP

    setup, tool change program for perishable tools; tool and tool design modification, documentation, tool identification and tool

    7.5.1.6 The production scheduling is customer order/ forecast driven and supplies are made just in time based on customerschedules/releases and electronic dispatch instructions (EDI).

    7.5.1.7 Customer feedback from service or field performance concerns is transmitted to the company via web customer web siand phone calls.

    7.5.1.8 MSC currently does not have any service agreements with customers. If in the future Service Provisions become a reqwould develop a procedure to incorporate those requirements

    PC SP 001

    7.5.2 Validation of Processes for Production

    A system has been established and maintained for revalidation of the processes. Validation is performed by determining CPkson customer designated characteristics, and records are maintained. The validation process is defined by the customer, or PPAspecific criteria for review and approval, equipment approval, personnel qualification, methods / procedures, records requiremrevalidation.

    7.5.3 Identification and Traceability

    The Company has established a system for product identification and traceability, which requires that products be identifiableapplicable specifications, as appropriate. Incoming materials, WIP, and finished packaging are identified by a lot tag giving delot numbers, part name, and part number. Identification of all products at different stages of activity in the plant is maintainedbeginning billet shear operation through finished product to final packaging operation to the customer for all products.

    Work In-Process is also identifiable and traceable by part number lot tags. The products lot traceability is also identified throudocumented on the each parts check sheets. These sheets become quality records at each operation, and are traceable to date oproduction operations, inspection/testing / packing. The traceability lot tags are assigned at each operation and logged in and oalso provided on packaged products sent to the customers.

    The inspection and test status of items are identified through lot identification tags, inspection records, designated staging/storand placards, as applicable. The identification, inspection and test status of incoming items are identified based on suppliers tand certificate of conformance and / or the inspection and tests performed. These are then stored at designated locations. Sepahave been identified and marked for incoming materials, and non-conforming items.

    Procedure No. QC SP 015 Product Identification & Traceability

    Procedure No. QC SP 005 Lot Control

    7.5.4 Customer Property

    MSC takes due care with customer property while under the MSCs control, or being used by the MSC. MSC may receive prosamples, drawings and packaging from the customers. A documented procedure identifies, verifies, protects and safeguards tproperty provided for use or incorporation into the product. If any customer property is lost, damaged or otherwise found to bduring verification for further use, it is reported to the customer and the necessary records are maintained.

  • 8/7/2019 TSQualityManual.master

    37/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 37 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Procedure No. PH SP 001 Customer Supplied Parts and Packaging

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    Every employee is responsible for safe handling of the products at various stages of processing.

    PC SP 001 Handling, Storage, Packing, Preservation

    PC WI 002 Production Planning

    Provisions to safeguard the calibrated equipment from adjustments and setting are also made as and where applicable.

    The calibration is carried out under controlled conditions as detailed in the relevant procedures.

    7.5.5 Preservation of Product

    MSC has established a documented procedures for preserving the product quality from receipt of materials through internal prto the delivery of finished products to the intended destination. This preservation includes the product identification, handling,storage and protection of the products.

    Handling, storage and transportation of products is to be controlled to prevent damage, deterioration or loss. When necessary,particular items, special instructions are issued and monitoring is carried out to check satisfactory implementation. The approphandling of products is followed to avoid any deterioration of quality of product while in transit.

    7.5.5.1 Appropriate storage areas are provided for materials and products for protection, and to prevent damage and deterioratiproduct quality, including suitable preservation wherever necessary. The condition of the products in stock is assessed at apprintervals.

    All raw materials are issued on First In-First Out basis. An inventory management system is also used to optimize inventory tinstructions have been established for inventory management. FIFO is utilized for issuing and using stock. Obsolete productsas non-conforming.

    A system for packing, packaging, marking, considering customer packaging standard and labeling / marking requirements havestablished.

    PC WI 010 Monthly Inventory Corrections in the AS400

    PC WI 011 Process Count Inventory Adjustment

    7.6 Control of monitoring and measuring devices

    The range of measurements and required accuracies are determined by the gage control technician. Measuring devices, includisoftware if necessary, used for conforming product quality, are selected based the capability of meeting the necessary accuracprecision. This ensures that the measurement uncertainty is known and is consistent with the required measurement capability.

