Transit Performance UpdateJulie Kirschbaum, Director of TransitSFMTA Board of Directors March 3, 2020
2
90-Day Action Plan Wrap-up
90-Day Action Plan InitiativesNovember 1, 2019 to January 31, 2020
Reduce preventable collisions and enhance passenger and operator
security
Ensure vehicle availability meets demand and that benefits of the
new fleet are realized
Improve reliability of transit service to ensure passengers are provided
with the service they expect
Improve employee engagement by implementing a series of employee
generated service enhancement recommendations
3
Recent PerformanceAction Target January
Reduce preventable collisions 55/month or less 52
Reduce early departures on routes with frequencies 15-30 min
20% or below 17%
Improve Headway Adherence on frequent routes
90% or above 86%
Increase service delivery 96% or above 97%
Increase service delivery–Equity Routes 96% or above 97%
Reduce number of subway delays exceeding 20 minutes
4 or fewer per month
2
Improve LRV4 AvailabilityAt least 48 cars per
day43
4
*Note: Preventable collisions are for December; figures for January are still under review.
Emphasis on SafetyThe SFMTA pursued 6 actions aimed at reducing collisions while also improving safety for Operators and passengers
MMT Egress Gate Replacement
-
Rear Bus Door Safety Decals
Providing a safe operating environment will continue to be a key initiative in the next 90-Day Action Plan
5
6
Preventable Collision Target
52*
0
10
20
30
40
50
60
70
80
90
Apr 2019
May 2019
Jun 2019
Jul 2019
Aug 2019
Sep 2019
Oct 2019
Nov 2019
Dec 2019
Num
ber
of In
cide
nts
Count of Incidents 90-Day Target
*Note: Preventable collisions are for December. Figures for January still under review.
ReliabilityWe met key reliability goals by targeting subway maintenance and Operator hiring.
Extended subway maintenance window
Quick build policy developed for Muni’s slowest segments
Hire trainers for Operator classes every 5 weeks
Actions taken in the most recent 90-day plan will help reduce missed runs over the next 3 - 6 months
7
8
Service Delivery Equity Routes
88%
90%
92%
94%
96%
98%
100%
Apr 2019
May 2019
Jun 2019
Jul 2019
Aug 2019
Sep 2019
Oct 2019
Nov 2019
Dec 2019
Jan 2020
% S
ervi
ce H
ours
Del
iver
ed
Systemwide Light RailMotor Coach Trolley Coach90-Day Target Low Income/Minority Routes
Systemwide: 97%
Equity Routes: 97%
9
Major Subway Delays
0
2
4
6
8
10
12
Ap
r 2019
May 2019
Jun 2019
Jul 2019
Aug 2019
Sep 2019
Oct 2019
No
v 2019
Dec 2019
Jan 2020
Inci
den
t C
oun
t
Major Delay (>20 min)
90-Day Target
• Dec 1 – LRV4 failure (propulsion) at Duboce Junction, 23-min delay
• Dec 7 – Station flooding
• Jan 8 – Vehicle delay (mirrors) at Embarcadero OB, 26-min
• Jan 25 – Switch failure between Van Ness and Church, 23-min delay
10
Critical Subway Repair Priorities
Track Maintenance Overhead LinesMechanical
Systems GroupSignal Maintenance
Replace Switch Points -Church and Duboce
Replace Switch Points -MMT
Clean Tracks
Repair and replace 3 Sticks Rail - MMT
Adjust plates and fasteners - MMT
Inspect and adjust Rail Lubricators
Replace overhead contact wire at various locations
Eliminate numerous wire splices
Inspect, adjust and replace hardware
Remove Temporary Section Breaks installed for the Twin Peaks Tunnel project
Wet Standpipes
Life Safety Systems
Inspect for Water Issues
Crossover Doors
Catwalk Grates at MMT
Fire Panels
Deluge System
Crossover lighting
Station lighting
Replace Relay Room Batteries
Duboce Loop Adjustments
Support Track Crew
Inspection of Blue Lights and CCTV
Buildings and Grounds
Steam Cleaning Platform Stations
Motive Power
Electrical Switching and Support
11
12
13
Median Subway Travel Time
11.4
11.6
19
21.9
0
5
10
15
20
25
Feb 2019
Mar 2019
Apr 2019
May 2019
Jun 2019
Jul 2019
Aug 2019
Sep 2019
Oct 2019
Nov 2019
Dec 2019
Jan 2020
Trav
el T
ime
(min
)
J, N - Inbound (AM Peak) J, N - Outbound (PM Peak)
K, L, M - Inbound (AM Peak) K, L, M - Outbound (PM Peak)
Rail Vehicle AvailabilityThe LRV4s are meeting our reliability targets, which increases overall vehicle availability and reduces missed service.
Increased LRV4 availability to 43 per day
Reliability program exceeded January 2020 targets
Hired 7371-Electrical Transit System Mechanics
We are looking ahead and planning to increase the Siemens to Breda vehicle ratio
14
--
15
Rail Vehicle Availability
25 28 31 24 25 23 29 33 34 34 40 41 43
112 107 97 113 115 110 112 113 116 114 117 111 111
0
20
40
60
80
100
120
140
160
180
Jan 2019
Feb 2019
Mar 2019
Apr 2019
May 2019
Jun 2019
Jul 2019
Aug 2019
Sep 2019
Oct 2019
Nov 2019
Dec 2019
Jan 2020A
vera
ge d
aily
car
s av
aila
ble
Siemens (LRV4) Breda (LRV2-3) 90-Day Target LRV4 Availability
-
5,000
10,000
15,000
20,000
25,000
30,000D
ec-1
8
Jan-
19
Feb-
19
Mar
-19
Apr
-19
May
-19
Jun-
19
Jul-1
9
Aug
-19
Sep-
19
Oct
-19
Nov
-19
Dec
-19
Jan-
20
Feb-
20
Mar
-20
Apr
-20
May
-20
Jun-
20
Mile
s tr
avel
led
betw
een
failu
res
16
LRV4 Reliability Program
Reliability Program Target
Siemens Fleet
Employee Generated FeedbackWe made progress on employee-generated items, but still have work to do. We will continue this initiative in next cycle.
Implement new feedback tool on operator portal
Vacancy & overtime reports
We are implementing programs to address concerns raised by our own staff
17
Next 90-Day Cycle
19
Next 90-Day Cycle Steps
- 4%Preview the upcoming 90-day cycle
Action development within teams
Action items signed off, prepare for implementation
BRAINSTORM DEVELOP FINALIZE
SHARE
Share upcoming cycle initiatives
90-Day Action Plan scheduled to start March 15, 2020
REFLECT
Review results, gather feedback from staff
February 22
February 26 March 4 March 11
February 11
90-Day Action Plan Initiatives
March 15, 2020 to June 15, 2020
20
Improve subway reliability by developing plan to make near-term
improvements to service and infrastructure
Improve capacity to address service reliability by filling critical vacancies and deploying new and enhanced
training programs
Improve employee engagement by implementing a series of employee
generated service enhancement recommendations
Reduce preventable collisions and enhance passenger and operator
security
Thank you
21