TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Transnational Skill Standards
Chargehand Scaffolding–System REFERENCE ID: TOS/CON/Q0307
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Mapping for Scaffolder (CON/Q0307) with UK Qualification NVQ Level 2 Diploma in Accessing Operations and Rigging (DIP087) Link to Indian Qualification Pack: http://www.nsdcindia.org/sites/default/files/files/Chargehand_Scaffolding_System.pdf
Links to UK Qualification: http://www.citb.co.uk
How to Read this Document This document has two sections - Section I and Section II.
Section I: Compares the NOS listing in the Indian QP –Chargehand Scaffolding-System with Scaffolder/NOSinUK Qualification NVQ Level 2.
Section II: Compares the competencies described in each of the Indian NOS with those of UK.
The language of the compared competencies of the two countries differs. However, the competency pointers of the described competency can be mapped. Wherever the competency pointer maps it is reported as ‘None’ underthe column ‘Gap in Indian NOS’. Wherever the competency pointers do not map with the pointers or scope and range, it is identified as a gap and the corresponding UK competency is noted under the column ‘Gap in Indian NOS’.
Usage of Benchmarked Transnational Standards
There will be two types of users of these benchmarked standards. One type will be of those individuals who are already trained and are certified on the corresponding Indian QP. This set of individuals will have to undergo a bridge course comprising of the identified gaps only. Thereafter, they will be assessed under the aegis of a UK Awarding body through the Indian SSC on the competency portions acquired via the bridge course. All qualifying individuals will be awarded a co-branded certificate comprising of logo of Skill India, Indian SSC and UK Awarding Body.
Those individuals who wish to be certified afresh will have to undergo training on both the Indian QP and the gaps in the Indian NOS with regard to UK competencies. Thereafter, they will be assessed under the aegis of a UK Awarding body through the Indian SSC and they will obtain a co-branded certificate comprising of logo of Skill India, Indian SSC and UK Awarding Body.
1
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Section I:NOS Mapping of Chargehand Scaffolding-System QP (CON/Q0307) with the Scaffolder Level 2 NVQ Diploma in Accessing Operations and Rigging (Construction)in UK
NOS Mapping: A Summary
Indian NOS Code
Indian NOS UK NOS Code
UK NOS Remarks, if any
CON/N9001 Work according to personal health, safety and environment protocol at construction site
COSVR252
Utilise Provision of Fall Protection Systems
CON/N9001 Work according to personal health, safety and environment protocol at construction site
COSVR641 Conform to General Workplace Health, Safety and Welfare
CON/N8001 Work effectively in a team to deliver desired results at the workplace
COSVR642 Conform to Productive Work Practices
Two of Indian NOS are covered in one UK NOS
CON/N8001 Plan and organise work to meet expected outcomes
COSVR643 Move, Handle or Store Resources
No mapping Indian NOS
COSVR247 Erect and Dismantle Independent and Birdcage Scaffolds
No mapping Indian NOS
COSVR248 Erect and Dismantle Mobile and Static Scaffold Towers
No mapping Indian NOS
CON/N0358 Erect and dismantle outrigger / cantilever scaffolds
COSVR249 Erect and Dismantle Cantilever Scaffolds
COSVR251 Erect and Dismantle Pavement or Roof Scaffolds
No mapping Indian NOS
CON/N0359 Erect and dismantle scaffolds for complex structure and at complex location
No mapping UK NOS
CON/N9001 Work according to personal health, safety and environment protocol at construction site
COSVR258 Operate plant or machinery used as work platforms
CON/N9001 Work according to personal health, safety and environment protocol at construction site
COSVR360 Slinging and signalling the movement of suspended loads
2
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
NOS Mapping: A Summary
Indian NOS Code
Indian NOS UK NOS Code
UK NOS Remarks, if any
COSVR402 Slinging and Signalling the Movement of Suspended Loads
No mapping Indian NOS
COSVR411 Inspect Scaffolding/Rigging Systems
No mapping Indian NOS
3
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Section II:Compares the competencies in Indian NOS Work according to personal health, safety and environment protocol at construction site (CON/N9001) with the UK NOS Utilise Provision of Fall Protection Systems (COSVR252).