    The measuring devices that can affect products are identified and calibrated / verified / adjusted / readjusted at prescribed inteagainst measurement standards traceable to national / international measurement standards.

    Where no such standards exist, the basis used for calibration is recorded. If applicable, test software and test hardware used fopurposes are checked at prescribed intervals to assess their capability to verify the acceptability of product.

    Master list and calibration records containing necessary details are maintained in a controlled computer "Master file" by the QCalibration Technician, for all such devices. They are identified with a suitable indication through use of an engraved code nu

    label, or color coded mark indicating the calibration status, and due dates for re-calibration.

    Persons using the calibrated equipment are trained to handle, store and preserve them appropriately to prevent damage and maaccuracy and fitness for use.

    Any measuring devices that fail during operation, are suspect, known to be outside its designated criteria or show evidence ofdama e affectin accurac are removed from the location of use and isolated b the Ga e Control Technician. Validit of ins

  • 8/7/2019 TSQualityManual.master

    38/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 38 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

    test results of parts checked with measuring devices found to be out of calibration is assessed as applicable. If it has been detesuspect material has been shipped, MSC will recall that material from transit, or notify customer if already delivered.

    7.6.1 Measurement System Analysis is carried out for each type of measuring and test equipment, referred in the control plan,appropriate statistical techniques. The analytical methods and acceptance criteria used conform to those in customer referencemanual.

    7.6.2 Records of calibration / verification of all measuring devices include: equipment identification, measurement standard ucalibration, revisions following engineering changes, any out of specification reading as received for calibration with their ass

    impact, statement of conformance to specification after calibration and notification to customer if suspect material or productbeen shipped are maintained as defined in the relevant procedure.

  • 8/7/2019 TSQualityManual.master

    39/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 39 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    QC SP 017 Gage Control

    QC SP 026 Gage Calibration Scope

    QC SP 008 Internal Laboratory Scope

    PD-HT-703&705SM Laboratory System Skill Maps

    7.6.3.1 MSC has an established system and procedure for the internal laboratory with a defined scope, which includes the capperform the required inspection, test and calibration services.

    The technical requirements for compliance by the laboratory include: adequacy of the laboratory procedures, qualification of tlaboratory personnel conducting test, testing of commodities and capability to perform these test correctly, traceable to relevastandard (e.g. ASTM) and review of related records.

    7.6.3.2 External laboratories selected for inspection, test or calibration purposes are based on capability to perform the requireinspection/ test / calibration, and its accreditation of ISO / IEC 17025 or national equivalent or its acceptability to customer.

    Computer Software, when used in the monitoring and measurement of specified requirements, are validated at the time of instrecords are maintained. The ability of computer software to satisfy the intended application is confirmed. As and when such supdated, the same are again re-validated and the results are re-confirmed. Such software is re-confirmed at specified frequencin the documented procedure.

    Procedure Nos.

  • 8/7/2019 TSQualityManual.master

    40/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 40 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Note: Printed documents are not controlled copies-check master computer files for latest revisions

  • 8/7/2019 TSQualityManual.master

    41/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 41 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    .

    ing process:

    d approved

    tages of

    d the

    PCS),

    s done for

    itment to

    es nors.

  • 8/7/2019 TSQualityManual.master

    42/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 42 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    eeding with

    o supply,them aware

    s in relation

    for rootfurther

    nguage and

    ing process

    and/

    feasibilityentifiesh efforts on

    rements

    ia

    Operator

    re reviewedrevised if

    ivities.of the

  • 8/7/2019 TSQualityManual.master

    43/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 43 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    n the

    as

    erificationt approvalated after

    opment

    cludingductnyspecified

    ocumentedatus,or supplier

    ough e-ding where

    of specified

  • 8/7/2019 TSQualityManual.master

    44/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 44 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    (Rec.Insp.)

    s.

    y with

    nd finally

    ashisthe

    als att at therelease are

    t part ofthe

    ts, and Xactivities

    ntrol Plans,

    different

    stics,

    onal workare

    peration.

