Transportation Decision-making Principles of Project Evaluation and Programming Transportation Cost Estimation Kumares C. Sinha and Samuel Labi 1

Transcript of Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S =...

Page 1: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Transportation Decision-makingPrinciples of Project Evaluation and Programming

Transportation Cost Estimation

Kumares C. Sinha and Samuel Labi1

Page 2: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Transportation Costs

Classification of CostsAgency CostsUser Costs/Community CostsCost Functions

HighwayTransitAir

Issues in Cost Estimation

2

Page 3: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Classification

By Incurring PartyAgencyUserNonuser or Community Costs

3

Page 4: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Cost categories

4

Page 5: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Cost Categories – Details of Agency Costs

5

Page 6: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Cost Categories – Details of User Costs

6

Page 7: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Cost Categories – Details of Community Costs

7

Page 8: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Cost Variation with Output Volume

TC (V) = k + f(V)k = Fixed Costf (V) = Variable CostV = Output

Ratio of Variable Cost to Fixed Cost- Is an Indicator of Economy of Scale

8

Page 9: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

By the Expression of Unit Cost

Average Total Cost, ATC =

Average Fixed Cost =

Average Variable Cost =

Marginal Cost Vs. Average Cost

Ratio of Small Increment of Cost to a Small Increment of OutputMC =

VTC

VFC

VVC

VC

δδ

9

Page 10: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

MC and AC can differ significantly$10 million to build a 10-mile highway$10.5 million for 11-mile

AC’s are $1 million and $0.954 millionMC of additional 0.5 mile $0.5 million

• MVC =

• MTC =

VVCδδ

TC FC VC VC MVCV V V V

δ δ δ δδ δ δ δ

= + = =

10

Page 11: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Table E4.1

11

Page 12: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Example: Historical record of operating costs for a metropolitan bus system

Total Average and Marginal Costs

Significance of the interaction between AC and MC

12

Page 13: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Illustration- Variation of Different Cost Types

13

Page 14: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Illustration- Variation of Different Cost Types

14

Page 15: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Illustration- Variation of Different Cost Types

15

Page 16: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Solution: When MC < AC, scale economies

Revenue is maximum at the ridership level when MC = AC (@3.7 million)

16

Page 17: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

TC ($M) = 1.2 + 150V2 , V = monthly output in million of tons

AC =1.2/V + 150 V

MC = 300 V

Optimal Output = 0.09 million tons

17

Page 18: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Illustration

18

Page 19: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Cost classification by By Position in Facility Life Cycle

Initial or Construction Costs

Subsequent Costs e.g. Maintenance, Operation and Preservation Costs

Life Cycle Costs

19

Page 20: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Other Classifications of Costs

In-House vs. Contract

Preventive vs. Corrective

Routine vs. Periodic

20

Page 21: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Transportation Agency CostsFor Facilities

Advance PlanningPreliminary EngineeringFinal DesignR-O-W Acquisition and PreparationConstructionOperationsPreservation and MaintenanceSalvage or Disposal

For Rolling StocksAcquisitionOperationPreservationMaintenanceSalvage or disposal

21

Page 22: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Techniques for Estimating Agency Costs

A. Disaggregate Approach• By Pay Items

• $ per length, area, or volume or weight of finished product, reported separately for materials, labor and supervision, and equipment use.

• At planning stages, level of identifying pay items and their costing is quite coarse.

• Cost models as a function of facility attributes.

22

Page 23: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

B. Aggregate Approach1. An average rate per unit output – for various subcategories.2. A statistical model.

Example: Unit cost per lane-mile-station in $M= 3.9 x L 0.702 x U 1.08 x ST -0.36

L = number of line-milesU = fraction underground

ST = number of stations

23

Page 24: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Risk as an Element of Agency Cost

Is due to Uncertainties in Estimationpossible outcomesprobability of each outcomeconsequences of decisionsexpected valueMonte Carlo samplingdefined probability distribution

24

Page 25: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Due to DisastersNatural or Man-madeVulnerability Cost =

(Pr )obability of Disaster Cost of Damage×∑

25

Page 26: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

User Costs

Travel TimeSafetyVehicle OperatingNoise, Air and Water Pollution

26

Page 27: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Demand and User Cost Interaction

User Benefits DemandSupply Before Improvement

Supply After ImprovementUnitCost

Quantity

Demand is Inelastic27

Page 28: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Figure 4.3

Elastic, Induced Trips 28

Page 29: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Figure 4.4

Elastic Demand - Generated Trips29

Page 30: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Figure 4.5

W

X

Y

K

Z

30

Page 31: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Additional Consumer Surplus May Not be Equal to Change in User Cost

Change in (UC) > Change in (CS)

Change(UC) = (Y + Z) – (X + Y) = Z - X

Change(CS) = (K+X) - W

31

Page 32: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Figure 4.6

32

Page 33: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

33

Table:

Possible Variables for Agency Cost Functions or Rate

Page 34: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Highway Cost ModelsCont. Cost = F (Labor, Materials, Equipment Costs, Contract Characteristics, Environment)

VariablesNumber of CrossingsR-O-WEnvironmental ImpactsSoil and Site ConditionsProject SizeProject ComplexityConstruction Delivery MethodUrban/Rural Location

Historical Cost Database by Pay Items

34

Page 35: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Transit Cost Models

High Speed RailHeavy RailCommuter RailLight RailMonorailBRTUrban Bus Transit

35

Page 36: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Unit Cost of Heavy (Rapid) Rail Construction

