Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy...
Transcript of Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy...
![Page 1: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/1.jpg)
Transmission IncentivesTransmission Incentives
P. Kumar AgarwalP. Kumar AgarwalActing Director, Division of Reliability & Acting Director, Division of Reliability &
Engineering ServicesEngineering ServicesFederal Energy Regulatory CommissionFederal Energy Regulatory Commission
U.S. DOE, Energy Information Administration U.S. DOE, Energy Information Administration 2009 Energy Conference2009 Energy Conference
Washington, DCWashington, DCApril 7, 2009April 7, 2009
![Page 2: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/2.jpg)
22
HistoryHistory
Energy Policy Act of 2005, August 5, Energy Policy Act of 2005, August 5, 20052005–– Created FPA Section 219Created FPA Section 219
FERC issued order No. 679 on July 20, FERC issued order No. 679 on July 20, 2006 adopting regulations to promote 2006 adopting regulations to promote transmission investment through transmission investment through pricing reformpricing reform
![Page 3: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/3.jpg)
33
FPA Section 219 and Order No. FPA Section 219 and Order No. 679679
GoalsGoals–– ensure reliability and reduce the cost of ensure reliability and reduce the cost of
delivered power by reducing transmission delivered power by reducing transmission congestioncongestion
–– promote capital investment in the promote capital investment in the enlargement, improvement, maintenance, enlargement, improvement, maintenance, and operation of transmission facilitiesand operation of transmission facilities
–– provide a return on equity that attracts provide a return on equity that attracts new investment in transmission facilitiesnew investment in transmission facilities
![Page 4: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/4.jpg)
44
Transmission IncentivesTransmission Incentives
Types of IncentivesTypes of Incentives–– Higher Return on EquityHigher Return on Equity
usually ranges from 50usually ranges from 50--200 basis points200 basis points
–– Recovery of CWIP (Construction WorkRecovery of CWIP (Construction Work--inin-- Progress)Progress)
–– Recovery of Abandonment CostsRecovery of Abandonment Costs–– Advanced Technology AdderAdvanced Technology Adder
![Page 5: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/5.jpg)
55
Rebuttable PresumptionRebuttable Presumption
It is assumed that a project qualifies It is assumed that a project qualifies for transmission incentives if it meets for transmission incentives if it meets one of the following:one of the following:–– Approved through a Regional Planning Approved through a Regional Planning
Process (e.g. PJMProcess (e.g. PJM’’s RTEP Process)s RTEP Process)–– National Interest Electric Transmission National Interest Electric Transmission
Corridor (NIETC)Corridor (NIETC)–– Approved by state siting authorityApproved by state siting authority
![Page 6: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/6.jpg)
66
Nexus TestNexus Test
Project must demonstrate a nexus Project must demonstrate a nexus between the incentive sought and the between the incentive sought and the investment madeinvestment made
The total package of incentives is The total package of incentives is weighed against the risks, challenges weighed against the risks, challenges and benefits of project as a wholeand benefits of project as a whole
![Page 7: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/7.jpg)
77
Orders Granting IncentivesOrders Granting Incentives
Out of 33 projects seeking Out of 33 projects seeking transmission incentives to build new transmission incentives to build new transmission:transmission:–– 27 accepted27 accepted–– 3 rejected3 rejected–– 3 pending3 pending
![Page 8: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/8.jpg)
88
Summary of FERC Actions on Summary of FERC Actions on Transmission IncentivesTransmission Incentives
27 Accepted Projects27 Accepted Projects–– Total cost ~ $27 billionTotal cost ~ $27 billion–– Total new transmission lines ~ 8,000 Total new transmission lines ~ 8,000
