Transcript of Tpt's bid specification considerations
Click to edit Master title style
TPT’s Chief Executive’s Procurement Imbizo
02 November 2015
Specifications Workshop
Definitions
“Specifications” is the terminology used describe the requirements of goods
“Scope of work” means description of the supplies, services, or engineering and construction works which are to be provided any other requirements and constraints relating to the manner in which the contract work is to be prepared. It is the terminology used to describe the requirements for services
“Goods” means any object or objects whether raw or processed material, movable or immovable, including but not limited to software, that has value.
“Service” is work in respect of which the potential service provider undertakes to provide or perform.
“Bids Specification Committee” is a permanent committee responsible for ensuring that specifications / scope of work is drafted in an unbiased manner to allow a wide spectrum of potential bidders to offer goods and services. The team members will depend on the types of services procured.
Governance
Specifications should be functional and fit for purpose, It must not include exclusionary terms.
Compiling a specification around one supplier’s product is not allowed.
The technical specifications should be as detailed as possible. All technical requirements on which the bidders will be evaluated should be detailed clearly.
The bid documents must be unambiguous and provide a complete explanation of the scope of work as well as the criteria that will be used in the evaluation of bids.
A Cross Functional Evaluation Team must be established to conduct the various evaluations as per the Bid documents.
Bid Specification Committee (BSC)
PURPOSETo ensure that all assurance standards have been met with regards to goods/services requested including;
Adherence to policies and procedures;
Adherence to applicable legislation;
Adherence to good commercial and ethical practice;
Application of an appropriate procurement system which
is fair, equitable, transparent, competitive and cost-
effective; and
Assurance that TPT gets good value for money.
Functions of the Bid Specification Committee
Review specifications and the evaluation criteria;
Ensure that the evaluation criteria are appropriate;
Ensure that specifications are compiled in an unbiased manner to allow potential suppliers to offer their goods and services;
Ensure that the evaluation criteria meet the goals as contemplated in the PPPFA Regulations;
Take into account any acceptable quality standards (e.g. SABS, ISO etc.) with which the equipment, material or workshop should comply;
Specify special conditions where necessary;
Ensure that the necessary funding is available;
Approve the specification before the bid is advertised in the market; and
Ensure that market analysis which informs the procurement strategy has been conducted.
Specifications
The following must be taken into the consideration when drafting specifications”-
Technology
Environment/Climatic Conditions
Comparison to other ports
Level of standardization/usefulness/purposes
Government Policy
Labour Intensity – Level of automation
Fit for use – nice to have
Reliability
Cost of Maintenance
Asset utilization
Tips to potential service providers
Technical Knowledge
Market intelligence
Engineering Knowledge
After support service
Equipment specification/Alternative Supplier
Availability
Pricing
Market Awareness
TPT Equipment
Straddle CarrierRail Mounted Gantry
Click to edit Master title style