NOS Mapping Descriptions
Indian QP Title Chargehand Scaffolding-System
UK Qualification Scaffolder
Indian QP Code CON/Q0307 UK Qualification Code DIP087
Indian NOS Code Work according to personal health, safety and environment protocol at construction site
UK NOS Code Utilise Provision of Fall Protection Systems
Indian NOS CON/N9001 UK NOS COSVR252
Scope The scope covers the following: Follow safety norms
as defined by organization
Adopt healthy & safe work practices
Implement good housekeeping and environment protection process and activities
Overview This standard is about
1 interpreting information
2 adopting safe and healthy working practices
3 selecting materials, components and equipment
4 preparing and utilising provision of fall protection systems
4
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR252 ‘Utilise Provision of Fall Protection Systems’ UK NOS.
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
To be competent, the user/individual on the job must be able to-
You must be able to-
P1: interpret the given information relating to the work and resources to confirm its relevance
PC3. follow recommended safe practices in handling construction materials, including chemical and hazardous material whenever applicable
P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe work practices
None
PC5. identify near miss , unsafe condition and unsafe act
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: 1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection, 6) Hand and Body Protection 7) Respiratory Protection (if required)
PC7. handle all required tools, tackles , materials & equipment safely
PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines
PC9. install and apply properly all safety equipment as instructed
5
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
PC10. follow safety protocol and practices as laid down by site EHS department
PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes.
PC12. apply ergonomic principles wherever required
PC7. handle all required tools, tackles , materials & equipment safely
P3: select the required quantity and quality of resources for the methods of work
None
PC9. install and apply properly all safety equipment as instructed
PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines
P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area
None
PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes.
SB1. not create unsafe conditions for others PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: 1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection,
P5: comply with the given contract information to carry out the work efficiently to the required specification
9 employ and utilise fall protection systems and/or equipment to given working instructions, using recognised anchor points, for at least two of the following: 9.2 secured steelwork structures 9.3 wire and rope systems
6
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
6) Hand and Body Protection 7) Respiratory Protection (if required)
9.4 permanently installed anchorage points 9.6 track systems
PC7. handle all required tools, tackles , materials & equipment safely
PC9. install and apply properly all safety equipment as instructed
PC10. follow safety protocol and practices as laid down by site EHS department
CON/N8002 Plan and organise work to meet expected outcomes
P6: complete the work within the allocated time, in accordance with the programme of work
None
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented
KB1. the procedure for responding to accidents and other emergencies at site
K2 the types of information, their source and how they are interpreted
None
SA3. fill safety formats for near miss, unsafe conditions and safety suggestions
SA4. read in one or more language, preferably in the local language of the site
7
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
KB1. the procedure for responding to accidents and other emergencies at site
K3 the organisational procedures to solve problems with the information and why it is important they are followed
None
K4 the level of understanding operatives must have of information for relevant current legislation and official guidance and how it is applied
KA1. reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per guidelines
K5 how emergencies should be responded to and who should respond
None
KB1. the procedure for responding to accidents and other emergencies at site
KB8. safety relevant to tools, tackles, & requirement as per applicability
K6 the organisational security procedures for tools, equipment and personal belongings
None
KA1. reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per guidelines
K7 what the accident reporting procedures are and who is responsible for making the report
None
KB2. appropriate personal protective equipment to used based on various working conditions
K8 why, when and how health and safety control equipment should be used
None
KA2. types of safety hazards at construction sites
K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified
None
KB4. health and environments effect of construction materials as per applicability
8
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
KB5. various environmental protection methods as per applicability
KB8. safety relevant to tools, tackles, & requirement as per applicability
K10 how the resources should be used and how any problems associated with the resources are reported
K11 the organisational procedures to select resources, why they have been developed and how they are used
K12 the hazards associated with
the resources and methods of work and how they are overcome
K13 how to protect work from
damage and the purpose of protection
KB6. storage of waste including the following at appropriate location:
non-combustible scrap material and debris
combustible scrap material and debris
general construction waste and trash (non-toxic, non-hazardous)
any other hazardous wastes
any other flammable wastes
K14 why disposal of waste should be carried out safely and how it is achieved
None
KB1. the procedure for responding to accidents and
K15 how methods of work, to None
9
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
other emergencies at site meet the specification, are carried out and problems reported
KB2. appropriate personal protective equipment to used based on various working conditions
KB7. how to use hazardous material, in a safe and appropriate manner as per applicability
K16 how maintenance of tools and equipment is carried out
CON/N8002 Plan and organise work to meet expected outcomes
K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept
None
General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs
Section II: Compares the competencies in Indian NOS Work according to personal health, safety and environment protocol at construction site (CON/N9001) with the UK NOS Conform to General Workplace Health, Safety and Welfare (COSVR641).
