Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

38
Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning

Transcript of Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

Page 1: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

Traffic Analysis Toolbox &Highway Capacity Manual Transition

Tyrone ScorsoneFDOT Systems Planning

Page 2: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

2

Transportation Research Board’s (TRB) Highway Capacity Manual (HCM)

Page 3: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

3

HCM Quality/Level of Service (QLOS) Handbook

Facility Level Analysis Detailed Point & Segment Analysis

Page 4: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

4

Advantages of Analytical/Deterministic Tools

Quickly predict impacts

Widely accepte

d

Page 5: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

5

LOS Planning/Preliminary Engineering Tools

PreliminaryEngineering

Software

GeneralizedPlanning

Tables

http://www.dot.state.fl.us/planning/systems/sm/los/default.htm

Page 6: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

6

Page 7: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

7

Capacity/LOS Analyses and Evaluation Tools

Pote

ntial

Acc

urac

y

Generalized Tables

ARTPLAN FREEPLAN HIGHPLAN

HCM | TCQSM BLOS | PLOS

TRANSYT-7F

CORSIM

(Generalized Planning)

(Preliminary Engineering)

(Simple Operational Analysis)

(Microsimulation)

Effort/Complexity

Page 8: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

8

Exporting Data to Highway Capacity Software (HCS)

Page 9: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

9

Planning Uses of LOS Techniques

Initial problem identification

Delay calculation

Future year analysis

Conducting alternatives analyses

Assessing development impacts

Page 10: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

10

Primary Uses of LOS Techniques

Site Impact Project Development

Future Year

AnalysisOther

Page 11: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

11

Transportation Impact Handbook

FDOTTransportationImpactHandbook.com

Page 12: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

12

Screen for impacts of Development

Page 13: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

Screen for impacts of Development

13

Screen for impacts of Development

Page 14: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

14

The Users Perspective

Page 15: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

15

Automobile LOS

A/B

E/F

C/D

Page 16: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

16

Modal LOSBicycle

A/B

E/F

C/D

Page 17: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

17

Modal LOSPedestrian

A/B

E/F

C/D

Page 18: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

18

Modal LOSBus 2 to 4 buses/hour

< 1 bus/hour

>4 buses/hour

A/B

E/F

C/D

Page 19: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

19

Capacity/LOS Analyses and Evaluation Tools

Pote

ntial

Acc

urac

y

Generalized Tables

ARTPLAN FREEPLAN HIGHPLAN

HCM | TCQSM BLOS | PLOS

TRANSYT-7F

CORSIM

(Generalized Planning)

(Preliminary Engineering)

(Simple Operational Analysis)

(Microsimulation)

Effort/Complexity

Page 20: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

20

Generalized Service Volume Tables…

…allow analysts to quickly and easily compare volumes to estimate LOS.

…provide estimates of maximum service volumes for various types of Florida road facilities

…represent average roadway conditions for the state, not representative of any single roadway

Page 21: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

21

Types of Tables

Peak Hour Peak Direction

Urbanized Transitioning/Urban Rural

Peak Hour Two-Way

Urbanized Transitioning/Urban Rural

Daily Two-Way

Urbanized Transitioning/Urban Rural

(However, all are based on a peak hour peak direction analysis)

(mostly used in planning)

Page 22: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

22

Service Volume Tables In General

Page 23: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

23

Potential Applications

Quick estimate of LOS

Is there a problem?

System adequacy

Travel demand models

Roadway quick sizing

Page 24: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

24

Table Exercise 1

• Determine the maximum service volumes – In terms of annual average

daily traffic (AADT) volume– In an urbanized area– For a freeway with: • 6 lanes

LOS=C

LOS=E

95,400

122,700

Page 25: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

25

Capacity/LOS Analyses and Evaluation Tools

Pote

ntial

Acc

urac

y

Generalized Tables

ARTPLAN FREEPLAN HIGHPLAN

HCM | TCQSM BLOS | PLOS

TRANSYT-7F

CORSIM

(Generalized Planning)

(Preliminary Engineering)

(Simple Operational Analysis)

(Microsimulation)

Effort/Complexity

Page 26: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

26

Demonstration Of LOSPLAN

Page 27: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

27

LOS Planning/Preliminary Engineering Toolswill be updated in 2012

www.dot.state.fl.us/planning/systems/sm/los/

2012

Page 28: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

Highway Capacity Manual Transition

28

Page 29: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

29

Implementing the 2010 HCM How Long Will It Take

Presentation Purposes

Highway Capacity ManualPast, Present & Future

Adopting the 2010 HCMWhat Has To Change

Page 30: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

30

2010:Integrated

Multimodal Perspective

HCM/LOS History

1965: LOS Concept

1985:Refined

LOS Direction

Page 31: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

31

2010 Highway Capacity Manual

2010 HCM

To be published this month

Replaces 2000 HCM

Significant changes

New arterial performance

measure

Multimodal

When to phase in?

Receiving implementation

inquiries

Page 32: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

32

Why Not Transition

Immediately?

Need for State-wide Consistent

Response to Phasing in of 2010 HCM

Rules

Policies

Procedures

Arterials

Freeways

“Standard K” Factors

Rule Update

2010 HCM Implementation Issues

ConsistencyImpactsTechnicalLOS

Page 33: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

33

What is “Standard K”?

Rather than having “K” be a traffic variable, make it a fixed parameter based on:

Area Type Facility Type

“K” Factor: Ratio of peak hour traffic to AADT

Page 34: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

34

Importance of LOS Standards and K Factor

• Time and cost savings to FDOT• Update to latest research

Promotes Better Transportation

• Within Department• Throughout development community• Simple to understand

Consistency: Planning Through

Design

• Positive for Development• Supportive of Growth Management Sensible Approach

Page 35: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

35

2 Arterial Classes

1 2

Page 36: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

36

Implementation Schedule

Refine HCM Analyses

Implement “Standard K” Factors

Update LOS Standards

Update Procedures & Guidelines

Coordination, Transition & Adoption

July ‘11 January ‘12 July ‘12 December ‘12

Page 37: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

QUESTIONS?

37

Page 38: Traffic Analysis Toolbox & Highway Capacity Manual Transition Tyrone Scorsone FDOT Systems Planning.

38

FDOT’s transition plan to the 2010 HCM represents a logical comprehensive process which includes evaluating a few key 2010 HCM changes, possibly implementing technical changes to current practice, possibly updating its level of service standards, and updating its own HCM-based software. FDOT recognizes it cannot require this transition period be applied to outside entities; however, it requests those entities accept this relatively short transition period.