Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement &...
Transcript of Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement &...
Town Municipal Council, Sidlaghatta
Public Disclosure Schedule
2013 - 2014
Manual on Public Disclosure Schedules
Content
Sl.no Particulars Page. no1 Urban planning including town planning 5-62 Regulation of Land- use and Construction of Buildings 7-83 Planning for Economic and Social development 94 Roads and Bridges 10-115 Water Supply- Domestic, Industrial and Commercial 12-146 Public Health, Sanitation, Conservancy and SWM 15-238 Urban forestry, protection of environment and ecology 24-2510 Slum Improvement & Up-gradation 26-2711 Urban Poverty Alleviation 28
12Provision of urban amenities and facilities- parks, gardens and playgrounds
29-30
13Promotion of cultural, educational, and aesthetic aspects
31
14Burials and burial grounds, cremations, cremation grounds and electric crematoriums
32
15 Cattle pounds, prevention of cruelty to animals 33
16Vital Statistics including registration of births and deaths
34-35
17Public amenities including street lighting, parking lots, bus stops and public conveniences
36-37
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
18 Regulation of slaughter houses and tanneries 38
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Formats for Disclosure
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Functions under 12th Schedule1. URBAN PLANNING INCLUDING TOWN PLANNING
Sl.No
Functions asper 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has tobe disclosed
Level of Disclosure (ULB/Ward)
Frequency ofDisclosure
Reference Remarks
1 Urban Planning including town Planning
1. Town Planning Authority
2. Urban Development Authority (UDA)
3. Municipal Planning Authority
(i) Report and Maps of Master Plans including Zoning Regulations
Plan in force now ULB 1. Annually2. To be notified as and when changes done
Table 1.1
(ii) Maps of Planning Districts
Plan in force now ULB 1. Annually2. To be notified as and when changes done
(iii) Details of provisional and finally approved layouts (Survey No, name of owner, Site details)
Previous three financial years including current year
ULB Half Yearly Table.1.2
4. ULB (iv) Report and maps of Comprehensive Development Plan (CDP)
Current plan ULB 1. Annually2. To be notified as and when changes done
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table 1.1: Report and Maps of Master Plans including Zoning Regulations(Please fill in following information)Sl.No
Name of the reports related to Master Plan, Zoning Regulation andCDP
Enclosure in PDF
Maps related to Master Plan, Zoning Regulations, Planning District and CDP
Enclosure in PDF
1 - Enclosure - Enclosure
2 - Enclosure - Enclosure
3 - Enclosure - Enclosure
Table 1.2: Number of provisional and final approved layouts(Please fill in following information)
Years Number of provisional layouts Number of approved layouts Details of layout as enclosure
Current year -2013-14 - - Enclosure as per the format
Current year 11-2012-13 - - Enclosure as per the format
Current year 1- 2011-12 - - Enclosure as per the format
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Format:
Details of Provisional and final approved layouts Sl. No Name of
LayoutWhether provisional/approved Number of sites in the approved layout Name of the
owner/developer of the layout30*40 40*60 Odd sites
1 - - - - - -
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGSSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency ofDisclosure
Reference Remarks
2 Regulation of Land- use and Construction of Buildings
UDA/ULB (i) Details of Building Commencement & Completion Certificate (Total application received, total permission granted, location details)
Previous three years including current year-2012-13
ULB Annually Table 2.1 (a)& Table.2.1 (b)
(ii) Details of Industries and commercial complexes approved (Survey No., Type, Name of the owner)
Previous three Financial years including current year-2013-14
ULB Annually Table 2.2
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table 2.1 (a): Details of Building Commencement & Completion CertificateTotal number of application received for building plan approval from past three years
Total number of License granted from past three years
2013-14 2012-13 2011-12 2013-14 2012-13 2011-12
45 30 50 36 28 42
Table 2.1 (b): Details of the building plan approval for three years
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Format for enclosure Ref Table 2.1.b
Table 2.2: Details of approved Industries/Commercial Areas
TMC, Sidlaghatta
2013-2014Enclosure
2012-2013 Enclosure
2011-2012 Enclosure
- -
Mention year
Site area(Sq/feet) Built-up area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number- - - - - -
Manual on Public Disclosure Schedules
2013-2014 Enclosure
2012-2013 NA
2011-2012 NA
Format reference to table 2.2
TMC, Sidlaghatta
Details Ward Number Street Name Survey Number Site Area(Sq/feet)
Built-up area (Sq/feet)
Owner name
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Details in enclosure
- - - - - -- - - - - - - - - - - - -
Manual on Public Disclosure Schedules
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENTSl.No
Functions as per12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has tobe disclosed
Level of Disclosure(ULB/Ward)
Frequencyof Disclosure
Reference
Remarks
3 Planning for Economic and Social development
ULB List and brief of the Social and Economic Development Schemes.-eg; 18% scheme, Ashraya and suchother Govt. programsDetails of budget allocation and expenditure of these schemesDetails of Beneficiaries
Previous three financial years including current year
ULB Annually Table 3.1
Table 3.1List and brief of the social and economic Development Schemes for three years
Current FY 2013-14
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% Scheme 40.25 16.10 Enclosure2 SJSRY 10.40 8.90 Enclosure3 Vajpayee - - Enclosure
Current FY-1 2012-13
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% Scheme 54.82 49.29 Enclosure2 SJSRY 12.53 10.74 Enclosure3 Vajpayee - - Enclosure
Current FY-2 2011-12
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% Scheme 51.43 36.43 Enclosure
2 SJSRY 11.94 11.85 Enclosure
3 Vajpayee - - Enclosure
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
4. ROADS & BRIDGES 2013-14
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
4 Roads and Bridges
ULBs & UDA (i) Total Road Length (type of road, its length and width)
Current status ULB/Ward Annually Table 4.1 MIS
(ii) Details of Roads proposed & executed forcarpeting/ re-carpeting.