NOS Mapping Descriptions
Indian QP Title Chargehand Scaffolding-System
UK Qualification Scaffolder
Indian QP Code CON/Q0307 UK Qualification Code DIP087
Indian NOS Code Work according to personal health, safety and environment protocol at construction site
UK NOS Code Conform to General Workplace Health, Safety and Welfare
Indian NOS CON/N9001 UK NOS COSVR641
Scope
The scope covers the following:
Overview
This standard, in the context of your occupation and work
10
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Scope Follow safety norms
as defined by organization
Adopt healthy & safe work practices
Implement good housekeeping and environment protection process and activities
Overview environment, is about awareness of relevant current statutory requirements and official guidance; responsibilities, to self and others, relating to workplace health, safety and welfare; personal behaviour and security in the workplace
Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR641 ‘Conform to General Workplace Health, Safety and Welfare’ UK NOS.
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
To be competent, the user/individual on the job must be able to-
You must be able to- None
PC2. follow emergency and evacuation procedures in case of accidents, fires, natural calamities
P1: comply with all workplace health, safety and welfare legislation requirements at all times
None
PC3. follow recommended safe practices in handling construction materials, including chemical and hazardous material whenever applicable
PC4. participate in safety awareness programs like Tool Box Talks, safety demonstrations, mock drills, conducted at site
11
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: 1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection, 6) Hand and Body Protection 7) Respiratory Protection (if required)
PC1. identify and report any hazards, risks or breaches in site safety to the appropriate authority
P2. recognise hazards, associated with the workplace, that have not been previously controlled, and report them in accordance with organisational procedures
None
PC4. participate in safety awareness programs like Tool Box Talks, safety demonstrations, mock drills, conducted at site
P3.accept responsibility for, and comply with, organisational policies and procedures in order to contribute to health, safety and welfare
None
PC5. identify near miss , unsafe condition and unsafe act
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: 1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection, 6) Hand and Body Protection 7) Respiratory Protection (if required)
PC7. handle all required tools, tackles , materials & equipment
12
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
safely
PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines
PC9. install and apply properly all safety equipment as instructed
PC10. follow safety protocol and practices as laid down by site EHS department
PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes
P4.comply with and support all organisational security arrangements and approved procedures
Knowledge & Understanding Indian NOS
Knowledge & Understanding UK NOS
KB4.health and environments effect of construction materials as per applicability
K1 what and why health, safety and welfare legislation is relevant to the occupational area
None
KB5.various environmental protection methods as per applicability
SA5. read sign boards, notice boards relevant to safety
K2 what health, safety and welfare legislation notices and warning signs are relevant to the occupational area and associated equipment
13
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
KA2.types of safety hazards at construction sites
K3 how to comply with control measures identified by risk assessments and safe systems of work
None
SB6. assess and analyze areas which may affect health, safety and environment protocol on the sites, etc.
KB2.appropriate personal protective equipment to used based on various working conditions
K4 why, when and how health and safety control equipment should be used
None
KA2. types of safety hazards at construction sites
K5 the hazards associated with the work environment
None
KB4. health and environments effect of construction materials as per
KB5. various environmental protection methods as per applicability
SB3. identify safety risks that affect the health, safety and environment for self and others working in the vicinity, tackle it if within limit or report to appropriate authority
K6 how changing circumstances can create hazards
None
KA2.reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per guidelines
K7 the method of reporting hazards in the workplace
None
KA1.reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per
K8 what the organisational policies and procedures are for health, safety and welfare
None
14
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
guidelines
SB3. identify safety risks that affect the health, safety and environment for self and others working in the vicinity, tackle it if within limit or report to appropriate authority
K9 how to take active responsibility for health, safety and welfare
None
SB5. identify safety risks that affect the health, safety and environment for self and others working in the vicinity, tackle it if within limit or report to appropriate authority
K10 how individual actions and behaviour may affect others
None
SB5.ensure personal safety behaviour K11 what the types of fire
extinguishers are and how and when they are used
K12 how security arrangements are implemented in the workplace
General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs
15
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Section II continued:Compares the competencies in Indian NOS Work effectively in a tem to deliver desired results at workplace(CON/N8001) with the UK NOS Conform to Productive Work Practices(COSVR642).
