(Triveni) Rajashri Power 10 MW for ACC By

32
WEQP0903064/R0 21 March 2009 M/s RAJASHRI POWER & ISAPT LTD. 1 ST Flr, Reena Apartment,Pachpedi Naka, Dhamtari Road, Raipur .C.G. 492001. Kind Attn: Mr. Azad Jain Executive Director Sub: Offer for your requirement of 10MW Condensing TG Set. Ref:- Your enquiry RPIL/TG/02 dt.14.03.09 Dear Sir, This has reference to your E mail enq. Dt. 14.03.2009 and subsequent discussions regarding the subject requirement. Based on the details confirmed we are pleased to give our offer for . 10 MW Condensing TG Set. Suitable for Air cooled condenser system. We hope it will be in line with your requirements. However in case of any queries or clarifications required, please feel free to contact the undersigned as per your convenience. Thanking you and assuring you of our best services always. Yours Faithfully For Triveni Engineering & Industries Limited Prashant Dhanpawde Senior Manager Mketing & Sales M-9890165860 E [email protected]

description

design of turbine and parts of turbine described in this paper

Transcript of (Triveni) Rajashri Power 10 MW for ACC By

Page 1: (Triveni) Rajashri Power 10 MW for ACC By

WEQP0903064/R0 21 March 2009 M/s RAJASHRI POWER & ISAPT LTD. 1ST Flr, Reena Apartment,Pachpedi Naka, Dhamtari Road, Raipur .C.G. 492001.

Kind Attn: Mr. Azad Jain Executive Director

Sub: Offer for your requirement of 10MW Condensing TG Set. Ref:- Your enquiry RPIL/TG/02 dt.14.03.09 Dear Sir, This has reference to your E mail enq. Dt. 14.03.2009 and subsequent discussions regarding the subject requirement. Based on the details confirmed we are pleased to give our offer for . 10 MW Condensing TG Set. Suitable for Air cooled condenser system.

We hope it will be in line with your requirements. However in case of any queries or clarifications required, please feel free to contact the undersigned as per your convenience. Thanking you and assuring you of our best services always. Yours Faithfully For Triveni Engineering & Industries Limited Prashant Dhanpawde Senior Manager Mketing & Sales M-9890165860 E [email protected]

Page 2: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 2 of 32

Dear Customer, Triveni Turbine Business Group is an ISO 9001 certified company. As a commitment to environment we have laid out our environment policy which will be practiced during our operations, manufacturing and other areas of operation. We are enclosing a copy of the broad guidelines of our environment policy herewith as a part of our offer. All our products will confine to broad guidelines laid out by the above environment policy. If you wish to have a look into our environment policies, we will be glad to furnish the same. For TRIVENI ENGG. & INDUSTRIES LTD., Authorized Signatory

ENVIRONMENTAL POLICY

We, at Triveni Engineering & Industries Limited, manufacturing Steam Turbines, related products and accessories commit ourselves to:

• Comply will all applicable environmental legislation and regulations.

• Continually improve our Environmental Management System.

• Prevent pollution; reduce waste and consumption of resources, especially electrical energy and oil.

• Provide appropriate awareness / training to employees on the Environmental Management

System and the importance of good operating practices.

• Create environmental awareness amongst our associates i.e., sub contractors, Suppliers, Transporters and customers.

• Make the policy available to interested parties on their request.

CHIEF EXECUTIVE OFFICER

Page 3: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 3 of 32

I N D E X

SECTION I TECHNICAL

Chapter – 1 : Scope of Supply

Chapter – 2 : Technical Specifications

Chapter – 3 : Performance Parameters Chapter – 4 : Utilities to be provided by Purchaser

Chapter – 5 : Limits of Tender and Exclusions Chapter – 6 : List of Tools and Tackles Chapter – 7 : List of sub-vendors Chapter – 8 : Drawing & Documentation Schedule Chapter – 9 : Q A P

Chapter – 10 : Reference list Chapter – 11 : Recommended Steam Purity chart

Page 4: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 4 of 32

SECTION – I CHAPTER – 1

SCOPE OF SUPPLY PART-A MECHANICAL Steam Turbine Multistage, Nozzle governed, Horizontal spindle, two bearings, Impulse type Extraction Bleed cum condensing steam Turbine with: - Hydraulically operated Stop & Emergency Valve with integral steam strainer for inlet - Hydraulically operated Throttle/Governing valves for inlet steam flow control Safety devices - Over speed trip (Mechanical & Electrical) and alarm - Low lube oil pressure trip and alarm - Low control oil pressure trip and alarm - High thrust wear trip and alarm - High exhaust/condenser pressure trip and alarm - Manual trip (Hand trip) - Vibration high trip & alarm - Remote emergency trip (Solenoid trip) - DP across lube oil filters high alarm Gearbox - Double helical, single reduction Gearbox with hardened & ground gears. The design will be as

per AGMA standards with a service factor of 1.3 Couplings - Non-lubricated, steel laminated, flexible type, high-speed coupling and low speed couplings

with coupling guards. Governing System - Electronic governor (Woodward 505) complete with electro-hydraulic actuators and magnetic

speed pick ups - A.C. motor driven Auxiliary Control Oil Pump (ACOP) - Hydraulic accumulator - Control oil filter - Interconnecting control oil piping Lubrication System Forced feed lubrication system, common for Turbine, Gearbox & Alternator comprising of: - Lube oil tank (combined with turbine base plate) provided with cleaning doors and air breather - Main Oil Pump (MOP) driven by gearbox low speed shaft - A.C. Motor driven auxiliary oil pump for flooding the bearings during start-up and wired

through a pressure switch for automatic cut-in and cut-out in the event of main oil pump not supplying required quantity of oil.

