Transcript of Tracer Case Study
-
Reservoir fl uid in-fl ow measurement from a tight oil fi eld development
RESERVOIR CHARACTERISATION
The Project
A customer requested a Tracerco fracture fl ow study that
would allow oil in-fl ow behavior to be measured following
completion of an unconventional well to better understand
contribution from each stimulated interval.
Sixteen unique organic based tracers were selected
for the project. Each tracer was injected at the leading
edge of individual hydraulic fracture stages when fi rst
solids were added to the hydraulic fl uids in order that the
tracer would penetrate deep into the fracture structure
and make contact with formation oil. During stimulation
treatment, stage three was abandoned due to operational
issues. Subsequent back fl ow of the well and analysis
of tracer presence in oil samples allowed relative oil fl ow
contribution from each stage to be measured.
Well Specifi cation
The horizontal oil well at 2km 928mTVD was located in
the Eagle Ford Shale and it was planned to carry out a 16
stage hydraulic fracture program. These would be evenly
distributed along the well bore length at 300 feet intervals.
Tracerco Technology
The specialist oil based tracers have a high affi nity for
oil and are very insoluble in water. As such they readily
partition from the water into the oil phase upon contact
with reservoir oil and allow the source of oil fl ow to be
determined. The technology also allows confi rmation
that fl ow is occurring from the toe end of a well through
downhole equipment after stimulation activities have been
completed.
Sampling
Following completion of the stimulation the well was
fl owed to clean up and start production. 25ml samples of
oil were collected on a regular basis and analysis for tracer
presence carried out using specialist equipment.
Results
Results reveal initial oil fl ow from stages closer to the heel
of the well with mid point being very low and toe fl ow
response from only the last two stages. As fl ow continues,
toe fl ow overall contribution increases but mid well fl ow
continues to be relatively low with as many as four stages
contributing zero to the overall production. The results are
shown overleaf.9500
9600
9700
9800
9900
10000
10100
10100 10600
10325 1063710948
1126011571
1188312195
12506 1281813129
1344113676 13911
1414414378
1461314845
11100 11600
Measured Depth
Well Path Sleeves Frac Plug Float Equipment Top Target
Dep
th (T
VD
)
1260012100 13100 13600 14100 14600 15100
10200
10300
10400
10500
-
RESERVOIR CHARACTERISATION
Billingham, UK Tel: +44 (0) 1642 375500
Norway Tel +47 55 36 55 40
Abu Dhabi, UAE Tel +971 (0) 2 5541672
Kuala Lumpur, Malaysia Tel +603 7803 4622
Pasadena, USA Tel: +1 281 291 7769
Rio de Janeiro, Brazil Tel +55 21 3535 7600
www.tracerco.com/reservoir-characterisation. For all email enquiries please contact: [email protected] Limited is a subsidiary of Johnson Matthey Public Limited Company, 5th Floor, 25 Farringdon Street, London EC4A 4AB. Registered in England No. 4496566. Tracerco is a trading name of Tracerco Limited. TRACERCO and the Johnson Mathey logo are trademarks of the Johnson Matthey group of companies.
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0
15
10
5
20
25
30
35
40
0.00 0.50
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
1.00 1.50 2.00 2.50 3.00 3.50
Produced Tracer in Sample (relative to total tracer injected
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Produced Tracer in Sample (relative to total tracer injected)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)Tr
acer
in s
ampl
e (%
of to
tal t
race
r in
ject
ed)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
0.5%
1.5%
2.0%
2.5%
3.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
1.0%
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.007.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
Stage Production FlowRelative % of Production Flow
Stage Production - 0 3.2 days
15.7%
5.6%
14.4%
8.1%
9.6%
7.1%
0.2%
5.2%
2.7% 2.9%
7.0%
11.4%
10.2%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 3.6 6.6 days
16.7%
4.2%
9.3%
4.7%
11.8%
4.7%
0.0%
7.4%
0.5%
2.1%
9.6%
19.0%
10.0%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 7.4 13.6 days
17.0%
2.9%
10.3%
7.4%
10.5%
5.1%
0.0%
9.2%
0.0% 0.0%
9.5%
18.3%
9.7%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production over 13.6 days
16.4%
4.3%
11.6%
6.9%
10.5%
5.8%
0.1%
7.2%
1.2%1.7%
8.6%
15.8%
10.0%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
First three days fl ow from well start up
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0
15
10
5
20
25
30
35
40
0.00 0.50
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
1.00 1.50 2.00 2.50 3.00 3.50
Produced Tracer in Sample (relative to total tracer injected