NOS Mapping Descriptions
Indian QP Title Chargehand Scaffolding-System
UK Qualification Scaffolder
Indian QP Code CON/Q0307 UK Qualification Code DIP087
Indian NOS Code Work effectively in a tem to deliver desired results at workplace
UK NOS Code Conform to Productive Work Practices
Indian NOS CON/N8001 UK NOS COSVR642
Scope The scope covers the following: Interact and
communicate effectively with co-workers, superiors and sub-ordinates across different teams
Support co-
workers, superiors and sub-ordinates within the team and across interfacing teams to ensure effective execution of assigned task
Overview This standard, in the context of your occupation and work environment, is about 5. productive
communication with line management, colleagues and customers
6. interpreting information
7. planning and carrying out productive work practices
8. working with others or as an individual
16
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR642 ‘Conform to Productive Work Practices’ UK NOS.
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
To be competent, the user/individual on the job must be able to-
You must be able to-
PC1. pass on work related information/ requirement clearly to the team members
P1 communicate with others None
PC2. inform co-workers and superiors about any kind of deviations from work
PC5. communicate to team members/subordinates for appropriate work technique and method
P2 follow organisational procedures to plan the sequence of work in order to conform to productive work practices and maintain records
follow organisational procedures to plan the sequence of work in order to conform to productive work practices and maintain records
SB5. ensure best ways of coordination among team members
P3 maintain good work relationships
None
SB6. communicate with co-workers considering their educational / social background
17
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
Gaps in Indian NOS
KA4. different modes of communication, and its appropriate usage
K1 how to use methods of communication with other workplace personnel and customers
None
KA3. risks of a failure in teamwork in terms of effects on project outcomes, timelines, safety at the construction site, etc.
K2 how to communicate to ensure work is productive
None
KB3. importance of proper and effective communication and the expected adverse effects in case of failure relating to quality, timelines, safety, risks at the construction project site
K3 how organisational procedures are applied to plan and carry out productive work
K4 how to maintain documentation in accordance with organisational procedures
K5 how to contribute to zero/low carbon outcomes in the built environment
KA2. importance of effective communication and establishing strong working relationships with co-workers
K6 how to maintain good work relationships
None
K7 how to apply the principles of equality and diversity
General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs
18
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Section II continued:Compares the competencies in Indian Plan and organise work to meet expected outcomes(CON/N8002) with the UK NOS Conform to Productive Work Practices(COSVR642).
NOS Mapping Descriptions
Indian QP Title Chargehand Scaffolding-System
UK Qualification Scaffolder
Indian QP Code CON/Q0307 UK Qualification Code DIP087
Indian NOS Code Plan and organise work to meet expected outcomes
UK NOS Code Conform to Productive Work Practices
Indian NOS CON/N8002 UK NOS COSVR642
Scope The scope covers the following: Prioritize work
activities to achieve desired results
Organize desired
resources prior to commencement of work
Overview This standard, in the context of your occupation and work environment, is about 5. productive
communication with line management, colleagues and customers
6. interpreting information
7. planning and carrying out productive work practices
8. working with others or as an individual
19
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR642 ‘Conform to Productive Work Practices’ UK NOS.
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
To be competent, the user/individual on the job must be able to-
You must be able to-
PC3. provide guidance to the subordinates to obtain desired outcome
P1 communicate with others 2 respect the needs of others when communicating
PC1. understand clearly the targets and timelines set by superiors
P2 follow organisational procedures to plan the sequence of work in order to conform to productive work practices and maintain records
follow organisational procedures to plan the sequence of work in order to conform to productive work practices and maintain records
4 complete documentation as required by the organisation
PC2. plan activities as per schedule and sequence
PC7. complete the work with allocated resources
PC8. engage allocated manpower in an appropriate manner
PC9. use resources in an optimum manner to avoid any unnecessary wastage
PC12. processes adopted to be in line with the specified standards and instructions
PC6. select and employ correct tools, tackles and equipment for completion of desired work
P3 maintain good work relationships
None
PC7. complete the work with allocated resources
PC9. use resources in an optimum manner to avoid any unnecessary wastage
PC11. organize work output, materials used, tools and tackles
20
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
deployed
PC12. processes adopted to be in line with the specified standards and instructions
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
K1 how to use methods of communication with other workplace personnel and customers
K1 how to use methods of communication with other workplace personnel and customers
K2 how to communicate to ensure work is productive
K2 how to communicate to ensure work is productive
KB1. standard practices of work to be adopted for assigned task
K3 how organisational procedures are applied to plan and carry out productive work
K3 how organisational procedures are applied to plan and carry out productive work
KB2. how to use available resources in a judicious and appropriate manner to minimize wastages or damage
K4 how to maintain documentation in accordance with organisational procedures
K5 how to contribute to zero/low carbon outcomes in the built environment
K6 how to maintain good work relationships
K7 how to apply the principles of equality and diversity
General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs
21
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Section II continued:Compares the competencies in Indian NOS Erect and dismantle outrigger / cantilever scaffolds (CON/N0358) with the UK NOS Erect and Dismantle Cantilever Scaffolds (COSVR249).