- D. C. Motor driven Emergency lube Oil Pump (EOP) with auto cut-in & cut-out facility - A. C. Motor driven Main Control Oil Pump (MCOP) - A. C. Motor driven Auxiliary Control Oil Pump (MCOP) - Suction strainers for MOP, AOP, EOP, MCOP and ACOP - Pressure relief valves for discharge of MOP, AOP, MCOP, ACOP and lube oil line - Oil coolers (1 working + 1 standby) with on-line changeover arrangement - Oil filters (1 working + 1 standby) with on-line change-over arrangement - AC motor driven oil vapour extractor mounted on oil tank

Page 5: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 5 of 32

- Pressure regulating valve to achieve desired lube oil pressure - Set of complete lube oil piping within the limits of the turbine base frame and sufficient to meet

the requirement of the ordered equipment. (The lube oil pipe will be SS downstream the filter) Accessories

- Motorized barring gear arrangement - Base plate for turbine and gearbox - Insulation for Turbine hot parts (lagging & cladding) - Set of foundation bolts. - Vibration Monitoring System for high speed train only ( Shinkawa Make) - Set of special tools & tackles for maintenance - Mating flanges for all the equipment connections in our scope of supply - Oil Centrifuge System - NRV,ISV and FFRV for bleed system (loose supply) -

PART-B ELECTRICAL AC Generator AC Generator shall be complete with following: - Brush-less exciter - Air coolers - Twin bearings - Digital AVR cum Excitation panel - Anti-condensation heaters - Water leakage detector– 1 per cooler - Lube oil flow regulator – 1 per bearing Auxiliaries for Generator protection and control - Generator protection (Relay) Panel - Metering & synchronizing panel - Lightning arrestor, Surge capacitor and Potential transformer (LA, SC & PT) panel - Neutral grounding resistor (NGR) panel - Battery & - Battery charger cum DC distribution panel - TG MCC Panel PART-C CONTROL & INSTRUMENTATION The following field instruments will be provided on the equipments supplied by Triveni. Turbine - Dial type pressure gauges for:

• MOP, AOP & EOP discharge • Gland steam header • Gland steam return lines

- Dial type Diff. pressure indicator with switch for monitoring DP across lube oil filters - Pressure switches for:

• Lube oil pressure very low trip & alarm • Control oil pressure low alarm • AOP auto cut-in & cut-out • EOP auto cut-in & cut-out

- Transparent level gauge for oil tank - Dial type temperature gauges for:

Page 6: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 6 of 32

• Gearbox bearing oil • Oil cooler inlet & outlet

- RTDs for: • Turbine bearing oil • Gearbox bearing oil

Generator - Dial type pressure gauge for lube oil - 1 per bearing - Dial type temperature gauges for:

• Bearing oil – 1 per bearing • Hot air & cold air – 1 each per cooler

- Temperature sensors for:

• Winding temperature (embedded RTDs) – 4 per phase • Bearing oil temperature (duplex RTD) – 1 per bearing • Hot air & cold air – 1 each per cooler

- Temperature scanner to monitor Generator winding and bearing oil temperature. Turbine Control Panel

TC Panel shall house electronic governor, alarm annunciator for turbine faults, temperature scanner for turbine & gearbox bearing oil temperature monitoring, remote controls for all auxiliary motors of turbine (AOP, EOP and barring gear), condenser hotwell level controls, turbine safety interlocks & trip logic and turbine speed controls (push buttons).

Turbine Gauge Panel TG Panel shall house the pressure and temperature gauges for various operating parameters, speed indicator and speed raise and lower push buttons for turbine. Impulse piping with fittings shall be supplied loose for interconnection between field tap-off points and gauge panel.

Turbine Aux. MCC

MCC Panel shall house: - DOL starters for:

• AOP motor • CEP-1 & 2 motors • Barring gear motor • Vapour extractor motor

DC motor (EOP) starter panel cum DCDB

DC motor starter panel shall house feeder & control circuit for EOP motor. Local push button station

Local control stations with on/off push buttons for: • AOP 1 & 2 motors • EOP motor • Barring Gear motor • Vapour extractor motor

Page 7: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 7 of 32

SECTION - II CHAPTER – 2

TECHNICAL SPECIFICATIONS PART – A MECHANICAL STEAM TURBINE

Design: Type : Multistage, impulse, nozzle governed bleed cum

condensing Casing split : Horizontal Rotor type : Solidly forged & machined rotor with integral disks.

Shaft seal : Labyrinth No. of governing valves : Three (Inlet) Bearing support : Double pedestal Rated speed : 6827 RPM Rated power : 10000 kW

Oil system: - Oil: Governing oil pressure : 14 kg/cm2g

Lube oil pressure : 1.5 Kg/Cm2g Oil type : Servo prime ISO VG-46 / 57 / 68

Retention time : 5 minutes Material of oil reservoir : Carbon steel Material of oil piping from

Pumps to filters : Carbon steel Material of oil piping from

Filters to bearings : SS Material of oil piping from

Bearings to reservoir : Carbon steel - Main oil pump:

Type : Gear (positive displacement)/Screw Operating speed : 1500 rpm Capacity : 650 Liters/minute Driver : Gearbox low speed shaft Material of body : CI Material of end cover : CI Material of drive gear : EN 36 / EN 40

- Auxiliary oil pump : Type : Gear (positive displacement)/Screw Operating speed : 1500 rpm Capacity : 650 Liters/minute Driver : AC motor (22 kW, 415 V, 3 Phase) Material of body : CI Material of end cover : CI Material of drive gear : EN 36 / EN 40

- Main & Auxiliary Control oil pump:

Type : Gear/Screw (positive displacement) Operating speed : 1500 rpm Capacity : 68 Liters/minute Driver : A.C. Motor (2.5 kW, 415 V, 3 Phase)

Page 8: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 8 of 32

Material of body : CI Material of end cover : CI

Material of drive gear : EN 36 / EN 40

- Emergency oil pump: Type : Gear (positive displacement) Operating speed : 1500 rpm Capacity : 200 Liters/minute Driver : DC motor (5 kW, 110 V, DC) Material of body : CI Material of end cover : CI Material of drive gear : EN 36 / EN 40

- Oil cooler : Design code : HEI / TEMA

Type : Plate type Oil inlet temperature : 60 0C Oil outlet temperature : 46 0C Oil flow Capacity : 630 Liters/minute Mounting : Saddle support

- Lube oil filter: Element type : Micro-felt

Oil flow Capacity : 650 Liters/minute Oil filtration Capacity : 10 – 15 microns Mounting : Foot - Oil Vapour Extractor:

Type : Centrifugal Capacity : 400 m3/Hr Driver : AC Motor (0.375 KW, 415 V, 3 Phase) Mounting : Flange Bearings:

