Donny Barfield, H Canyon Facility Support ManagerSteve Howell, H Canyon Facility Manager
September 15, 2010
TRU RemediationIntegrated Safety Management System (ISMS)
SRNS-N2000-2010-00209
2
Integrated Safety Management System
Define the Define the Scope of WorkScope of Work
Analyze the Analyze the HazardsHazards
Implement the Implement the ControlsControls
Perform the Perform the WorkWork
Provide FeedbackProvide Feedback
4
Define the Scope of Work
3 R em ediation Paths in E A rea and H C anyon
TRU Boxed W astes D isposition Process – C urrent and Near Term
H C
anyo
nTr
uck
Wel
lH
Can
yon
War
m S
hop
CC
PE
Are
a
Container Preparation(V&P, Drain , Radiography , RTR /LC NDE ) ISO CS, RTR /LC NDE Staging LLW , M LLW Processes
Repackaging
VE, R em ediation ,Resizing, Repackaging
C haracterization , Certification
TR U PAC T-II
SLB, SW B
LSB
SLB, SW BSW B
SW B
2
3
SW B
W IPP Shipm ent
1
Inner P lywood Box
5
Define the Scope of Work
Project Statement of Work
• Project Description• Project Classification• Project Execution/Assumptions• Environmental/Safety Impacts• Safe Guards and Security• Functions/Requirements
6
Analyze the Hazards
• Consolidated Hazards Analysis- Fire- Explosions- Loss of Containment- Rad releases- Criticality- External Impacts- Natural Phenomena
• Documented Safety Analysis
• Nuclear Critical Safety evaluations
• Automated Hazards Analysis
7
Implement Controls
• Technical Safety Requirements• Radiological Work Permits• Safe Work Permits• Confined Space Permits• Training• Mock - ups• Facility Readiness Assessment• Experienced Personnel
9
Feedback
• Worker Involvement• Internal Assessments• External Assessments• Tracking• Performance Measures
10
Feedback – Worker InvolvementPost Job Briefings• Performed every day• Review the days events• Discuss positives and negatives• Assign corrective actions
Time Outs• Workers are encouraged to taketime outs when needed
11
Feedback – Internal/External Assessments
Assessments• Facility Evaluation Boards• Management Field
Observations• Facility Self Assessments