NOS Mapping Descriptions
Indian QP Title Chargehand Scaffolding-System
UK Qualification Scaffolder
Indian QP Code CON/Q0307 UK Qualification Code DIP087
Indian NOS Code Erect and dismantle outrigger / cantilever scaffolds
UK NOS Code Erect and Dismantle Cantilever Scaffolds
Indian NOS CON/N0358 UK NOS COSVR249
Scope The scope covers the following: Erect outrigger/
cantilever scaffold in a safe manner
Dismantle outrigger/ cantilever scaffolds in a safe manner
Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing, erecting, dismantling cantilever scaffolds
22
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR249 ‘Erect and Dismantle Cantilever Scaffolds’ UK NOS.
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
To be competent, the user/individual on the job must be able to-
You must be able to-
PC3. read and understand schematic working drawing
P1: interpret the given information relating to the work and resources to confirm its relevance
interpretation of risk assessments related to the work to be carried out
PC4. calculate the number of components required from the drawing
PC5. understand the fixing and support process for scaffold
PC2. check and ensure that fall protection is in place to ensure safety including guard rails, safety nets, wire mesh, toe boards, etc.
P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe work practices
2 avoidance of risk by following the given information relating to the following 2.3 safe use of access equipment PC8. check rigidity and stability
of scaffold
PC9. ensure outrigger beams do not extend beyond prescribed length from face of structure
PC10. ensure beam is securely braced to avoid tipping and movement
PC12. ensure that in-board ends of beams are securely anchored or braced
PC13. ensure that entire supporting structure is securely braced to prevent any horizontal movement
23
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
PC21. ensure that all the fixtures and small components are staked properly for further use
PC22. clean and store scaffold components for further use
PC6. use right components and follow erection procedure as per work method statement with respect to the types of scaffolds
P3: select the required quantity and quality of resources for the methods of work
3 Selection of resources associated with own work
3.3 access equipment PC19. ensure scaffolds are
dismantled using proper tools & tackles
PC1. check and ensure that area around scaffold on ground has been barricaded to ensure safety
P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area
None
PC2. check and ensure that fall protection is in place to ensure safety including guard rails, safety nets, wire mesh, toe boards, etc.
PC22. clean and store scaffold components for further use
CON/N9001 Work according to personal health, safety and environment protocol at construction site
PC6. use right components and follow erection procedure as per work method statement with respect to the types of scaffolds
P5: comply with the given contract information to carry out the work efficiently to the required specification
erect and dismantle at least one of the following cantilever scaffolds to given working instructions using either tube and fitting or system scaffold:
Cantilever fan
Cantilever drop
PC7. check verticality of scaffold at first level of erection and correct (if required) before moving to the next level
24
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
PC8. check rigidity and stability of scaffold
PC9. ensure outrigger beams do not extend beyond prescribed length from face of structure
PC10. ensure beam is securely braced to avoid tipping and movement
PC11. ensure that in-board and out-board ends of the outrigger beams are of required length
PC12. ensure that in-board ends of beams are securely anchored or braced
PC13. ensure that entire supporting structure is securely braced to prevent any horizontal movement
PC14. ensure that base of scaffold is erected as per requirements and in a safe manner
PC15. complete work within the allocated time with quality and safety
PC16. report to superior for completion of work & for checking of scaffolding, do any rework as suggested by engineer in charge or superior, and get it approved
25
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
PC17. ensure standard procedures are followed for dismantling of outrigger /cantilever scaffolds
PC18. check for rigidity and stability of scaffold before dismantling and maintain during dismantling
PC19. ensure scaffolds are dismantled using proper tools & tackles
PC20. lower scaffold material in a safe manner, manually or by using mechanical devices
PC15. complete work within the allocated time with quality and safety
P6: complete the work within the allocated time, in accordance with the programme of work
None
26
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented
KB1. how to read and interpret scaffolding drawing , other relevant working drawings and working method statement
K2 the types of information, their source and how they are interpreted
None
SA3. read in one or more language, preferably in the local language of the site & basic English
SA4. read sketches, drawing or instructions provided for the scaffolding work
SA5. read various, sign boards, safety rules and safety tags , instructions related to exit routes during emergency at the workplace
SB6. rectify any problem related to erection of outrigger/cantilever scaffold
K3 the organisational procedures to solve problems with the information and why it is important they are followed
None
SB7. resolve concerns raised by the scaffolding gang
SB8. resolve any conflict within the team
SB12. evaluate the complexity of the task and seek assistance and support wherever required
KA2. safety rules and regulations for handling and storing relevant tools and equipment
K4 the level of understanding operatives must have of information for relevant,