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Produced Tracer in Sample (relative to total tracer injected)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)Tr
acer
in s
ampl
e (%
of to
tal t
race
r in
ject
ed)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
0.5%
1.5%
2.0%
2.5%
3.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
1.0%
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.007.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
Stage Production FlowRelative % of Production Flow
Stage Production - 0 3.2 days
15.7%
5.6%
14.4%
8.1%
9.6%
7.1%
0.2%
5.2%
2.7% 2.9%
7.0%
11.4%
10.2%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 3.6 6.6 days
16.7%
4.2%
9.3%
4.7%
11.8%
4.7%
0.0%
7.4%
0.5%
2.1%
9.6%
19.0%
10.0%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 7.4 13.6 days
17.0%
2.9%
10.3%
7.4%
10.5%
5.1%
0.0%
9.2%
0.0% 0.0%
9.5%
18.3%
9.7%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production over 13.6 days
16.4%
4.3%
11.6%
6.9%
10.5%
5.8%
0.1%
7.2%
1.2%1.7%
8.6%
15.8%
10.0%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
Three to six days fl ow from well start up
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0
15
10
5
20
25
30
35
40
0.00 0.50
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
1.00 1.50 2.00 2.50 3.00 3.50
Produced Tracer in Sample (relative to total tracer injected
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Produced Tracer in Sample (relative to total tracer injected)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)Tr
acer
in s
ampl
e (%
of to
tal t
race
r in
ject
ed)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
0.5%
1.5%
2.0%
2.5%
3.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
1.0%
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.007.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
Stage Production FlowRelative % of Production Flow
Stage Production - 0 3.2 days
15.7%
5.6%
14.4%
8.1%
9.6%
7.1%
0.2%
5.2%
2.7% 2.9%
7.0%
11.4%
10.2%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 3.6 6.6 days
16.7%
4.2%
9.3%
4.7%
11.8%
4.7%
0.0%
7.4%
0.5%
2.1%
9.6%
19.0%
10.0%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 7.4 13.6 days
17.0%
2.9%
10.3%
7.4%
10.5%
5.1%
0.0%
9.2%
0.0% 0.0%
9.5%
18.3%
9.7%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production over 13.6 days
16.4%
4.3%
11.6%
6.9%
10.5%
5.8%
0.1%
7.2%
1.2%1.7%
8.6%
15.8%
10.0%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
Six to 14 days fl ow from well start up
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0
15
10
5
20
25
30
35
40
0.00 0.50
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
1.00 1.50 2.00 2.50 3.00 3.50
Produced Tracer in Sample (relative to total tracer injected
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Produced Tracer in Sample (relative to total tracer injected)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)Tr
acer
in s
ampl
e (%
of to
tal t
race
r in
ject
ed)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
0.5%
1.5%
2.0%
2.5%
3.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
1.0%
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Produced Tracer in Sample (relative to total tracer injected)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
0
15
10
5
20
25
30
35
40
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
0
15
10
5
20
25
30
35
40
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.007.00
Trac
er in
sam
ple
(%of
tota
l tra
cer
inje
cted
)
Comparative Percentage of Produced Tracer (relative to total volume of oil produced)
Stage 1
Stage 8
Stage 15
Stage 2
Stage 9
Stage 16
Stage 3
Stage 10
Stage 4
Stage 11
Stage 5
Stage 12
Stage 6
Stage 13
Stage 7
Stage 14
(BO/Hr)
Production time (d)
0
15
10
5
20
25
30
35
40
Stage Production FlowRelative % of Production Flow
Stage Production - 0 3.2 days
15.7%
5.6%
14.4%
8.1%
9.6%
7.1%
0.2%
5.2%
2.7% 2.9%
7.0%
11.4%
10.2%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 3.6 6.6 days
16.7%
4.2%
9.3%
4.7%
11.8%
4.7%
0.0%
7.4%
0.5%
2.1%
9.6%
19.0%
10.0%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage Production - 7.4 13.6 days
17.0%
2.9%
10.3%
7.4%
10.5%
5.1%
0.0%
9.2%
0.0% 0.0%
9.5%
18.3%
9.7%
30
25
20
15
10
5
0
%
0.0% 0.0% 0.0%
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production FlowRelative % of Production Flow
Stage 16 Stage 15 Stage 14 Stage 13 Stage 12 Stage 11 Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1
Stage Production over 13.6 days
16.4%
4.3%
11.6%
6.9%
10.5%
5.8%
0.1%
7.2%
1.2%1.7%
8.6%
15.8%
10.0%
0.0% 0.0% 0.0%
30
25
20
15
10
5
0
%
Total fl ow to 14 days fl ow from well start up
If you would like to fi nd out more about this technology please contact a Tracerco Technical Advisor at one of our global
operational bases.
XM10
03/0/0