Traceability Inventory

download Traceability Inventory

of 34

description

tracebility inventory

Transcript of Traceability Inventory

  • Transmission Traceability & Shipment ControlMr. Peter Itoa, IT Manager, GETRAG FORD Trasmissions Slovakia, s.r.o.

    Logistic Conference 2015Bratislava, March 18, 2015

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business Requirements

    3. Project Definition

    4. Technical Overview

    5. Deliverables

    2

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business Requirements

    3. Project Definition

    4. Technical Overview

    5. Deliverables

    3

  • Key Figures

    FormationFebruary 1, 2001 as 50:50 joint venture of GETRAG and Ford of Europe

    Development and productionof transmissions

    HeadquartersCologne

    Production plantsCologne

    Halewood

    Bordeaux

    Kechnec

    GETRAG FORD Transmissions

    44

    Sales

    1.16 billion

    World Production

    1.5 million transmissions

    Employees

    4,400

  • Full Service Systems Supplier

    5

    Our service range covers the entire process chain:

    including all engineering services and spare parts

    Idea Concept PrototypingVehicle

    integration

    Mass

    productionValidation

    GETRAG FORD Transmissions

  • GETRAG worldwide

    March 23, 2015Company Presentation6

    24 locations worldwide in Europe, North America and Asia

    14 individual companies

  • Key Facts 2013

    March 23, 2015Company Presentation

    GETRAG in figures

    3.2 Billion EUR 3.9 Million transmissions

    Sales Global production Employees

    7

    13,250

  • Plant Kechnec

    8

    Production of dual clutch transmissions

    (GETRAG PowerShift)

    Established

    2005

    mid 2007 (start of mass production)

    Employees

    1000

    Built capacity

    265k units / year

    - planned extension 400k

    GETRAG FORD Transmissions Slovakia s.r.o.

    Site Management

    Wes Jacklin

  • Kechnec

    Key features:

    Torque Range up to 450 Nm

    2 variants:

    MPS6 (3 shaft design)

    for C- and CD-car

    SPS6 (short 2x2 shaft design)

    for CD-car and SUV

    AWD capable

    Products: Powershift Transmissions 6DCT450

    9

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business Requirements

    3. Project Definition

    4. Technical Overview

    5. Deliverables

    10

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business requirements

    3. Project definition

    4. Technical Overview

    5. Deliverables

    11

  • Problem #1 - TRACEABILITY

  • Powershift: 37 500 m2

    LSC: 10 152 m2

  • Problem #2 - QUALITY

  • Business Issues ...Why has been project established?

    Insufficient quality control tracking of built transmissions

    Missing posibility of unique tracking of each produced piece

    Only transmission type & quantity

    Inventory inaccuracy

    Undesired stock-taking differences

    Negative influence of human factor

  • The main objective

    Prevent the export of any transmission that can have a quality problem

    Inventory accuracy

    IT system supporting "STOP SHIPMENT" process

    Precise control of each produced piece

    Identify & track the causes that led to the eventual qualitative deficiency

    Minimum production and logistics downtime for initial serialization of inventory at GoLive

    Business Need = Project Goals

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business requirements

    3. Project definition

    4. Technical Overview

    5. Deliverables

    17

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business requirements

    3. Project definition

    4. Technical Overview

    5. Deliverables

    18

  • Requestor

    Plant TOP Management

    Project Sponsor

    Senior Manager Manufacturing Engineering

    Project Leader

    Local Plant IT employee

    Business processes overview

    IT expertise

    Project leadership potential

    Project Name

    Transmission Shipment Control (TSC)

    Project Management Methodology

    PRINCE2TM

    19

    TOP

    DOWN

    Project Definition & Potencial

  • Kechnec team:Projekt leader: 1person (IT)

    Logistics: 3 persons

    Production: 1 person

    Quality: 2 persons

    Engineering: 2 persons

    Local IT: 2 persons

    Central IT: 1 person

    Suppliers:HP

    Quantum

    Project Team

    Project Steering Committee: Kechnec Plant

    GETRAG Central IT

    HP

    Quantum

  • Project timing

    1 year (November 2011 December 2012)

    Project set up with

    German HP consultants/ developers working remotely

    Team from Quantum Information Systems Solutions Inc.

    Local Slovak customer team (Business and IT)

    Regular status audios and web-based workshops were held to ensure the quality of

    the deliverables

    During Go-live the entire team worked onsite in the Kechnec plant to

    support the initial serialization of the complete transmission inventory

    ensure a smooth go live of all new functions

    Delivery approach

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business requirements

    3. Project definition

    4. Technical Overview

    5. Deliverables

    22

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business requirements

    3. Project definition

    4. Technical Overview

    5. Deliverables

    23

  • Available IT Landscape

    Assembly End of Line Testing Repair/Repack/Garage Logistics storages Shipping

    S/N HU+

  • TS

    C

    inte

    rfa

    ces

    1

    2

    3

    5 4

    6ATC

    inte

    rfac

    e

    -Net -Net

    Before Now

    Derivate A

    Derivate B

    As

    sy->

    EO

    L->

    Ware

    ho

    use->

    Sh

    ipp

    ing

    ->C

    usto

    mer

    Serial #

    Batch

    processingUnique

    Identification

    &

    blocking

  • The productive SAP ERP ECC 6.0 functionality has been enhanced by implementation of:

    serial number & handling unit management

    warehouse management for shipping stock

    New SAP processes for Logistics have been designed in order to easily: handle stock transfers

    picking

    labeling

    loading using radio-frequency scanner devices

    The existing interface between Q-Net and SAP has been reengineered and new

    scenarios have been developed in order to support: automatic confirmations

    stock transfers

    packing

    reflash

    quality blocks

    Delivery approach (2) (technical view)

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business requirements

    3. Project definition

    4. Technical Overview

    5. Deliverables

    28

  • Agenda

    1. GETRAG FORD Transmissions Slovakia, s.r.o. Introduction

    2. Business requirements

    3. Project definition

    4. Technical Overview

    5. Deliverables

    29

  • TSC Solution Highlights

    Full traceability

    Unique identification of each single transmission in SAP and Q-Net based on serial number

    No SAP movement of transmission without identification by serial number

    Controlled quality status of each unique transmission

    No shipment of NOK/Blocked transmission

    Minimum manual data input

    Hand Held Scanners data input & Automatic data exchange to reduce human failure

    Agility

    Flexible system configuration to easily allow enhancements and roll-outs

    Full flow control of each single transmission

    from ASSEMBLY to the TRUCK

  • TSC Practical Deliverables & Business Benefits

    Blocking process

    Improved, speeded up and related to single serial number

    Increase of transmission stock accuracy

    0 inventory difference during 2012&2013 annual physical inventory

    Transmission Warehouse Management

    Immediate transmission localization in LSC

    Enhanced transmission picking and shipment

    FIFO

    Transmission twins discovering

  • Success Stories of Kechnec TSC Solution

    32

    HP NEWSLETTER: Success Story in GETRAG

    Transmission Shipment Control in SAP ECC 6.0 and Q-Net

    TSC roll-out in GETRAG Mexico

    Irapuato plant, Base on Kechnec pilot, GoLive: 07/2014

    TSC roll-out in GETRAG Germany

    Neunstein plant , GoLive: 12/2014