None
27
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
and materials for reinforcement works
current legislation and official guidance and how it is applied
KA5. service request procedures for tools, materials and equipments
KA6. statutory compliance requirements related to working at height
CON/N9001 Work according to personal health, safety and environment protocol at construction site
K5 how emergencies should be responded to and who should respond
None
KA5. service request procedures for tools, materials and equipments
K6 the organisational security procedures for tools, equipment and personal belongings
None
CON/N9001 Work according to personal health, safety and environment protocol at construction site
K7 what the accident reporting procedures are and who is responsible for making the report
None
KA3. personal protection including the use of the related safety gears and equipment
K8 why, when and how personal protective equipment (PPE) should be used
None
CON/N9001 Work according to personal health, safety and environment protocol at construction site
KB6. different types of scaffolds system such as pipe &couplers and other common customized system scaffold (frame scaffold ) and method of erection
K9 the characteristics, quality, uses, limitations and defects associated with the resources and how defects should be rectified
None
KB7. scaffolds components, their size and fixing accessories
KB10. selection and use of various lifting devices
28
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
KB12. how to identify and replace any damaged components
KB10. selection and use of various lifting devices
K10 how the resources should be used and how any problems associated with the resources are reported
None
SB4. plan work & organize required resource in coordination with team members and superior
SB2. decide on manpower, tools , material and equipment for relevant work
SB10. optimize resources
K11 the organisational procedures to select resources, why they have been developed and how they are used
None
CON/N9001 Work according to personal health, safety and environment protocol at construction site
K12 the hazards associated with the resources and methods of work and how they are overcome
None
K13 how to protect work from damage and the purpose of protection
CON/N9001 Work according to personal health, safety and environment protocol at construction site
K14 why disposal of waste should be carried out safely and how it is achieved
None
KB1. how to read and interpret scaffolding drawing , other relevant working drawings and working method statement
K15 how methods of work, to meet the specification, are carried out and problems reported
None
KB8. how to follow a methodical scaffolding plan as per the site requirements
29
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
KB11. how to check and sort out all the related scaffolding components
KB12. how to identify and replace any damaged components
KB13. how to check and ensure alignment of scaffold
KB15. appropriate method for securely bracing outrigger beam
KB18. how to brace, secure and provide support to cantilever/outrigger scaffold
KB19. importance of getting scaffold checked by inspector
CON/N9001 Work according to personal health, safety and environment protocol at construction site
K16 how maintenance of tools and equipment is carried out
None
General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs
30
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Section II continued:Compares the competencies in Indian NOS Work according to personal health, safety and environment protocol at construction site (CON/N9001) with the UK NOS Equip Scaffolds with Safeguards and Environmental Protection(COSVR258).
NOS Mapping Descriptions
Indian QP Title Chargehand Scaffolding-System
UK Qualification Scaffolder
Indian QP Code CON/Q0358 UK Qualification Code DIP087
Indian NOS Code Work according to personal health, safety and environment protocol at construction site
UK NOS Code Equip Scaffolds with Safeguards and Environmental Protection
Indian NOS CON/N9001 UK NOS COSVR258
Scope The scope covers the following: Follow safety
norms as defined by organization
Adopt healthy & safe work practices
Implement good housekeeping and environment protection process and activities
Overview This standard is about
This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing for and equipping scaffolding with operational safeguards and environmental protection
31
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR258 ‘Equip Scaffolds with Safeguards and Environmental Protection’ UK NOS.
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
To be competent, the user/individual on the job must be able to-
You must be able to-
CON/N0351 Erect and dismantle common customized system scaffolds
P1: interpret the given information relating to the work and resources to confirm its relevance
None
PC3. follow recommended safe practices in handling construction materials, including chemical and hazardous material whenever applicable
P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe work practices
2 avoidance of risk by following the given information relating to the following 2.3 safe use of access equipment
PC5. identify near miss , unsafe condition and unsafe act
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including:
1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection, 6) Hand and Body Protection 7) Respiratory Protection (if required) PC7. handle all required tools, tackles , materials & equipment safely
PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines
PC9. install and apply properly all safety equipment as instructed
32
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
PC10. follow safety protocol and practices as laid down by site EHS department
PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes.