milesmiles–– Range of kV: 230 Range of kV: 230 –– 765 kV765 kV–– Range of basis points: 100Range of basis points: 100--200200
![Page 9: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/9.jpg)
99
Major Transmission Projects Major Transmission Projects that Received Incentivesthat Received Incentives
PacifiCorp (Energy Gateway Project)PacifiCorp (Energy Gateway Project)
2,000 miles of 500 kV, 345 kV, and 230 kV 2,000 miles of 500 kV, 345 kV, and 230 kV transmission line in a sixtransmission line in a six--state region state region delivering 3,000 MW of capacity from delivering 3,000 MW of capacity from locationlocation--constrained renewable resources in constrained renewable resources in Wyoming to distant load centersWyoming to distant load centers
Cost $6 billion; completion by 2014Cost $6 billion; completion by 2014
Received 200 basis points of tx incentivesReceived 200 basis points of tx incentives
![Page 10: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/10.jpg)
1010
Major Transmission Projects Major Transmission Projects that Received Incentives that Received Incentives (cont(cont’’d)d)
TallgrassTallgrass Transmission & Prairie Wind Transmission & Prairie Wind TransmissionTransmission
400 miles of 765 kV line in Oklahoma and 400 miles of 765 kV line in Oklahoma and Kansas facilitating the connection of over Kansas facilitating the connection of over 10,000 MW of renewable 10,000 MW of renewable
Cost $1.1 billion; completion by 2013Cost $1.1 billion; completion by 2013
Received 150 basis points of tx incentivesReceived 150 basis points of tx incentives
![Page 11: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/11.jpg)
1111
Major Transmission Projects Major Transmission Projects that Received Incentives that Received Incentives (cont(cont’’d)d)
Pioneer Transmission (AEP/Duke)Pioneer Transmission (AEP/Duke)
240 miles of 765 kV line facilitating the 240 miles of 765 kV line facilitating the interconnection of over 4,000 MW of wind interconnection of over 4,000 MW of wind generationgeneration
Cost $1 billion; completion by 2015Cost $1 billion; completion by 2015
Received 200 basis points of tx incentiveReceived 200 basis points of tx incentive
![Page 12: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/12.jpg)
1212
Major Transmission Projects Major Transmission Projects that Received Incentives that Received Incentives (cont(cont’’d)d)
TransTrans--Allegheny Interstate Line (Allegheny Interstate Line (TrAILTrAIL))
300 miles of 500 kV line increasing the 300 miles of 500 kV line increasing the westwest--toto--east transfer capability by 3,800 east transfer capability by 3,800 MW over base case levelsMW over base case levels
Cost $870 million; completion by 2011Cost $870 million; completion by 2011
Received 100 basis pointsReceived 100 basis points
![Page 13: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/13.jpg)
1313
Trail Route in West Virginia and Trail Route in West Virginia and PennsylvaniaPennsylvania
![Page 14: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/14.jpg)
1414
Rest of Rest of TrAILTrAIL RouteRoute
![Page 15: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/15.jpg)
1515
Transmission Line MileageTransmission Line Mileage
1990(actual)
2000(actual)
2007(actual)
2012(proj.)
2017(proj.)
Total Miles ACand DC
Transmissionlines (>230 kV)
146,595 155,669 163,480 174,436 177,988
PercentIncrease 6.19% 8.87%
![Page 16: Transmission Infrastructure: FERC’s Role · Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration 2009 Energy Conference Washington, DC April 7, 2009.](https://reader033.fdocuments.net/reader033/viewer/2022042200/5e9febb3a3b1906fbd68879f/html5/thumbnails/16.jpg)
1616
SummarySummary
Transmission Incentives are designed to Transmission Incentives are designed to foster a more robust grid through greater foster a more robust grid through greater investmentinvestment
Petitioners can receive General ROE Adder, Petitioners can receive General ROE Adder, CWIP, Recovery of Abandonment costs and CWIP, Recovery of Abandonment costs and Advanced Tech AdderAdvanced Tech Adder
FERC acted on 27 projects representing FERC acted on 27 projects representing 8,000 miles of new transmission 8,000 miles of new transmission