Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

download Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

of 17

Transcript of Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    1/17

    Business Requirements Mapping BR.030

    (TP-ENG-RDRM-08)

    Version Control Sheet

    Project Name :

    Document Name : Business Requirements Mapping BR.030(TP-ENG-RDRM-0

    Effective date :

    Author: Reviewer: Approver:

    Signature Signature Signature

    Electronic copies valid without signature

    Document revision history

    Version

    No.Effective date Last Updated By Nature of modification

    Master files are stored electronically and are available to all associates

    Printed copies of the master files are for reference only.

    Company ConfidentialTemplate Ver. 1.0

    Last update on : 20-Jan-2010 Page: 1 of 17

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    2/17

    Change Record

    ##################

    Date Version

    Reviewers

    Distribution

    Note To Holders:

    If you receive an electronic copy of this document and print it out, please write your name

    on the equivalent of the cover page, for document control purposes.

    If you receive a hard copy of this document, please write your name on the front cover,

    for document control purposes.

    Contents

    Document Control

    BRS Solution - Salary Structure

    BRS Solution Earnings Components

    BRS Solution Organization Structure

    BRS Solution Additional Organization Requirements

    Open and Closed Issues for this Deliverable

    Author Change Reference

    Name Position

    Copy Number Name Location

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    3/17

    BRS Solution-

    Functional

    Area Description of Functional Area

    Functional Map: Standard/ Recommended

    Solution

    Extension/

    Customization Gap

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    4/17

    BRS Solution-

    Earnings

    Components

    Functional

    Area Description of Functional Area

    Functional Map: Standard/ Recommended

    Solution

    Extension/

    Customization Gap

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    5/17

    Open and Closed Issues

    Open Issues

    ID

    Closed Issues

    ID

    Issue Resolution Responsibility Target Date

    Issue Resolution Responsibility Target Date

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    6/17

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    7/17

    Change Record

    ##################

    Date Version

    Reviewers

    Distribution

    Note To Holders:

    If you receive an electronic copy of this document and print it out, please write your name

    on the equivalent of the cover page, for document control purposes.

    If you receive a hard copy of this document, please write your name on the front cover,

    for document control purposes.

    Contents

    Document Control

    BRS Solution - Salary Structure

    BRS Solution Earnings Components

    BRS Solution Organization Structure

    BRS Solution Additional Organization Requirements

    Open and Closed Issues for this Deliverable

    Copy Number Name Location

    Position

    Author Change Reference

    Name

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    8/17

    BRS Solution-

    Functional

    Area Description of Functional Area

    Functional Map: Standard/ Recommended

    Solution

    Extension/

    Customization Gap

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    9/17

    BRS Solution-

    Earnings

    Components

    Functional

    Area Description of Functional Area

    Functional Map: Standard/ Recommended

    Solution

    Extension/

    Customization Gap

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    10/17

    Open and Closed Issues

    Open Issues

    ID

    Closed Issues

    ID Issue Resolution Responsibility Target Date

    Target DateIssue Resolution Responsibility

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    11/17

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    12/17

    Application Replacement Mapping

    This section describes the approximate replacement mapping of existing to new applications.

    Application Vendor Application Vendor

    MANMAN/GL ASK General Ledger Oracle

    MANMAN/AP ASK AP Oracle

    Payroll ADP *Retained*

    External Integration Point Replacement Mapping

    Application 1 Application 2 New/ Replace/

    Subsume

    Application 1 Application 2 Supported

    Application

    Interface Points?

    ADP Payroll MANMAN/GL Replace ADP Payroll Oracle GL Oracle: Journal

    Import Open I/F

    Note:Perform the approximate replacement mapping of the applications below. If developed in-

    application is the internal organization that developed the application, usually the IS organization.

    list of the application mapping, you should include the non-replaced applications, with a status of

    The intention of this analysis of replaced and retained applications is not to replace the rigorous a

    Existing Replacement

    Note:In the following table, if an existing integration point (interface) is going to need replacemen

    integration point as Replace. If you designate Subsume, this implies that application functions o

    contained within a single application in the new system. In some cases, it designates that we no

    is New, it has no counterpart in the existing system. The suggestion is that you only draw a distin

    supported interface does not exist. For example Oracle OE and AR have a supported interface

    applications map onto OE or AR - merely, that they map onto Oracle Applications. It depends on

    all the interface points in a complex ERP suite of applications like Oracle Applications would req

    Existing Integration Point Replacement Integration Point

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    13/17

    External Integration Point Diagram

    Note:Diagrams should be a mandatory component of this deliverable. They are the best means

    application map (and new interfaces required). The standards and the complexity of the implem

    working on will affect this diagram.

    ORACLE APPLICATIO

    Supplier andPerformance

    MSMBar

    La

    MFAR

    FYPLAN

    Excel

    MCORPSYSTEM

    AOP

    JournalExpenses

    Balances

    Corporate

    BalancesSheet

    MasterDemand

    Schedule

    Supplier and

    ProductConfig

    Payroll

    JournalEntries

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    14/17

    DRP and

    DemandForecast

    Payroll

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    15/17

    ouse, the vendor of the existing

    If you wish to create a complete

    Retained.

    nalysis of application usage

    t with another integration point between applications, designate the

    nce performed on either side of an application interface are now

    longer need the functions in the new system. If the integration point

    ction between application modules in the same suite where a vendor-

    oint so that you would not need to highlight whether the existing

    the level of detail you wish to include in your analysis. Documenting

    ire a lot of work.

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    16/17

    to convey the future

    ntation you are

    NS

    Codebels

    EDI

    Electronic Data

    Interchange Inbound

    Messages

    Electronic Data

    Interchange Outbound

    Messages

    InformationWarehouse

    Operational Data

    TRAFFICSYSTEMReceipts

    MPTS

    Balances and S/N's

    Engineering

    Change

    Orders

  • 7/29/2019 Tp Eng Rdrm 08 Business Requirements Mapping(Br.030)

    17/17

    EC System