PC12. apply ergonomic principles wherever required
PC7. handle all required tools, tackles , materials & equipment safely
P3: select the required quantity and quality of resources for the methods of work :
None
PC9. install and apply properly all safety equipment as instructed
PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines
P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area
None
PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes.
SB1. not create unsafe conditions for others
33
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: 1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection, 6) Hand and Body Protection 7) Respiratory Protection (if required)
P5: comply with the given contract information to carry out the work efficiently to the required specification
9 install and remove scaffolding guards, barriers and screens to given working instructions relating to
9.1 public protection
9.2 worker protection
PC7. handle all required tools, tackles , materials & equipment safely
CON/N8002 Plan and organise work to meet expected outcomes
P6: complete the work within the allocated time, in accordance with the programme of work
None
34
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented
KB1. how to read and interpret scaffolding drawing , other relevant working drawings and working method statement
K2 the types of information, their source and how they are interpreted
None
SA3. read in one or more language, preferably in the local language of the site & basic English
SA4. read sketches, drawing or instructions provided for the scaffolding work
K3 the organisational procedures to solve problems with the information and why it is important they are followed
K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied
KA1. reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per guidelines
K5 how emergencies should be responded to and who should respond
None
KB1. the procedure for responding to accidents and other emergencies at site
K6 the organisational security procedures for tools, equipment
None
35
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
and personal belongings
KA1. reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per guidelines
K7 what the accident reporting procedures are and who is responsible for making the report
None
KB1. the procedure for responding to accidents and other emergencies at site
KB2. appropriate personal protective equipment to used based on various working conditions
K8 why, when and how personal protective equipment (PPE) should be used
None
KA2. types of safety hazards at construction sites
K9 the characteristics, quality, uses, limitations and defects associated with the resources and how defects should be rectified
None
KB4. health and environments effect of construction materials as per
KB5. various environmental protection methods as per applicability
KB8. safety relevant to tools, tackles, & requirement as per applicability
KB5. various environmental protection methods as per applicability
K10 how the resources should be used and how any problems associated with the resources are reported
None
KB8. safety relevant to tools, tackles, & requirement as per applicability
K11 the organisational procedures to select resources, why they have been developed and how they are used
K12 the hazards associated with the resources and methods of work and how they are overcome
36
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
K13 how to protect work from damage and the purpose of protection
KB6. storage of waste including the following at appropriate location:
non-combustible scrap material and debris
combustible scrap material and debris
general construction waste and trash (non-toxic, non-hazardous)
any other hazardous wastes
any other flammable wastes
K14 why disposal of waste should be carried out safely and how it is achieved
None
KB1. the procedure for responding to accidents and other emergencies at site
K15 how methods of work, to meet the specification, are carried out and problems reported
None
KB2. appropriate personal protective equipment to used based on various working conditions
KB7. how to use hazardous material, in a safe and appropriate manner as per applicability
KB2. appropriate personal protective equipment to used based on various working conditions
K16 how maintenance of tools and equipment is carried out
None
SB3. identify safety risks that affect the health, safety and environment for self and others working in the vicinity, tackle it if within limit or report to appropriate authority
K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept
37
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs
Section II continued:Compares the competencies in Indian NOS Work according to personal health, safety and environment protocol at construction site (CON/N9001) with the UK NOS Establish Work Area Protection and Safety (COSVR360).
NOS Mapping Descriptions
Indian QP Title
Chargehand Scaffolding-System
UK Qualification
Scaffolder
Indian QP Code
CON/Q0307 UK Qualification Code
DIP087
Indian NOS Code
Work according to personal health, safety and environment protocol at construction site
UK NOS Code
Establish Work Area Protection and Safety
Indian NOS CON/N9001 UK NOS COSVR360
Scope The scope covers the following: Follow safety norms as
defined by organization Adopt healthy & safe
work practices Implement good
housekeeping and environment protection process and activities
Overview This standard is about
1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 determining the protection and safety requirements 5 preparing, providing for and maintaining the protection and safety of the occupational area of work
38
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR360 ‘Establish Work Area Protection and Safety’ UK NOS.