- Journal Bearings Type : Tilting pad

Material : White metal with steel Babbitt

- Thrust Bearings Type : Tilting pad Material : White metal with steel Babbitt Governing System: - Governor:

Type : Electronic Inputs (critical) : 2 speeds from MPU-1 & 2 Control range : 80 to 110% of rated speed Control accuracy : As per NEMA class D

Speed droop : 3 to 6% (programmable) Power supply : 110 V DC Accessories : 2 Magnetic speed pick-ups (MPU)

1 electro-hydraulic actuator - Hydraulic Accumulator:

Page 9: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 9 of 32

Type : Bladder Working fluid : Pre-charged Nitrogen Capacity : 20 Liters

- Governing oil filter:

Element type : Micro-felt Oil flow Capacity : 35 Liters/minute Oil filtration Capacity : 10 – 15 microns Safety devices:

- Over speed trip: Type : Eccentric spring loaded oil dump valve

- Low lube oil pressure trip: Type : Spring loaded spool valve combined with LP trip

- Low control oil pressure trip:

Type : Spring loaded spool valve combined with LP trip

- High thrust wear trip: Type : Through Vibration Monitoring system

- High exhaust pressure trip: Type : Through pressure switch and solenoid trip

- Hand trip: Type : Block & dump valve in trip oil line Operation : Local hand lever

- Solenoid trip: Type : Solenoid operated block & dump valve Operation : De-energise to open & trip GEARBOX

Design: Type : Double helical, Single reduction Input / Output speed : 6827 / 1500 RPM

Ratio : 4.55 : 1 S.F. : 1.3 AGMA Accessory : Air breather COUPLINGS

- High Speed Coupling Type : Flexible element with shear pins

- Low Speed Coupling

Type : Flexible element ACCESSORIES

- Barring gear: Type : Auto disengage Driver : AC motor (22.0 kW, 415 V, 3 Phase) Turbine connections:

For Number Size Rating Orientation

Page 10: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 10 of 32

Inlet steam One 8” NB ANSI 900 # RF Side Exhaust steam One � Special � Down

Noise level : 90 dB(A)

PART – B ELECTRICAL AC GENERATOR (TDPS make) Design: Rated output : 10000 kW Rated voltage : 11 kV +/- 10% Rated current :

Rated frequency : 50 Hz + / - 5% Combined variation of voltage & frequency : + / - 10% Rated p.f. : 0.8 (lag) No. of phases : 3 phase No. of terminals : 3 for phase & 3 for neutral

Connection : Star Rated speed / No. of pole : 1500 rpm / 4 pole Short circuit ratio : More than 0.5 Ambient temperature : 45 Deg.C Excitation : Brush less Rotor : Cylindrical Cooling method : CACW Mounting : Horizontal Insulation : Class F (both rotor and stator) Temperature rise : Class B limits (both rotor and stator) Enclosure : IP-54 (Stator) & IP-23 (Exciter) Duty : Continuous and suitable for parallel operation Rotation : To suit driver output Noise level : 90 dB(A) Terminal box : To suit HT cables Reference standard : IS-4722 Harmonic loading : IEEE 519

Bearings: Type : Sleeve Accessory : Temperature gauge

Lube oil system: Type : Forced feed

Source : Turbine lube oil system Air coolers:

Cooling method : CACW Capacity : 2 x 60%

Cooler tube material : Admiralty brass/stainless steel Mounting : Top/Side

Anti condensation heaters:

Type : Resistance heating

Page 11: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 11 of 32

Power supply : 230 V, Single phase

Water leakage detector: Location : Bottom of cooler Quantity : 1 No. per cooler

AVR CUM EXCITATION PANEL

Design: Control type : Digital Control modes : 1 auto + 1 manual Voltage adj. Range : +/- 10% Regulation : +/- 0.5% Dead time : Less than 30 mS

Features: - Compounding - Remote voltage control - Auto-Manual follow-up - Under frequency protection - Field flashing provision

AVR cum excitation panel shall be complete with generator voltmeter, field voltmeter, field

ammeter, PF meter, null meter, Auto/Manual selector switch, AC supply & DC supply on /off control switches, indicating lamps and space heater with thermostat.

GENERATOR RELAY PANEL

Generator relay panel shall house the following: - Numeric Relay for generator protection:

DESCRIPTION TAG NO.

Under voltage protection relay 27 Reverse active power protection relay 32P Loss of excitation (Field failure) protection relay 40G Auxiliary relays & timers for loss of excitation protection relay

40X 27/40G T1/40G T2/40G

Negative phase sequence protection relay 46 Voltage controlled over current protection relay 51V Over voltage protection relay 59 Timer for over voltage protection relay 2-59 PT fuse failure sensing relays 60A

60B 60C

Stator earth fault protection relay 64 DC supply supervision relay 80 Under & over frequency protection relay 81 Differential protection relay 87 Generator master trip relay 86G Turbine master trip relay 86T

The panel shall be complete with AC supply & DC supply on /off control switches, indicating lamps and panel space heater with thermostat.

Page 12: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 12 of 32

General:

Type : Simplex, dead front & free standing Dimensions in mm : 1000 (L) x 1000 (D) x 2310 (H) Weight : 800 KG

GENERATOR CONTROL (METERING CUM SYNCHRONISING) PANEL

Generator control panel shall house the following:

- Meters Type : Digital

System : 3 phase, 4 wire, unbalanced load Reference standard : IS-1248

Ammeters : 3 Nos. Voltmeter : 1 No. with selector switch KW meter : 1 No. KVA meter : 1 No. KVAR meter : 1 No. PF meter : 1 No. Frequency meter : 1 No. Trivector meter : 1 No.

- Synchronising equipment

Double voltmeter : 1 No. Double frequency meter : 1 No. Synchroscope : 1 No. Check synchronizing Relay : 1 No. Aux. relays for Synchronising scheme : 1 Set Auto Synchroniser : 1no.

- Temperature scanner for monitoring generator winding and bearing temperature

- Alarm annunciator for generator fault monitoring The panel shall be complete with synchronising selector switches, breaker control (T/N/C) switches, push buttons, AC supply & DC supply on /off control switches, indicating lamps and panel space heater with thermostat.

