Trunk Highway 52 and CSAH 42 Interchange
description
Transcript of Trunk Highway 52 and CSAH 42 Interchange
![Page 1: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/1.jpg)
Efficient, Effective, Responsive
Trunk Highway 52 and CSAH 42 Interchange
Dakota County and City of Rosemount April 22, 2013
![Page 2: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/2.jpg)
Efficient, Effective, Responsive
Trunk Highway 52 and CSAH 42 Interchange
![Page 3: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/3.jpg)
Efficient, Effective, Responsive
Trunk Highway 52 and CSAH 42 Interchange
![Page 4: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/4.jpg)
Efficient, Effective, Responsive
State/Regional Significance
• TH 52 Mn/DOT Inter-Regional Corridor
• Principal Arterial / Principal Arterial Interchange
• Regional / Freeway Design
• $46,000,000 cost
• 52 Freeway Partnership Priority
![Page 5: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/5.jpg)
Efficient, Effective, Responsive
Trunk Highway 52 and CSAH 42 Interchange
![Page 6: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/6.jpg)
Efficient, Effective, Responsive
Trunk Highway 52 and CSAH 42 Interchange
• CSAH 42 Existing ADT = 12,000
• CSAH 42 Projected 2030 ADT = 27,000 – 42,000
• TH 52 Existing ADT = 34,500
• TH 52 Projected 2030 ADT = 50,000 – 58,000
• CSAH 42 classified as a non-freeway principal arterial roadway
![Page 7: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/7.jpg)
Efficient, Effective, Responsive
Trunk Highway 52 and CSAH 42 Interchange
• Fatal crash in 2007
• Crash history 2008 to 2012– 22 reported crashes at ramp intersections
– 2 life-altering crashes
– 36% of crashes were injury crashes
–Crash Rate = 0.61 and 0.39 (Metro = 0.20)
–Severity Rate = 1.11 and 0.53 (Metro = 0.30)
![Page 8: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/8.jpg)
Efficient, Effective, Responsive
Trunk Highway 52 and CSAH 42 Interchange
• Permitted UMore Mining – Truck Traffic
– 2013/2014 additional 200 heavy trucks on CSAH 42
– 2030 additional 450 heavy trucks on CSAH 42
![Page 9: Trunk Highway 52 and CSAH 42 Interchange](https://reader036.fdocuments.net/reader036/viewer/2022081507/56816295550346895dd30c17/html5/thumbnails/9.jpg)
Efficient, Effective, Responsive
Support SF 1171 Bonding Request
for $25,000,000
Questions?