    ance as per

    overy,

  • 8/7/2019 TSQualityManual.master

    45/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 45 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    te, e-mail,

    irement, we

    at run rateP forents and

    to thetails of partfrom the

    gh the datafut, and is

    age areasgs/labels,ate areas

    ducts,e customerunsuitable

  • 8/7/2019 TSQualityManual.master

    46/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 46 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    ocessing uppackaging,

    forriate

    on of thepriate

    rns. Workre treated

    e also been

    ng testand

    rvals,

    inspection

    C Gageber, a

    intain the

    physicalection and

  • 8/7/2019 TSQualityManual.master

    47/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 47 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    usingMSA

    ed forssment of

    ay have

  • 8/7/2019 TSQualityManual.master

    48/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 48 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    bility to

    et process

    llation andftware isas referred

  • 8/7/2019 TSQualityManual.master

    49/59

    MUSASHI SOUTH CAROLINA PRODUCT REALIZATIONPage 49 of 82

    DOC NO.:MSC-QM1SECTION#: 7

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

  • 8/7/2019 TSQualityManual.master

    50/59

    MUSASHI SOUTH CAROLINAMEASUREMENT, ANALYSIS, IMPROVEMENT

    Page 50 of 82DOC NO.:MSC-QM1

    SECTION#: 8

    Issued by: Ralph Sulser

    Approved by: Keith Shepard

    Edition: 01Date: 04/02/03

    Rev. 0

    Related Procedures

    QC SP 006 Control Plans

    QC SP 007 FMEA

    HR SP 001 Human Resource Training

    QC SP 013 Statistical Process Control

    Customer satisfaction and expectations are evaluated on both perceptive as well as performance measures.

    Audit frequency is appropriately increased when internal / external non-conformances or customer complaints occur.

    Corrective actions are taken as appropriate when planned results are not achieved.

    8. Measurement, analysis and improvement

    8.1 General

    Processes have been established for monitoring, measuring, analysis and improvement needed to demonstrate conformity ofproduct, ensure conformity of the quality management system, and continually improve the effectiveness of the qualitymanagement system, including determination of applicable methods and statistical techniques.

    8.1.1 Appropriate statistical techniques are determined during manufacturing process design and included in controlplan.

    8.1.2 Training on basic statistical concepts, such as variation, control (stability) process validity and over adjustment is acompetency requirement throughout the organization.

    8.2 Monitoring and measurement

    8.2.1- A procedure has been established for evaluation of customer satisfaction, expectations and applications of measures toenhance customer satisfaction.

    Information on customer performance measures are obtained from our customers electronic web site postings of supplierrating systems. These measures include quality, delivery, and systems. Sr.Mgr.QC or Asst.Mgr. QC monitors weekly.Theinformation on perceptive measures are developed by the organization for additional customer feedback, such as phone calls,e-mail, sales communications, related to customer perceptive/performance measures.

    Countermeasures are developed and monitored for any unsatisfactory areas identified from the customer ratings, andcustomer satisfaction expectations.

    The customer satisfaction ratings are monitored, and maintained continually and evaluated for performance of the productrealization process. Customer web site information is updated monthly for key scoring criteria.

    8.2.2- The organization has a procedure for performing internal audits at planned intervals to determine if the qualitymanagement system conforms to the planned arrangements and is effectively implemented, covering all quality managementrelated process, activities and shifts.

    Specific checklists are developed for the audits. Corrective actions are taken on the non-conformance observed, in meetingthe planned results, during the audits. The audits also aim at determining the effectiveness of the manufacturing process, andproducts.

    8.2.3 Performance monitoring measures are decided for the quality management system processes. Processes performance oneach measure is measured by the concerned process owner, and measured as: Percents /$ /PPM / DPM and results presentedin Management Review Meetings.

    8.2.3.1 Process capability of each new process is studied and verified during production part approval process (PPAP).Control plans are reviewed and revised for additional control needed, if any, based on the PPAP results. PPAP results aredocumented.

    The output of the manufacturing process design and development process is in the form of Operator Process Instructions.OPIs define inspection, standards, frequencies, and methods, and other instructions to provide necessary information asmeans of production measurement, test and maintenance instructions. Also includes objectives for manufacturing processcapability, validity, maintainability and availability as well as acceptance criteria.

    Process control procedures established within the organization ensures maintaining manufacturing capability or performanceas specified by the customer part approval process requirement by following the manufacturing process design anddevelopment process output documents such as process / inspection / packaging standards and other work instructions.Significant process events are noted on the control charts and inspection records maintained for controlling the manufacturing