Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 ·...

55
Extending the value of Clarity PPM with pre-built components

Transcript of Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 ·...

Page 1: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Extending the value of Clarity PPM with pre-built components

Page 2: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

I have been working in the Project Management Software consulting business since 1993, starting with Artemis, and then onto ABT, Niku and through it’s rebranding to today and Clarity PPM.

About Me

Andrew Litton2007 - TODAY

Pemari Consulting Ltd

Page 3: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Extending the value of Clarity PPM with pre-built components

Why Extend

• Clarity PPM is feature rich but no two companies are exactly the same

• Requirements for Clarity PPM differ

• Not all features necessary to make your daily work easier are available in Clarity PPM

Page 4: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Extending the value of Clarity PPM with pre-built components

How to Extend

• Don’t and live with the capabilities as they are

• Build your own

• Benefit from available add-ons and support

Page 5: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Session AgendaExtending the value of Clarity PPM with pre-built components

SimplifyAccess DataIntegrate

Page 6: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Simplify

Page 7: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Intuitive Navigation in Clarity PPM

§ Simplify access to Clarity PPM capabilities with tiles

Page 8: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

• One-Click Navigation to Pages and Subpages

• Better User Experience • Graphical visualization of

navigation links in CA PPM

Navigation Tiles: General

Page 9: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Navigation Tiles: General

A great number of possibilities:• Create new Projects/Ideas/…• Open: • (Sub-) Pages• Lists • Reports

• Call Actions• Call URLs with context specific

parameters

Page 10: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Navigation Tiles : Projects

Navigation within Objects• Substitute the Tab and Subpage

Navigation• Link directly to Subobjects• Link to other Websites like JIRA,

SharePoint, …

Page 11: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Navigation Tiles: Configuration

Quick and Easy configuration

Page 12: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Permission specificappearance:

Admin User sees all ofthe Navigation Tiles

Navigation Tiles: Permissions

Page 13: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Navigation Tiles: Permissions

Permission specificappearance:

Regular User onlysees relevant

Navigation Tiles

Page 14: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Navigation Tiles: Wide selection of icons

14

Choose between 1 …

Navigation Tiles support: • Font Awesome Icons• Google Material Icons

…or 2 Icons per Tile

Page 15: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Navigation Tiles: Flexible and easy arrangement

15

Navigation Tiles can be sorted forusing the available space in a flexible way

Page 16: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

16

It is also possible to use a fixed position to group theTiles

Navigation Tiles: Flexible and easy arrangement

Page 17: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

17

Navigation Tiles: Change tiles depending on Stage

17

Click on Tile tofinish Project Stage

Page 18: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

18

Navigation Tiles: Change tiles depending on Stage

18

Page 19: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

19

Navigation Tiles: Configure them yourself

19

§ The Look and Feel: § Style

§ Colors

§ Position

§ Icons

§ Sizes

19

§ Texts and Links: § Title § URL § Hover Text

§ Security: § Permissions

Page 20: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Navigation Tiles: Integrate Classic into Modern UX

Use Navigation Tiles to switchseamlessly between Classic UI and Modern UXe.g. Jump to Kanban Board from Classic UI

Page 21: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Action Item Responder

§ Easily respond to Clarity PPM Action Items directly within email

Page 22: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Action Item Responder

§ Improve Action Item response times

§ Simplifies dealing with Action Items for managers

§ Works with any mail client

§ Supports adding Notes to response

Page 23: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner

• Single or cross-project resource planning

• Optimally and quickly plan your resources

• See effects of changes in plan to resource workload in real-time

§ Is your Resource Planning tedious and prone to errors?

Page 24: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner

Page 25: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Views

Page 26: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Roles or Resource

Advanced Resource Planning allows you to see directly whether a role or a specific resource is scheduled for a project.

Page 27: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Scenarios

Upper bar : Planned resource allocation

Lower bar Resource Allocation Scenario

Page 28: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Scenarios

Blue numbers indicate changes in the plan scenario (compared to the original plan)

Page 29: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: ETCAdvanced Resource Planning enables planning at the detailed task level

Page 30: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Moving Tasks/Phases

Move Gantt bar

Page 31: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Custom Attributes

Advanced Resource Planning allows you to filter by custom attributes and display them in columns in the tool.

Page 32: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Trigger Actions

Advanced Resource Planning allows you to trigger custom actions from the editor. The selection of available actions in the context menu can be easily customized.

