Transmission Management
An International Review
Colin Ray
1st November 2011
![Page 2: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/2.jpg)
Contents
• Transmission Capacity
• Asset Performance
• Smarter Grids
• Regulation
![Page 3: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/3.jpg)
Asset Management Activity
ASSET PERFORMANCE
TRANSMISSION CAPACITY
SMARTERGRID
OUTPUT measures
Energy not supplied Failure rate
Restoration time
REGULATION
![Page 4: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/4.jpg)
Power System
Transmission System
![Page 5: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/5.jpg)
Transmission Capacity
Adequacy • Enough transmission and distribution assets
• Steady state
Security • Ability of the system to cope with sudden
disturbances (e.g. line faults, asset failure, load disconnection, disconnection of power plants, RES)
![Page 6: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/6.jpg)
Security Criteria – International Review
• Main Interconnected Transmission Network
- Deterministic N-1 or N-2 criterion commonly used
- No load loss, technical compliance
- Cost/benefit to identify economic investment
- Periodic check that provides correct economic solution
• Other parts of Transmission Network - Probabilistic criterion commonly used
- Cost of unsupplied energy
- Recovery time
- Losses
- Ancillary service costs
- Congestion
- CAPEX
- Economic cost/benefit analysis
• Low probability but high impact events
• Peak and maintenance conditions
![Page 7: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/7.jpg)
Security Criteria – International Review
• Generation Connection - Frequency control policy (output measure)
- Frequency response generation
- Low frequency/voltage load disconnection
• Demand Connection - Customer service level (output measure)
- Restoration time
- Failure rate
- Energy not supplied
![Page 8: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/8.jpg)
Security Criteria – International Review
Network Contingencies
• Any asset in main transmission network
• Any generation connection asset
• Any demand connection asset
• Asset reliability – international benchmark (ITOMS)
![Page 9: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/9.jpg)
Security Criteria – Combined Deterministic-Probabilistic
Approach
• Satisfies deterministic criteria but quantifies risk • Network required to meet a - deterministic criterion and - probabilistic risk criterion • Risk assessment process commonly used in industry • Provide an output measure for main interconnected
transmission network
Reference: A Joint Deterministic-Probabilistic Approach to Bulk System Reliability Assessment. Roy Billinton et al
![Page 10: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/10.jpg)
Transmission Capacity - Risk Assessment
Source: CIGRE WG C1.17 Planning to Manage Power Interruption Events
![Page 11: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/11.jpg)
System States
Source: CIGRE Report WG C1.17 Planning to Manage Power Interruption Events
![Page 12: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/12.jpg)
Risk Management Cycle
Network performance
Investment and Maintenance plan
Risk register
Network
Decision making process
Analysis process Execution process
Source: CIGRE WG C1.16 Transmission Asset Risk Management
![Page 13: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/13.jpg)
Asset Management
Source: CIGRE WG C1.16 Transmission Asset Risk Management
![Page 14: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/14.jpg)
Asset Condition Monitoring
![Page 15: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/15.jpg)
Acceptable Risk
Risk Assessment Matrix
Source: CIGRE WG C1.16 Transmission Asset Risk Management
![Page 16: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/16.jpg)
Asset Management
• Decisions at the strategic, tactical, operational level
• Can be quantified – risk assessment
• Linked to company key performance indicators
• Risk management standard ISO 31000 • Asset management standard PAS 55
![Page 17: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/17.jpg)
17
PAS 55:2008
• “Specification for the optimized management of physical infrastructure assets”
• For the purposes of PAS 55:2008, asset management is defined as:
systematic and coordinated activities and practices through which an organization optimally and sustainably manages its assets and asset systems, their associated performance, risks and expenditures over their life cycles for the purpose of achieving its organizational strategic plan
![Page 18: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/18.jpg)
18
Review Panel for PAS 55:2008 49 organisations from 15 industries in 10 countries
Organisations sponsoring PAS 55 Review
Industry Sectors
Power generation
Electricity/gas
distribution
Engineering/
consultancy
Mining
Transport
Water
Manufacturing
Organisations sponsoring PAS 55 Review
Geographical footprint
Benelux
Multinational
North America
Far East
Australia
Scandinavia
UK
*
* Included construction & maintenance service providers to multi-industries
![Page 19: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/19.jpg)
19
4.3 Asset management strategy, objectives & plans 4.3.1 Asset management strategy 4.3.2 Asset management objectives 4.3.3 Asset management plans 4.3.4 Contingency planning
4.4 Asset management enablers & controls 4.4.1 Structure, authority & responsibilities 4.4.2 Outsourcing of asset management activities 4.4.3 Training, awareness & competence 4.4.4 Consultation, participation & communication 4.4.5 Asset management system documentation 4.4.6 Information management 4.4.7 Risk management 4.4.8 Legal & other requirements 4.4.9 Management of change
4.6 Performance assessment & improvement 4.6.1 Performance & condition monitoring 4.6.2 Investigation of asset-related failures, incidents & nonconformities 4.6.3 Evaluation of compliance 4.6.4 Audit 4.6.5 Improvement actions 4.6.6 Records
4.7 Management review
4.1 General requirements