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
To be competent, the user/individual on the job must be able to-
You must be able to-
CON/N0358: Erect and dismantle outrigger / cantilever scaffolds
P1: interpret the given information relating to the work and resources to confirm its relevance
None
SA3. read in one or more language, preferably the local language at the site
PC1. identify and report any hazards, risks or breaches in site safety to the appropriate authority
P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe work practices
2 avoidance of risk by following the given information relating to the following 2.3 safe use of access equipment PC3. follow recommended safe
practices in handling construction materials, including chemical and hazardous material whenever applicable
PC5. identify near miss , unsafe condition and unsafe act
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including:
1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection, 6) Hand and Body Protection 7) Respiratory Protection (if required) PC7. handle all required tools, tackles , materials & equipment
39
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
safely
PC9. install and apply properly all safety equipment as instructed
PC10. follow safety protocol and practices as laid down by site EHS department
PC7. handle all required tools, tackles , materials & equipment safely
P3: select the required quantity and quality of resources for the methods of work :
None
PC9. install and apply properly all safety equipment as instructed
PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines
P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area
None
PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes.
SB1. not create unsafe conditions for others
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: 1) Head Protection (Helmets) 2) Ear protection 3) Fall Protection 4) Foot Protection 5) Face and Eye Protection, 6) Hand and Body Protection 7) Respiratory Protection (if
P5: comply with the given contract information to carry out the work efficiently to the required specification
install, maintain and remove temporary protection and safety arrangements for the work area to given working instructions, relating to barriers/temporary structures and at least one of the following
9.1 protection and safety notices
40
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Performance Criteria - Indian NOS
Performance Criteria - UK NOS Gaps in Indian NOS
required) 9.2 safety lighting
PC7. handle all required tools, tackles , materials & equipment safely
PC9. install and apply properly all safety equipment as instructed
CON/N8002 Plan and organise work to meet expected outcomes
P6: complete the work within the allocated time, in accordance with the programme of work
None
41
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented
KB1. how to read and interpret scaffolding drawing , other relevant working drawings and working method statement
K2 the types of information, their source and how they are interpreted
None
SA3. read in one or more language, preferably in the local language of the site & basic English
SA4. read sketches, drawing or instructions provided for the scaffolding work
K3 the organisational procedures to solve problems with the information and why it is important they are followed
None
K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied
None
KA1. reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per guidelines
K5 how emergencies should be responded to and who should respond
None
KB1. the procedure for responding to accidents and other emergencies at site
K6 the organisational security procedures for tools, equipment
None
42
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
and personal belongings
KA1. reporting procedures in cases of breaches or hazards for site safety, accidents, and emergency situations as per guidelines
K7 what the accident reporting procedures are and who is responsible for making the report
None
KB1. the procedure for responding to accidents and other emergencies at site
KB2. appropriate personal protective equipment to used based on various working conditions
K8 why, when and how personal protective equipment (PPE) should be used
None
KA2. types of safety hazards at construction sites
K9 the characteristics, quality, uses, limitations and defects associated with the resources and how defects should be rectified
None
KB4. health and environments effect of construction materials as per
KB5. various environmental protection methods as per applicability
KB8. safety relevant to tools, tackles, & requirement as per applicability
KB5. various environmental protection methods as per applicability
K10 how the resources should be used and how any problems associated with the resources are reported
None
KB8. safety relevant to tools, tackles, & requirement as per applicability
K11 the organisational procedures to select resources, why they have been developed and how they are used
43
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
K12 the hazards associated with the resources and methods of work and how they are overcome
SA3. fill safety formats for near miss, unsafe conditions and safety suggestions
K13 how to protect work from damage and the purpose of protection
KB6. storage of waste including the following at appropriate location:
non-combustible scrap material and debris
combustible scrap material and debris
general construction waste and trash (non-toxic, non-hazardous)
any other hazardous wastes
any other flammable wastes
K14 why disposal of waste should be carried out safely and how it is achieved
None
KB1. the procedure for responding to accidents and other emergencies at site
K15 how methods of work, to meet the specification, are carried out and problems reported
None
KB2. appropriate personal protective equipment to used based on various working conditions
KB7. how to use hazardous material, in a safe and appropriate manner as per applicability
KB2. appropriate personal protective equipment to used based on various working conditions
K16 how maintenance of tools and equipment is carried out
None
44
TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY
Knowledge & Understanding: Indian NOS
Knowledge & Understanding: UK NOS
SB3. identify safety risks that affect the health, safety and environment for self and others working in the vicinity, tackle it if within limit or report to appropriate authority
K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept
General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs