TRAVEL TIME RELIABILITY: DEFINITIONS, … TIME RELIABILITY: DEFINITIONS, ESTIMATION, AND...
Transcript of TRAVEL TIME RELIABILITY: DEFINITIONS, … TIME RELIABILITY: DEFINITIONS, ESTIMATION, AND...
CUTC Meeting, New Brunswick, NJJune 2, 2015
TRAVEL TIME RELIABILITY: DEFINITIONS, ESTIMATION,
AND APPLICATIONS FOR FDOT
Lily Elefteriadou, University of FloridaDoug McLeod, Florida DOT
Li Jin, Kittelson and Associates, Inc.
Overview Travel Time Reliability (TTR) for FDOT’s
Strategic Intermodal System (SIS)
Definition(s) of TTR, Methodology and Applications
Development in Series of Projects 2006 - 2013
Funded by FDOT as Match to CMS (Tier 1) UTC) and STRIDE (Regional UTC)
Prototype by UF
Implementation by KAI; Validation by UF/FDOT
Now used by Cambridge Systematics
CUTC Summer Meeting, June 2, 2015
What is TTR?● % on-time
arrivals● Variability
CUTC Summer Meeting, June 2, 2015
Scenario 3Congestion, no incidents, no rain, workzone
Scenario n………
An
alys
is P
erio
d/D
ay 1
An
alys
is P
erio
d/D
ay 2
An
alys
is P
erio
d/D
ay 3
An
alys
is P
erio
d/D
ay 4
An
alys
is P
erio
d/D
ay 5
An
alys
is P
erio
d/D
ay 6
An
alys
is P
erio
d/D
ay n
Scenario 1No congestion, no incidents, no workzones, no rain
Scenario 2No congestion, no workzones, no rain, incident
-1 Standard Deviation
Travel Time (hours)
Freq
uen
cy o
f Tr
ave
l Tim
e (n
um
ber
of i
nte
rva
ls)
+1 Standard Deviation
Average Travel Time
Estimated based on expected travel time for various scenarios
Current Uses and Applications FDOT SIS Statewide Reporting of TTR for
non-Instrumented Highways
“What-if” Scenarios for Statewide Implementation
Road Rangers
Work Zone Policies
Managed Lanes
STRIDE-sponsored workshop on Performance Measures for Planning – June 11, 1 pm – Currently 100 registrants - At Capacity!
CUTC Summer Meeting, June 2, 2015
Thank You!
For additional information and event updates please visit
www.transportation.institute.ufl.eduwww.stride.ufl.edu
Contact information:
Lily Elefteriadou, [email protected], ext. 1452
CUTC Summer Meeting, June 2, 2015