4.2 Asset management policy
4.5 Implementation of asset management plans 4.5.1 Life cycle activities 4.5.2 Tools, facilities & equipment
Plan
Do
Check
Act
PAS 55:2008 Management
System Structure
Structure of PAS 55:2008
![Page 20: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/20.jpg)
20
Development of international standard for asset management
• September 2010 – ISO TMB confirms recommendation to form ISO/PC251 and develop
proposed standard for asset management
• PAS 55:2008 to used as ‘base document’ for drafting new standard
• New standard to be in 3 parts:
– ISO 55000: Asset management - Overview, principles and terminology – ISO 55001: Asset management - Management systems - Requirements – ISO 55002: Asset management - Management systems - Guidelines for
the application of ISO 55001
![Page 21: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/21.jpg)
21
Countries involved in ISO/PC251 as Participants or Observers
1. Argentina 2. Australia 3. Canada 4. Czech Republic 5. Denmark 6. Finland 7. Germany 8. India
9. Ireland 10. Italy 11. Republic of Korea 12. Netherlands 13. Mexico 14. Peru 15. Portugal 16. South Africa
17. Spain 18. Sweden 19. United Kingdom 20. United States of America 21. United Arab Emirates 22. Japan 23. France 24. Switzerland
1. Armenia 2. Austria 3. Belgium 4. Hong Kong 5. Iraq 6. Israel 7. Malaysia
8. Morocco 9. New Zealand 10. Norway 11. Slovakia 12. Switzerland 13. Thailand
ISO/PC251 Participating Members
ISO/PC251 Observer Members
![Page 22: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/22.jpg)
Asset Management Business Process Model
Source: CIGRE WG C1.
![Page 23: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/23.jpg)
What is a smart (or smarter) grid ?
• Definition is not easy - Wide scope - Stakeholders own vision/perspective
• Smart Grids European Technology Platform definition:
“A smart grid is an electricity network that can intelligently integrate the behaviour and actions of all users connected to it (generators, consumers and those that do both) in order to efficiently deliver sustainable, economic and secure electricity supplies. A smart grid employs innovative products and services together with intelligent monitoring, control, communication and self-healing technologies…”
• Convergence of the three sectors: - energy, communication infrastructures and information technology… - To achieve sustainability and efficiency
![Page 24: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/24.jpg)
Smarter Grid
Source: CIGRE Symposium The Electric Power System of the Future
![Page 25: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/25.jpg)
Smarter Grid Characteristics
• Advanced metering infrastructure (AMI) • Substation automation (SA) • Distributed generation (DG) • Accommodates wide variety of supply and demand • Demand response (DR) • Greater use of transmission capacity • Self-healing • Resilient to physical and cyber attacks • Delivers power quality for 21st century users • Improve energy efficiency • Enables and supported by competitive markets
Source: CIGRE Symposium The Electric Power System of the Future
![Page 26: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/26.jpg)
Smarter Grid – Some Approaches
Source: CIGRE Symposium The Electric Power System of the Future
![Page 27: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/27.jpg)
The Active Distribution Network Efficient energy
use
The need for DSM
Electricity storage
Electric vehicles
The need for coordinated charging
and discharging
The need for aggregation,
cooperation and optimization
SmartGrids
The need to control and
aggregate DG
The need for New network Planning criteria
Larger share of DG
Source: CIGRE Symposium The Electric Power System of the Future
![Page 28: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/28.jpg)
Network Planning – International Practice
Main Points
• Markets give rise to uncertainty in future power flows
• Market survey essential to identify transmission capacity needed
• Managing power flows through combination of investment in assets and operational measures – risk analysis
• Long term studies undertaken linked to Government energy policy • Probabilistic analysis used to gain picture of future
![Page 29: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/29.jpg)
Market Condition – Network Flow MW
Transmission Options – Risk Management
Long term planning measures
Shorter term operational measures
Probability Distribution of Power Flows
![Page 30: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/30.jpg)
Regulation
Source: CIGRE Symposium The Electric Power System of the Future
![Page 31: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/31.jpg)
Performance-based regulation of outputs
Source: CIGRE Symposium The Electric Power System of the Future
![Page 32: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/32.jpg)
Potential performance indicators of transmission
Source: CIGRE Symposium The Electric Power System of the Future
![Page 33: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/33.jpg)
Unplanned interruptions excluding exceptional events; number of interruptions per year 1999-2007
Reference: CEER report December 2008 – 4th Benchmarking Report on Quality of Electricity Supply 2008
![Page 34: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/34.jpg)
Unplanned interruptions excluding exceptional events; minutes lost per year 1999-2007
Reference: CEER report December 2008- 4th Benchmarking Report on Quality of Electricity Supply 2008
![Page 35: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/35.jpg)
Financial Incentive Structure
![Page 36: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/36.jpg)
The Future European Supergrid
Source: CIGRE-UK Conference: Connection of Remote Offshore Windfarms
![Page 37: Transmission Management An International Review - CIGRE](https://reader030.fdocuments.net/reader030/viewer/2022012608/619bb6d7b77ea71d6f1a4fbb/html5/thumbnails/37.jpg)
Thank You