General : Type : Desk & free standing Dimensions in mm : 1200 (L) x 1100 (D) x 2310 (H) Weight : 750 KG LA, SC & PT PANEL

LA, SC & PT panel shall house the following :

- Lightning arrestor

Discharge current : 10 kA Quantity : 3 Nos. (1 per phase)

Page 13: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 13 of 32

- Surge capacitor

Capacitance per phase : 0.25 µF Quantity : 3 Nos. (1 per phase)

- Potential transformers

For Quantity Secondary output Class

Protection 3 Nos. 110 V 3 P Metering 3 Nos. 110 V 1 Excitation 1 No. 415 / 240 V 3

The panel shall be complete with AC supply on /off control switch, illuminating lamp with limit switch for each PT compartment, indicating lamps and space heater with thermostat.

General : Type : Simplex, modular & free standing Terminal box : To suit HT Cables Material of busbars : Aluminium Dimensions in mm : 1800 (L) x 1650 (D) x 2350 (H) Weight : 1,000 KG NEUTRAL GROUNDING RESISTOR PANEL

NGR panel shall house the following: - Resistor

Type : Naturally air cooled Rated current : 100 A Duty rating : 10 seconds Resistor grid type : Punched steel Temperature rise : 3750 C over ambient (max.) Mounting & fixing of Resistor units : Mounted on grid rods; fixed and assembled in tiers

separated by porcelain insulators - Neutral isolator

Operation : Manual. No. of poles : One Limit switches : 2 Nos. (for on / off positions)

- Earth connection Type : Porcelain insulated 12 mm terminal studs Quantity : Two Nos.

- Current transformers

For Quantity Secondary output Class Generator protection

3 Nos. 1 A 5 P 10

Differential protection

3 Nos. 1 A PS

Earth fault protection

1 No. 1 A 5 P 10

Metering 3 Nos. 1 A 0.5

Page 14: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 14 of 32

Compounding 1 No. 1 A 1

The panel shall be complete with AC supply & DC supply on /off control switch, illuminating lamp with limit switch for each PT compartment, indicating lamps and space heater with thermostat.

General: Type : Simplex, dead front & free standing Terminal box : To suit HT Cables Material of busbars : Aluminium Dimensions in mm : 1500 (L) x 1000 (D) x 1400 (H) Weight : 1,000 KG BATTERY Type : Maintenance Free Capacity : 400 AH Rating : 110 V, DC Volt per cell : 2 V, DC No. of cells : 55 BATTERY CHARGER CUM DC DISTRIBUTION PANEL

Battery charger cum DC distribution panel shall house the following: - Battery charger

Quantity : One float & one float cum boost charger Input : 240 V, 1 phase, 50 Hz, AC supply Output : 75 A, 110 V DC (Float charger) 80 A, 110 V DC (Float cum boost charger) Voltage regulation : +/- 1% from no-load to full load Operation mode : Auto / Manual Charger panel shall be provided with alarm for following faults :

• Float charger failed • Float cum boost charger failed • DC voltage high • DC voltage low • AC supply failed • Batter earth fault

Charger panel shall house following meters :

• AC Voltmeter • DC Voltmeter with selector for load/charger/battery • DC Ammeter for load • DC Ammeter for charger • DC Ammeter for battery

- DC distribution system

Panel shall be provided with feeders for: DC motor starter panel : 1 No. HT Breaker panel : 1 No. Relay panel : 1 No. Generator control panel : 1 No. AVR cum excitation panel : 1 No.

Page 15: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 15 of 32

Turbine control panel : 1 No. Spare : 2Nos.

General : Type : Simplex, dead front & free standing Dimensions in mm : 1200 (L) x 1000 (D) x 1800 (H) Weight : 300 KG

AC MOTORS

Type : Induction Winding connection : Delta Duty : Continuous Enclosure : IP-55 Cooling : TEFC Insulation : Class “F” Power supply : 415 V, 3 Phase, 50 Hz Speed / No. of poles : To suit driven equipment

DC MOTOR

Type : Shunt field Duty : Continuous Enclosure : IP-55 Cooling : TEFC Insulation : Class “F” Power supply : 110 V Speed : 1440 RPM

TURBINE CONTROL PANEL

Turbine control panel shall house the following: - Electronic governor with keyed-in operating program - Condenser hotwell level indicator cum controller - Relay based hard wired turbine safety interlocks and trip logic - Remote controls comprising of selector switches, ammeters, push buttons & indicating

lamps for: • AOP motor • EOP motor • Barring gear motor • Vapour extractor motor

- Push buttons for turbine speed raise and lower - Turbine remote trip/reset push buttons - Temperature scanner for Monitoring turbine and gearbox bearing temperature - Alarm annunciator for Turbine fault monitoring

The panel shall be complete with AC supply & Dc supply on /off control switches, indicating lamps and space heater.

TURBINE GAUGE PANEL

Turbine gauge panel shall house the following gauges: - Pressure gauges for:

Inlet steam HP Wheel case Bleed Steam

Exhaust steam

Page 16: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 16 of 32

Lube oil Control oil

- Temperature gauges for:

Inlet steam Bleed steams Exhaust steam

TURBINE AUXILIARY MCC

MCC panel shall house the following:

- Incoming feeder complete with switch-fuse unit, voltmeter, CT operated ammeter, indicating lamps & bus bars

- DOL starter complete with switch-fuse unit, contactor, overload relay, CT operated

ammeter, indicating lamps & pushbuttons for : • AOP motor • Barring gear motor • Vapour extractor motor

- Turbine speed indicator and speed raise / lower push buttons DC MOTOR (EOP) STARTER PANEL

DC motor starter panel shall house the following:

- Incoming feeder complete with switch-fuse unit, voltmeter, ammeter and indicating lamps - 2 step resistance starter for EOP motor complete with switch-fuse unit, contactor, overload

relay, ammeter, indicating lamps & pushbuttons.

Page 17: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 17 of 32

GENERAL SPECIFICATIONS OF INSTRUMENTS - Pressure and Temperature Gauges Dial : 150 mm circular Scale : 270 Deg. arc with black pointer Type : Bourdon (pressure gauge) Mercury in steel (temperature gauge)

Accuracy : +/- 1 % Over range protection : 125 % Accessories : Shatter proof safety glass - Pressure Switch

Sensor type : Bellows Material of case : Die cast aluminium Material of bellows : SS-316

- Pressure Transmitter Type : 2 wire, capacitance & electronic Input : Direct Output : 4 – 20 mA Material for process

connection internals : SS-316 - Resistance Temperature Detectors:

Element type : PT-100, 3 wire

- Solenoid Valve Power supply : 110 V DC Operation : De-energise to open Type : 2 way, universal ports - Current to Pneumatic Converter Supply : Air at 1.5 Kg/cm2g Input : 4 – 20 mA Output : 0.2 to 1.0 Kg/cm2g (air) Enclosure : Die-cast aluminium alloy body Accessory : Pressure gauges for supply & output - Temperature Scanner Power supply : 230 V, AC, Single phase Input : PT-100, 3 wire RTD

Display : Channel No. & bearing / winding temperature

Display mode : Auto / Manual Scan rate : Programmable Accuracy : +/- 1 Deg.C - Alarm Annunciator Type : Modular, plug-in cards, interchangeable Input protection : Optical isolation provided through opto couplers Colour of window : Milky white (pre-trip alarm) Red (Trip alarm) Power supply : 110 V DC

Page 18: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 18 of 32

Fault initiation : Make to alarm Accessories : Electronic hooter and Push buttons for Test,

Acknowledge & Reset - Air Filter Regulator

Filter element : 5 microns Element material : Sintered bronze Body material : Cast aluminium

* * *

Page 19: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 19 of 32

SECTION - I CHAPTER – 3

PERFORMANCE DATA

Turbine : Multistage Impulse extraction cum condensing Gear box output speed : 1500 rpm

Inlet steam pressure : 64 kg/cm2A Inlet steam temperature : 490 C Inlet flow : 41.9 TPH Bleed for deaearator : 4.81 ata Bleed flow : 4.80 TPH Exhaust pressure : 0.17ata Exhaust flow : 37.10 TPH Power Generation : 10.0 MW TG Rating : 10.0 MW Note: 1. The above consumption data apply at steady state conditions, with the control valve fully

open, deposit free blading and clean surface of cooling equipment in accordance with the Triveni performance Test Procedure which is based on the ASME - PTC 6 code.

2. This consumption does not include the power and steam requirements of the condensing

plant and auxiliary equipments. Instrumentation tolerance of +or- 3.0% is allowed as per the international testing practices.

3. The data furnished are based on nominal main steam parameters at turbine inlet flange. 4. The following are not included in the auxiliary power consumption furnished in Auxiliary

power guarantee. a) All standby equipments. b) All electrical actuators and motorized valves c) Other intermittent equipments

5. The steam consumption for and auxiliary equipments such as ejector motive steam, gland-sealing steam etc. is not included in the steam consumption figure for turbine performance.

6. Auxiliary power consumption indicated is at motor input terminals.

Page 20: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 20 of 32

SECTION – I CHAPTER – 4

UTILITIES TO BE PROVIDED BY THE PURCHASER A. STEAM (SATURATED)

CONSUMER / PURPOSE INTERMITTENT DEMAND

CONTINUOUS DEMAND

Turbine gland sealing system at 10 Kg/cm2

300kg/Hr (during start-up)

N/A

Ejector system at 10 Kg/cm2

400 kg/Hr (during start-up)

350 Kg/Hr

B. COOLING WATER (FRESH) Inlet pressure : 2.5 Kg/cm2g Inlet temperature : 32 Deg. C Temperature rise (∆T) : 8 Deg. C

CONSUMER / PURPOSE CONTINUOUS DEMAND

Steam surface condenser NA Turbine oil cooler 80 M3/hr Generator air cooler 80 M3/hr Gland Vent Condenser 50 M3/hr

C. INSTRUMENTATION AIR 1. For control purpose : 5 SCFM at 7.0 Kg/cm2 D. AC POWER Power supply : 415 V, 50 Hz, TP & N

CONSUMER INTERMITTENT DEMAND

CONTINUOUS DEMAND

AOP Motor 15 kW (During start-up & shut-down)

N/A

CEP Motor N/A NA Air Blower Motor N/A 1.5 kW Vapour Extr. Motor N/A 0.75 kW Barring Gear Motor 22 kW

(During shut-down) N/A

ACOP Motor 2.5 kW N/A MCOP Motor N/A 2.5 kW

Note : All utility figures mentioned above are indicative only. The actual requirement shall be

furnished during detailed engineering.

Page 21: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 21 of 32

SECTION - I CHAPTER – 5

LIMITS OF TENDER & EXCLUSIONS LIMITS OF TENDER: The offer is complete within the following limits beyond which Purchaser shall arrange any and all equipments:

1. Inlet flange of Stop and emergency valve of the turbine. 2. Bleed and exhaust flange of the turbine. 3. Inlet and outlet flanges of the cooling water connections of oil cooler, and generator air

cooler. 4. At the inlet of gland sealing for auxiliary steam. 5. Turbine drains with drain cocks terminated at nearest drain point. 6. Instruments, air connections within the battery limit of not more than 5 meters from the

turbine. 7. Utility / Auxiliary power at the control panel terminals. 8. Incoming terminals of alternator.

EXCLUSIONS: The following items are not included in sellers scope of supply and shall be arranged by purchaser:

1. Steam and cooling water piping. 2. Any piping and valves outside the above limits. 3. Air cooled condenser system with expansion bellow 4. Steam flow meters. 5. Platforms, ladders of floor/platforms, foundation or civil work of any nature including

their design. 6. Routing design for piping and supports. 7. Utility/Auxiliary & emergency power and air supply. 8. Inlet isolation valve and PRDS for auxiliary steam supply. 9. All HT cables, LT cables, control and signal cables along with cable

termination,glands,cable trays,ducts etc. 10. Electrical distribution system, outdoor switch yard & associated equipments. 11. De-aerator, Cooling Tower, related instruments and piping. 12. VCB panel. 13. UPS. 14. Oil Centrifuge. 15. PLC/SCADA. 16. Emergency overhead lube oil tank. 17. Fire detection, alarm and protection system. 18. Crane gantry. 19. Complete earthing and earth pits 20. First fill of oil and Flushing oil 21. All/any statutory approvals. 22. Any other item not specifically mentioned in “Scope of Supply”.

Page 22: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 22 of 32

SECTION - I CHAPTER – 6

LIST OF TOOLS AND TACKLES

EQUIPMENT DESCRIPTION QUANTITY

TURBINE Rotor lifting arrangement 1 Set Overspeed trip cap removal bolt 1 No. Fixture for putting oil seals with cover 1 No. Allen keys 1/16” to ¾” 1 Set Circlip plier (internal & external) 6” 1 No. each Double end spanner ¼” x 5/16” 1 No. Double end spanner 3/8” x 7/16” 1 No. Double end spanner ½” x 9/16” 1 No. Double end spanner 5/8” x ¾ “ 1 No. Double end spanner 7/8” x 1” 1 No. Double end spanner 24/27 mm & 30/32 mm 1 No. each Double end spanner 1” x 1-1/8” 1 No. Single end spanner 1-¼ ” 1 No. Ring spanner 1” x 1-1/8” 1 No. Ring spanner 1 ½” x 1 ¾” 1 No. Ring spanner 24/27 mm & 30/32 mm 1 No. each Open end spanner 1-½ ” & 1-¾” 1 No. each Screw driver 6” & 12” 1 No. each Adjustable spanner 6” 1 No.

* * *

Page 23: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 23 of 32

SECTION -I

CHAPTER - 7

List of sub-vendors

Please refer the attached separate list

Page 24: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 24 of 32

SECTION - I CHAPTER – 8

DRAWING AND DOCUMENTATION SCHEDULE

DRAWING / DOCUMENTATION

DESCRIPTION INFORMATION (I) /

APPROVAL (A) FINAL

P&I diagrams with Bill of materials for : - Steam, condensate & ejector system - Governing & lube oil system - Cooling water system

2 sets (A) 4 sets

Foundation Block Plan 2 sets (A) 4 sets Power House Lay-out 2 sets (A) 4 sets Electrical Single line diagram 2 sets (A) 4 sets GA Drawing of Turbine 2 sets (I) 4 sets GA Drawing of Condenser 2 sets (I) 4 sets GA Drawing of Ejector 2 sets (I) 4 sets GA Drawing of CE pumps 2 sets (I) 4 sets GA Drawing of Alternator 2 sets (I) 4 sets GA & Schematics of AVR Panel 2 sets (I) 4 sets GA & Schematics of LAPT & NGR Panels 2 sets (I) 4 sets GA & Schematics of Relay Panel 2 sets (I) 4 sets GA & Schematics of MCS Panel 2 sets (I) 4 sets GA & Schematics of TCP & TGP 2 sets (I) 4 sets GA & Schematics of TG Aux. MCC 2 sets (I) 4 sets GA & Schematics of DC Motor starter 2 sets (I) 4 sets GA & Schematics of Battery charger 2 sets (I) 4 sets Performance curve -- 4 sets Electronic governor program chart -- 4 sets Relay setting chart -- 4 sets Cable Schedule -- 4 sets Maintenance manuals -- 4 sets NOTE : 1. Drawings shall be submitted for information / approval within 8 to 12 weeks from date of

receipt of technically & commercially clear purchase order/LOI. You shall approve all drawings submitted for approval within a period of 15 days of submission failing which our delivery will get affected.

2. Final drawings and documents shall be submitted along with supply of equipment.

Page 25: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 25 of 32

SECTION - I CHAPTER – 9

Q A PLAN

EQUIPMENT DESCRIPTION

TESTS

Complete assembled turbine 1. Visual & dimensional checks 2. No-load run test & functional

check on safety devices 3. Vibration check 4. Noise level check 5. Open inspection & dynamic rotor

balancing (after no-load run test) Condenser 1. Visual & dimensional checks

2. Hydrostatic test Ejector 1. Visual & dimensional checks

2. Operational & functional tests CE Pumps 1. Visual & dimensional checks

2. Operational & functional tests Complete assembled generator 1. Visual & dimensional checks

2. OCC & SCC test 3. Over speed test 4. Vibration check 5. Noise level check 6. HV test 7. Measurement of winding resistance and

insulation resistance 8. Measurement of shaft voltage

LAPT panel / NGR panel /AVR panel / Relay panel / Met. cum synch. panel / TCP / Battery charger panel / Aux. MCC

1. Visual & dimensional checks 2. Operational & functional tests 3. HV test 4. Measurement of insulation resistances

Turbine Gauge Panel 1. Visual & dimensional checks 2. Range calibration

Instruments 1. Visual & dimensional checks 2. Operational & functional tests 3. Range calibration

NOTE : 1. Material test certificates from manufacturers shall be submitted for major

components of turbine and other bought-out items along with supply. 2. We have not envisaged any “customer hold point” in QAP and delivery & price

quoted are on the same basis.

Page 26: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 26 of 32

SECTION-I CHAPTER – 10

REFERENCE LIST

Refer attached reference list

Page 27: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 27 of 32

SECTION I CHAPTER 11

RECOMMENDED STEAM PURITY

Technically pure steam is of such quality, that it does not cause deposits in the steam pre-heaters, in the fittings, heaters as well as in the turbine, which might require the intentional shut-down of the boiler or some part of the equipment, for their cleaning, outside of the normal equipment maintenance program. The recommended or limit values of the purity of steam are stated in the following table. The values are given in the maximal allowable day average concentrations. The concentration of the chlorine ions may be max. 3 µg.l-1.

IDENTIFIER Unit Recommended values Limit values Specific electrical conductivity γ at 25oC 1) µS.cm-1 0.3 1 Silicon dioxide (SiO2) µg.l-1 20 Sodium and potassium (Na+ + K+) µg.l-1 10 35 Total Fe contents (Fe) µg.l-1 20 Ammonia (NH3) mg.l-1 1 Copper-total Cu µg/kg 3

1) Measured after the flow through strong acidic H-katex. NOTE: The measurement of the electrical conductivity γ at 250 C (µS/cm-1) must be done

without the presence of operational chemical agents, e.g. ammonia or hydrazine, which tends to increase the conductivity. This is why the measurement of specific electrical conductivity has to be done after the flow of the sample through the strong acidic H-katex, which is the filter that keeps all cations of the chemical compounds. By the filtration chemically pure water can be obtained.

RECOMMENDED STEAM PURITY - LIMITS

Continuous Start UP Conductivity Micro-Ohms/cm at 25 0c Drum 0.3 1.0 Once through 0.2 0.5 SiO. ppb, max. 20 50 Fe. ppb, max. 20 50 Cu. ppb, max. 3 10 Na + K, ppb, max. Upto 800 PSIG 20 20 801 to 1450 PSIG 10 10 1451 to 2400 PSIG 5 5 Over 2400 PSIG 3 3

NOTE : THE ABOVE DATA IS ADAPTED FROM NEMA STANDARD PUBLICATION NO. SM23 (1985) PAGE 40 SECTION 10.7

Page 28: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 28 of 32

SECTION-II

CHAPTER – 1

SPECIAL COMMERCIAL TERMS & CONDITIONS OF SALE THIS OFFER IS SUBJECT TO THE CONDITIONS MENTIONED HEREUNDER:

PRICE: For Supply of 10MW TG set. Rs. 595.00Lacs,[Rs. Five Hundred and ninty five lacs only] Ex-works, inclusive of packing & forwarding but exclusive of all taxes, duties and transit insurance and freight. This above price is based on scope of supply described in Chapter-1 of Section-I of our quotation and will be confined to the limits defined in the "Limits of Tender" and will also be subject to the “Exclusions” as per Chapter-5 of Section-I of this offer attached hereto. For Erection and Commissioning of 10MW TG set. Rs. 20.00 lacs (Rs. Twenty Lacs only) for Erection and Commissioning of equipments in our scope of supply. DELIVERY 11 months ex works basis from the date of receipt of your technically and commercially clear order and advance amount. This delivery is subject to the Force Majeure clause as given in our General Commercial Terms & Conditions of Sale. In case of any delay on your part in giving technical and / or commercial clearance and / or payment of advance, the delivery shall stand postponed automatically. Further in the event of your delay / non-payment of our bills for supplies already made, we shall be entitled to hold further supplies till we receive your payment. E & C- 2 months TERMS OF PAYMENT

1. 20% of the total order value along with your LOI / Purchase Order. 2. 10% of the total order value as against submission of major contractual drawings. 3. 10% of the total order value against proof of placement of orders for major bought outs. 4. Balance 60% of the total order value along with all taxes and duties against proforma invoice

on pro-rata basis before dispatch. TAXES AND DUTIES The price quoted is ex-works/our sub-contractors works. Taxes & duties shall be charged extra at actuals at the rates effective at the time of despatch. PRICE VARIATION The price quoted above is firm for the duration of the contract except for statutory variations. If delivery is delayed due to reasons attributable to you, the price escalation shall be mutually discussed and agreed upon. In case of any imported equipment, where we may have declared the quantum of imports in Indian Rupees, this amount would be subject to Foreign Exchange & Import duty variation.

Page 29: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 29 of 32

WARRANTY The equipment supplied by us is guaranteed for a period of twelve calendar months from the date of commissioning of the equipment or eighteen calendar months from the date of despatch whichever occurs earlier. Our liability is limited to making good any defects in design, material or workmanship developing in goods of our own manufacture under proper use and arising solely from faulty design, materials or workmanship provided always that such defective parts are promptly returned free to our works unless otherwise arranged. The repaired or new parts will be delivered free of charge F.O.R. station of despatch. At the termination of such period all liability on our part ceases. While all reasonable precautions are taken in the design of our machinery to resist normal operational hazards, we would respectfully point out that our guarantee does not cover damage due to carry over water or solid particles or corrosive and fouling effects of contaminated feed waters and / or omissions / commissions attributable to you. GENERAL COMMERCIAL TERMS AND CONDITIONS OF SALE : This tender and any contract which may result there from is subject to our “General Commercial Terms & Conditions of Sale” (enclosed herewith), except as may otherwise be agreed to in writing, or as may be modified in the main body of this tender. In case of any conflict between the Special Terms and Conditions of Sale & the General Terms and Conditions of Sale, the former will prevail.

VALIDITY This quotation stands valid for 30 days from the date of this proposal, after which it is subject to revision/confirmation in writing by us.

Prashant Dhanpawde Sr. Mgr.Mktg.

Page 30: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 30 of 32

CHAPTER – 2 SECTION II GENERAL COMMERCIAL TERMS & CONDITIONS OF SALE

THE ACCEPTANCE OF THIS TENDER / QUOTATION INCLUDES THE ACCEPTANCE OF THE FOLLOWING TERMS AND CONDITIONS EXCEPT AS VARIED BY AGREEMENT/ PURCHASE ORDER ACCEPTED IN WRITING BY BOTH PARTIES. 1. PRICES:

• Are net Ex-works prices inclusive of Packing & Forwarding charges. • Are exclusive of all taxes, Duties, Octroi or any other statuary levies. • Are based on materials to be procured from our standard sources subject to our standard Inspection

& testing procedure. • Are subject to timely finalisation of all technical details, approvals and availability of all clearances to

enable us to proceed with the work uninterruptedly. • Any increase or reduction in the cost of performance of the contract, if so by reason of making,

passing of promulgation of any law or any order, regulation having the force of law, shall be added to or deducted from the contract Price, as the case may be.

• Concessional rate of Sales tax wherever applicable will be charged against valid declaration forms. In the absence of declaration forms, you will have to pay sales tax at prevailing non-concessional rate.

2. DELIVERY We shall deliver the equipment within the period specified in this offer. The commencement and

completion of deliveries, however, are subject to the following: • You will place technically and commercially clear order along with the advance as stipulated in this

offer, so as to enable us to take work in hand and proceed uninterruptedly. • You will make available, at mutually agreed dates, all other technical details / approvals which are

required during the course of execution of the contract. • You will honour the payment commitments as per the binding document during the course of

execution • Force Majeure conditions. • The deliveries specified in this offer will automatically be extended by the period lost due to any of

above accounts. 3. DESPATCH / STORAGE

You shall issue final despatch instructions as per the Order. However, if you fail / delay to issue the despatch instruction within 14 days after notification that goods are ready for despatch, we shall move the goods for storage. In such an event you shall pay Storage charges @ 2 % per month or part thereof of the contract Price.