Current year ULB Annually Table 4.2 (a) and 4.2 (b)
(iii) Percentage of footpath to the total roadlength of main roads
current status ULB Annually Table 4.3
Table 4.1: Road types
Total existing road length in kms
Water bound macadam
(WBM)
Bituminous Cement Concrete (CC) Mud road Total
- - 0.25KM - 0.25 KM
Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in 2013-2014 Year
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
(year to be mentioned numeric like 2010-11)
Type of road Total Road length approved and
tendered for carpeting in kms
Total Road length
approved and tendered for
re-carpeting in kmWater bound macadam (WBM) - -
Bituminous - -Cement Concrete (CC) 0.25 KM- 0.25 KM
Mud road - -Total 0.25 Km 0.25Km
Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in 2012-2013 year (year to be
mentioned numeric like 2010-11)
Format for enclosure reference table 4.2.b
Road length Approved and tendered for carpeting, WBM,
Bituminous and CC road (newly surfacing of the roads)
Road length Approved and Tendered for
re-carpeting, WBM, Bituminous and CC
TMC, Sidlaghatta
Type of road Total Road length
approved and tendered for
carpeting in kms
Total Road length approved and
tendered for re-carpeting in km
Water bound macadam (WBM) - Enclosure as per the format given belowBituminous
-Enclosure as per the format given below
Cement Concrete (CC) 0.3 km Enclosure as per the format given below
Mud road-
Enclosure as per the format given below
Manual on Public Disclosure Schedules
road
Type of road Ward Number Street Name Length of
road in Kms
Type of
Road
Ward
Number
Street Name Length of road
in Kms
- - - - - - - -
Table 4.3: Footpath coverage to main roads
Total length of the main roads in ULB Jurisdiction : 70 KM
Total length of the footpath built against main road : Nil
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIALSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
5 Water Supply- Domestic, Industrial and Commercial
Water Board/ ULB
(i) Percentage of total water supply (Surfaced, Underground and external source)
current status ULB Level Half yearly Table 5.1 SLB1
(ii)Total number of connection & percentage of Coverage (Household/ public stand posts/ Commercial and Industrial Connection), quantity of w/s
current status ULB Level Half yearly Table 5.2 SLB
(iii) Frequency and Timing for Water Supply.
current status ULB Level Half yearly Table 5.3 SLB
(iv) Quality of Water Supply(percentage of samples complied with the Water Act norms)
current status ULB Level Half yearly Table 5.4 SLB
(v) Cost Recovery in Water Supply Services (Revenue Generated per KL of water/Cost incurred per KL of Water Supplied)
Previous three financial years including current year
ULB Level Annually Table 5.5 SLB
(vi) Water tariff Current status ULB Level Annually Table 5.6
1
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Format 5.1 -Per capita production of water
Water supplied through Surface Source 5.13 in MLD Water Supplied through Underground Source --1.77----in MLD
Water supplied through external source - in MLD
Format 5.2- Water Supply Coverage
Total Number of Households -6900-- in numbers
Number of house holds with direct water supply connections ----2610----- in numbers
Total number of Public Stand Posts ------190---- in numbers Total number of industrial connections - in numbers
Format 5.3- frequency & Timings of water supply Frequency and Timing for Water Supply
Number of days of water supply per week in
Normal season
Number of hours of water supply on any supplied day (Normal
season)
5 Days 1 hr
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Format 5.4- Quality of water supply
Total number of water samples collected at the consumer end - in Numbers/6 months Number of water samples that meet potable water standards - in Numbers/6 months
Format 5.5- Cost recovery in water supply (same as in SLB)
TMC, Sidlaghatta
Expenditure1 Total contractual (if outsourced) cost for Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/ Jack well/ Intake well, valves, replacement of distribution network, supplying of spare materials, salaries of Contract labours, vehicles etc)
Current Year(2013-2014)
Current FY-1 (2012-13)
CurrentFY -2(2011-2012)
2 Total expenditure borne by ULB on Bore wells, O & M of piped network, O & M of vented dam/ Impounding structure/ Jack well/ Intake well, valves, replacement of distribution network, supplying of spare materials, vehicles etc
68.0 55.0 30.0
3 Salaries of employees under water supply (Permanent and Dailywages
9.34 81.18 15.02
4 Purchase of items (for water treatment, for pumping machinery and spare parts if any
- - -
5 Electricity Bill for water supply (Surface source and Ground water)
- - -
Revenue1 Amount collected out of current year demand 43.12 - -2 Amount collected for providing new connection 0.45 - -
Manual on Public Disclosure Schedules
Format 5.6- Water Tariff Water Tariff
Present water charges (which ever is applicable)
Flat rate ( mention the rate)
slab Rate (Mention the slab)
Rs.80/- per month for Residential Rs.160/- per month for Commercial
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENTSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
6 Public Health, Sanitation, Conservancy andSWM
ULBs/ Water Board/ UDA
(i) Street Sweeping (road wise street sweeping schedule)
Current status as per action plan
ULB/Ward Half Yearly
Table 6.(a).1 & 6.(a).2
SWM Action Plan
(ii) General statistics on Solid Waste Management (Generation quantity, Details of the Secondary Collection Points, landfill location, user fee)
current status ULB Annually Table 6.(a).3.1&6.(a).3.2
SWM MIB
(iii) Percentage of HH covered under Door-to-Door Collection
current status ULB Half Yearly
Table 6.(a).4
SLB and MIB
(iv) Percentage of households participating in segregation
current status ULB Half Yearly
Table6.(a).5
(v) Extent of Scientific treated and Disposal of MSW (%)
current status ULB Annually Table 6.(a).5
SLB and MIB
(vi) Cost recovery under SWM (Revenue generated per ton of SW/ Expenditure per ton of SWM (in Rs.))
Previous three financial years including current year
ULB Annually Table 6.(a).6
SLB
Sewerage & Drainage:
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
(vii) Percentage of coverage of UGD
current status ULB Annually Table 6.(b).1
SLB
(viii) Percentage of WasteWater Treated
current status ULB Annually Table 6.(b).2
SLB
(ix) Percentage of extent of reuse and recycle of treated waste water
current status ULB Annually Table 6.(b).3
SLB
(x) Cost recovery under UGD (Revenue generatedunder UGD/ Expenditure under UGD (in Rs.))
previous three financial years including current year
ULB Annually Table 6.(b).4
SLB
Storm Water Drains
(xi) Statistics of storm Water Drains ( location, length and its cleaning frequency)
current status ULB Annually Table 6.(c).1
(xii) % age roadside drains to road length ( Paved and unpaved)
current status ULB Annually Table 6.(c).2
SLB
(xiii) Incidences of Water Logging and Flooding (No.s of cases per year/ total number of identified points)
current status ULB Annually Table 6.(c).3
SLB
Public Health (if applicable)
(xiv) No of Municipal Hospitals and its location details
Current Status ULB Annually Table 6.(d).1.1And 1.2
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
(xv) Facilities available &OPD Timings
Current Status ULB Annually
(xvi) Number of cases of vector Born Diseases per 1000 population
ULB Annually Table 6.(d).2
(xvii) Number of cases of Water Born Diseases per 1000 population
Annually
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table 6(a).1 Private sector participation details for SWMPackage Number Scope of work Name of the
contractorContract period (dd/mm/yyyy to dd/mm/yyyy)
Contract value in Rs. In lakhs
- - - - -
Table 6(a).2Street Sweeping Schedule
Package number
ward number Road IDif available
Road name
Road lengthin Kms
Sun Mon Tue Wed Thu Fri Sat
01 1,2,3,4,5,6,7,8,9,10,11,15,20,14 A* type 7 Kms..…A type..…B type 12 Kms..…C type 20 Kms..…D type -..