Page 33: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: Filters

Page 34: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Advanced Resource Planner: The Benefits

FORProject Managers

§ Edit resource assignments or allocations for multiple projects on one screen

§ Drill down into phases and tasks and edit detailed task assignments

§ Real time feedback – color highlighted

§ Super fast

FORResource Managers

§ See a resource’s full workload across all investments on the same screen

§ Pivot by resource or by project

§ Edit ETC even for non-projects (other work, services, etc.)

§ Works with huge installations

Page 35: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Single Sign-on

§ Simplify access to Clarity PPM

§ Kerberos/NTLMv2 or SAML 2 options

§ Supports deep links

§ Centralise control of Users and policies

Page 36: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Document Drive

§ Easy quick editing of Documents in Clarity PPM

Page 37: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Document Drive

§ Access the Clarity PPM Documents via a local folder

§ Supports any existing WebDav Client

§ Maintains folder structure

§ Supports the Clarity PPM rights model

§ Respects Document versioning

Page 38: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Access Data

Page 39: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Data Loader

§ Fast bulk loading of Excel (XLSX) data

§ All within Clarity PPM

Page 40: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Data Loader

§ Configurable data validation & mapping

§ Configurable templates

Page 41: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Excel Exchange

§ Bi-directional exchange of data with Microsoft Excel

Page 42: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Excel Exchange

§ Connect to Clarity PPM from Excel

§ Grab data from Clarity PPM with freely selectable objects

§ Filter for specific data

§ Edit the data in Excel and save the changes to Clarity PPM

Page 43: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Timeslicer

§ Real-time direct access to all of the time scaled data stored in BLOBS/Image columns

SELECT C.PRID, E.STARTDATE, E.FINISHDATE, E.DUR/3600FROM PRCALENDAR C

CROSS JOIN TABLE(PL_PEM_CRVLIB.CAL_EXCEPTIONS(C.PRVALUE, 1)) E

§ Use in Reports, Portlets or Processes

Page 44: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

TimeSlicer

§ Oracle: single package PL_PEM_CRVLIB + Java code

§ Ships with approx. 50 functions

§ SQL Server: Scalar and Table functions plus .NET assembly

§ Easy install

Page 45: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

TimeSlicer: Time Slices

§ No need to create custom slices

§ Removes the need to expand the TimeSlice date ranges.

§ Slice by calendar periods and fiscal periods

§ Weekly periods can start on any day of the week

§ No date restriction

Page 46: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

TimeSlicer: What else

§ Extract BLOB segments

§ Report on Calendars, shifts and exceptions

§ Resource availability rate

§ Validates BLOBs – checking for errors

Page 47: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Integrate

Page 48: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Jira Integration

§ Avoid duplicating effort

§ See your Jira planned projects in Clarity PPM

§ Minimise risk of errors

Improve efficiency & data quality

Page 49: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Jira IntegrationClarity PPM

Create a project in Clarity PPM

Task WBS imported to Clarity PPM project

Time imported to Clarity PPM timesheets

Clarity PPM –JIRA Software

Interface

Clarity PPM project imported to JIRA

Create epic, issues, subtasks for the project

Create sprints and plan sprints with the issues

Start the sprint and start booking time (worklogs) on subtasks

Page 50: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Jira IntegrationClarity PPM

Project

Task

Task

Timesheet

Subtask

Issues

Subtask

Subtask

Subtask

Subtask

Subtask

Subtask

Worklog hours Worklog hours Worklog hours

Epics and sprints get captured in task attributes

Program

Phase

Story BugTask

Project

Epic

Sprint

Time entries

Page 51: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Team Capacity

§ Clarity PPM for capacity and strategic planning

§ Jira for operational Sprint planning

§ There’s a need for data transparency between the two Resource planning processes

Page 52: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Team Capacity

§ Unify Jira and Clarity PPM data

§ Combine Sprint planning with Clarity PPM Team Capacity data

Page 53: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Team Capacity

§ Imports Jira tasks and sprints from Jira to Clarity PPM

§ Drag and drop users stories between sprints

§ Provides immediate feedback on changing utilisation rates - allocation vs assignment

Page 54: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Extending the value of Clarity PPM with pre-built components

Questions?

Page 55: Track 2 - Extending the value of Clarity PPM with pre-built … 2 - Extending... · 2019-05-20 · (worklogs) on subtasks. Jira Integration ClarityPPM Project Task Task Timesheet

Thank you for attendingExtending the value of Clarity PPM with pre-built components

Phone+44 844 736 2500

[email protected]

Websitehttps://www.pemari.com/

Let us know how we can improve!

Don’t forget to fill out the feedback forms!