UC = 3.906 * LM-0.702 * PU1.076 * ST-0.358

R2 = 0.94Where

UC = Cost Per Line-Mile-Station in $ M(2005)LM = number of Line-MilesPU = Percentage of System UndergroundST = Number of Stations

36

Page 37: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Example 1: Heavy Rail

Given12 Line-Miles4 Stations85% Above Ground

Total Cost = (12)(4)[3.906(12-0.702)(151.076)(4-0.358]= $367.68 M

37

Page 38: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Table 4.5Light Rail Construction Cost per Mile

38

Page 39: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Guideways for Light Rail

Guideway construction accounts for 16-38% of overall capital costs of LRT

Guideway Cost= exp(-1997.92 + 1448.22*Length0.0005 + 553.55Stations0.0005)

R2 = 0.61

39

Page 40: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Example 2: Light RailTwo Alternatives

Alternative 1: 21 Miles, 13 StationsAlternative 2: 38 Miles, 22 Stations

Total Guideway CostAlternative 1:

exp(-1997.92 + 1448.22*210.0005 + 553.55*130.0005)= $868.35 M

Alternative 2:exp(-1997.92 + 1448.22*380.0005 + 553.55*220.0005)= $1544.71 M

Average CostAlternative 1: $868.35 M / (21)(13) = $3.18 M / mile-stationAlternative 2: $1544.71 M / (38)(22) = $1.84 M / mile-station

40

Page 41: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Stations and Yards for LRT

a. Passenger Station Costs per Station

b. Maintenance Yards and Shops per Unit of Capacity

c. Capacity = Max. Number of Vehicles that can be held in Maintenance Yard.

41

Page 42: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Example: Subway LRT

Given: 20 Passenger Stations; 60 Vehicle Capacity

Average Cost of Passenger Station for Subway LRT= $26,982,000

Cost of Stations = 20 x 26,982,000 = $539,640,000

Average Cost of Maintenance Yard = $600,000 per unit capacity

Cost of 60 Capacity Yard = 60 x 600,000 = 36,000,000

Total Capital Cost for Stations and Yards = $575,640,000 42

Page 43: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Rolling Stock Capital Costs for Rail Transit

Avg. Cost/Car ($ Millions)

Heavy Rail 2.3

LRT 2.6

Commuter Rail 2.4

43

Page 44: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Rolling Stock Rehabilitation

Avg. Cost/Car ($ Millions)

Heavy Rail 0.84

Commuter Rail 0.99

44

Page 45: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

BRT Capital Costs

Depend on Location, Type, and Complexity of Construction

Independent at-grade 7.5 million/mileArterial Busways on Median $6.6 Mixed Traffic and/or Curb Bus lanes 1.0

Many Times Higher When Tunnels and Other Features for Exclusive Guideways are involved

See Table 4.11

45

Page 46: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Rail Transit Operating Costs

As a Function of Supply-Based Measures Op. cost per mile, per vehicle, per expected VMT

As a Function of Demand-Based Measures Op. cost per passenger, per passenger-hour or passenger-mile

Personnel cost is 70 – 80%

Heavy Rail has the Lowest Op. Cost per Passenger-mile

See Tables 4.12 and 4.1346

Page 47: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Example:

A LRT with 20 cars @ 330 miles/day

From Table 4.12, Avg. Op. Cost/Revenue Vehicle-Mile = $11.02

Expected Revenue Vehicle-Miles / Year = (330)(365)(20)

Estimated Total Op. Cost / Year = (2,409,000) (11.02) = $26,547,000

47

Page 48: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Bus Transit Capital Costs

Acquisition and Rehabilitation of Buses

Construction and Preservation of Terminals, Stations and Maintenance Facilities

Bus Acquisition Costs – Table 4.14

Bus Rehabilitation Costs – Table 4.15

Facilities - $120-140/sq. ft.

48

Page 49: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Bus Transit Operating Costs

Cost per Vehicle-Mile = 2.625S0.184 PBR0.029

S = Number of Buses in Maximum Service.PBR = Peak Buses/Off-peak Buses

Unit Op. Cost by System Size and PBR – Table 4.16

Average Capital and Operating Costs by City Size –Tables 4.17 – 4.19

49

Page 50: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

How to Update Costs?

Use of Price IndicesFHWA Federal-Aid Highway Price IndexFHWA Highway Maintenance and Operating Cost IndexFTA Cost Adjustment Factors

FHWA State Cost Factors (Table 4.20)

50

Page 51: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Cost Adjustments for Economies of Scale

The Greater the Project Size, the Lower is the Unit Cost (e.g. Cost per Lane-Mile)

Adjustment for Economics of Scale on the Basis of Unit Aggregate Cost of a Project and Unit Aggregate Cost Function for all Projects of Same Type

Unit Cost Function can be Developed from Historical Contract Data

51

Page 52: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Example:

Two Alternative Types, A & B

40-Mile Transit System

CA = -1.05 ln(x) + 5.2

CB = 30/x0.95

where, x = number of line-miles

$207,000 /Ac mile=

$285,000 /Bc mile=

52

Page 53: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Figure E4.11 p. 92

53

Page 54: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

From Cost Function, Unit Cost to be Used Instead of Given Average Cost Values.

System A = $133,000/mile

System B = $90,000/mile

54

Page 55: Transportation Cost Estimation - Purdue Universitysrg/book/files/PDF/4. Estimating Age… · S = Number of Buses in Maximum Service. PBR = Peak Buses/Off-peak Buses Unit Op. Cost

Problem of Cost Overruns5-14% Underestimation at Planning StageDesign RevisionsUnexpected Site ConditionsConstruction ErrorsWeak Estimates of Inflation

Include a Realistic Contingency Amount