4. DRAWINGS, ETC.

• All descriptive literature, shipping specifications, drawings and particulars of weight and dimensions submitted with the tender offer are approximate only and the description and illustrations contained in the catalogues, and other advertisement matter are intended merely to present a general idea of the equipment described herein and none of these shall form part of the contract.

• We will submit within a reasonable time after acceptance of order, such drawings (as per our engineering practice) as are necessary to demonstrate fully that all parts of the equipment shall be supplied will conform to the provisions and intent of the contract. All drawings submitted to you for approval shall be approved / returned with comments, to us within 15 days failing which they will be deemed to have been approved.

• We shall have the right to improve / modify the design of equipment for better efficiencies during the tenure of contract without affecting your basic requirements

5. TESTS

Our products are carefully inspected and subjected to all relevant tests in accordance to the relevant standards and will be despatched only after our best satisfaction. You or your representative can attend these tests provided that you notify in writing to us to that effect when the order is placed. In the event of any delay on your part in attending such tests after seven days notice from our side, your absence shall constitute a “Waiver” and the tests will proceed in your absence. All such tests will be deemed to have been approved by you. Any repetition of these inspections or tests shall be charged extra

Page 31: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 31 of 32

to the contract price. The certificates given by us/our sub-Contractors of any such special tests shall be conclusive evidence of such tests.

6. SUSPENSION OF WORK: o If you fail to make any payment when due or perform on time any of your other obligations under the

contract, we shall be entitled to suspend performance of the contract until the failure is remedied. The time for performance of the contract by us shall be extended accordingly and any cost (including financial costs, storage and demurrage or any other charges) thereby incurred by us shall be paid by you.

o If performance of the contract is for any reason suspended by you and such suspension continues for more than 3 months, we shall be entitled at any time during that continued suspension by not less than 30 days' written notice to terminate the contract forthwith, in which event the provisions of the Termination Clause shall apply.

In all cases where delay of failure in performance of this contract is directly or indirectly caused by or due to an act of God, war, mobilisation, demobilisation, requisition by / or interference from Government or Local Authorities, lockout, labour disturbance, trade disputes, fires, riots, strikes and / or civil commotion, malicious damages or any events or circumstances whatsoever beyond our control, then in such case, we shall be entitled to an extension of time for performance of this contract for a period corresponding to the period of delay by or in consequence of the operation (in whole or in part).

7. TERMINATION OF CONTRACT

In case of termination of the contract at any point of time before its completion, you will be required to pay us cancellation charges as follows: • 10% of the order value for termination before 25% of the delivery period. • 25% of the order value for termination above 25 % but before 50% of the delivery period.40% of the

order value for termination above 50% but before 75% of the delivery period. • 60% of the order value for termination above 75% of the delivery period but before start of despatch. • In the event of the any cancellation under the provisions of this clause, you shall have no claim over

the designs, drawings and materials lying ready with us and will remain our property.

8. TITLE OF GOODS • Title of the goods will automatically get transferred to you as soon as the goods leave our works / our

sub-vendor’s works and the documents evidencing the title and the despatch are transferred in your favour. However our obligations will cease only on the commissioning of the equipment.

• The components will get despatched ex-works in convenient despatchable units as manufactured, depending upon the sequence, size, transportation facilities etc., and each such component shall be treated as contracted goods and payment for the goods made pro-rata.

9. INSURANCE Purchaser shall arrange comprehensive insurance covering supply, transit, storage at site cum erection

and commissioning. For purpose of transit insurance, we shall furnish despatch particulars of equipment to enable you to arrange for transit insurance. Further all goods will be despatched on ‘FREIGHT TO PAY” basis to the Station specified by you at your risk. We shall accept no liability for damages or shortages in transit. .

10. FORCE MAJEURE

In all cases where delay of failure in performance of this contract is directly or indirectly caused by or due to an act of God, war, mobilisation, demobilisation, requisition by / or interference from Government or Local Authorities, lockout, labour disturbance, trade disputes, fires, riots, strikes and / or civil commotion, malicious damages or any events or circumstances whatsoever beyond our control, then in such case, we shall be entitled to an extension of time for performance of this contract for a period corresponding to the period of delay by or in consequence of the operation (in whole or in part).

11. PATENTS

In the event of any claim being made or action being brought against you in respect of infringement of patents by us for goods supplied to you hereunder, you shall notify us immediately. We shall be at liberty, with your assistance, if required, but at our own expense, to conduct all negotiations for the settlement of the same or any litigation that may arise therefrom. We shall indemnify you in respect of

Page 32: (Triveni) Rajashri Power 10 MW for ACC By

M/s Rajashri Power & Ispat Ltd. Page 32 of 32

any such claim. This is subject to such notification and provision that no such goods, or any part thereof, shall be used for any purpose other than that for which we supply them.

12. ARBITRATION All disputes, or difference whatsoever arising between us and yourselves, in connection with the contract,

which cannot be settled through mutual negotiations in good faith, either of us may give the other notice in writing of the existence of such question, dispute or difference. The same shall be settled in accordance with the provisions of Indian Arbitration Act. The arbitrator shall be a person qualified to be appointed as an arbitrator, under the provision. The award of the arbitrator shall be final and binding on the parties and the persons claiming under them. Work under the contract shall continue, so far, as may be reasonably practical, during the arbitration proceedings, and no payments which may or shall become due shall be withheld on account of such proceedings. The venue for arbitration shall be Bangalore.

13. LEGAL CONSTRUCTION The contract shall in all respects be construed and be deemed to be governed by the provisions of the Indian Contract Act and Sale of Goods Act as may be in force at the time of execution of the contract. The contract shall be taken to have been made in our office and all proceedings, which either party to the contract might be entitled to make against the other under the contract shall be instituted in a court at Bangalore

14. PERFORMANCE TEST The Performance test will have to be carried out within 30 days of the commissioning. If performance test

is not been able to conduct within 90 days due to reasons not attributable to Triveni Engg & Industries ltd, then it shall be deemed to have been carried out .

15. STORAGE AT SITE / OFFICE AT SITE

Purchaser shall provide LOCKED Storage space at site to store critical equipments. He shall also arrange for make shift office and provide all facility like telephone, fax etc. for the suppliers supervisors.