Source: SWM Action Plan
Table 6(a).3.1
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Details Handled by SHG (No.s)
Handled by Service Provider, if applicable (No.s)
Handled by ULB (No.s)
Handled by RWA/NGO (No.s)
Non slum Household’s 7912 - - -
Slum Household’s Nill - - -commercial establishments 658 - - -
Bulk generators 06 - - -
Expected User fee generation (demand) No - - -
Table.6 (a) 3.2General statistics on Solid Waste ManagementTotal Quantity of waste generated in the city per day(TPD)
Total Quantity of waste Collected (TPD)
User fee Slab details enclosed
Resolution date passed from Council
Land fill location Number of secondary transportation vehicles under SWM
20 TPD 14 TPD - 12-01-2010 Hithala Halli 2
Secondary storage containers Location Map
Enclosure
Source: SWM Action Plan
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table 6(a).4Number of Households participating in segregation 5578 Households
Table 6(a).5 Scientific Disposal of MSW
Total waste collected & transported to disposal sites 14 tons/day
Total waste processed in scientific manner 4 tons/day
Table 6(a).6 Cost recovery under SWM in Rs Lakhs
Expenditure1. Salary of the employees under SWM 3.60
2 Total Contractual cost if outsourced under MSWM for hiring services, vehicles or equipments, O& M of vehicles, fuel cost, labour cost etc.
-
3 Total expenditure borne by ULB on SWM for O & of M vehicles, purchase of tools and equipments, insurance cost for vehicles, landfill management cost like tipping fee etc.
-
Revenue1 Total Revenue generated under SWM
Sewerage
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections …6900……… in Numbers
Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant 0.5 in MLD
Quantity of waste water treated 0.5 in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water -- in MLD (when mouse is moved on MLD then it
should show “million Liters per day”)
Table.6 (b) 4 Cost recoveries under UGD (Input screen)
Expenditure In Rs Lakhs 1. Electricity bill for sewage treatment plant2 Total salaries of ULB employees working in STP & UGD system 2.50
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items, repair and replacement of spares, labor cost etc.)
-
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and replacement of spares etc.)
-
Revenue1 Total revenue collected from UGD
-
Storm Water Drains
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table.6(c).1Statistics of storm water drains Name of major storm water drains Length in kms Cleaning frequency per annum
Settuguni Drain 0.8Bye pass Drain 1.2
Ashoka Raod Drain(Both sides) 1.2T.B.Raod(Both Sides) 1.4
2nd Karmik Nagar Main Road(Both Sides) 3.13rd Karmik Nagar Main Road(Both Sides) 3.1
Junior College Back Side 0.8Table.6 (c) 2Length of road side drains 59.3kms
Table.6 (c) 3Number of water logging and flooding cases per year in numbers 07
Total number of identified points in Numbers 03
Public Health to be filled by the ULBs if they are managing this function
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table 6 (d).1.1Public HealthName of the Municipal hospitals
Location details Detail of facilitiesNumber of beds
Number of staff
OPD2 Timings of the OPD
Lab Facility (yes/No)
Others if any
- - - - - - -Table 6(d). 1.2Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
- -
8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY
2 Out Patient department
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency ofDisclosure
Reference Remarks
8 Urban forestry, protection of environment and ecology
ULB Trees (if applicable)
(i) Number of tree cut/uprootedto the number of existing trees
current status
ULB Half Yearly Table 8.1
(ii) Number of sapling planted to the number of trees cut/uprooted to the number of existing trees
Current year ULB Half Yearly
Water bodies (if applicable)
(iii) Existing number, New Proposals for Revival of water bodies, budget and expenditure
current status
ULB Annual Table 8.2
Table.8.1 (To be filled by the ULBs if they are managing this function)
Urban forestry Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted
- - -
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table.8.2Protection of Environment and Ecology
Sl. No Name existing water bodies like lake, tanks, pond etc.
Proposed for revival in Yes/No Amount budgeted for revival in Rs.in lakhs
Expenditure metin Rs. in Lakhs
- - - - -Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned
10. SLUM IMPROVEMENT & UP-GRADATION
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
10 Slum Improvement & Up-gradation
ULB/UDA (i) Details on declaredand undeclared slums (numbers, location, number of households, population, area)
current status ULB/Ward Half yearly Table 10.1
(ii) Details of slum improvement schemes (schemes, slums benefited, budget and expenditure)
Previous three financial years including current year
ULB/Ward Half yearly Table 10.2.
(iii) Beneficiary list undereach scheme
current status ULB/Ward Half yearly Table 10.2
(iv) Status of Basic Services in Slums(a) No of connections - Water Supply & sanitation (% coverage)(b) Length of Roads and drains (paved and unpaved) (c) No and % of houses (pacca and katcha houses)
current status ULB/Ward Half yearly Table 10.3
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same)Details of declared slums Enclosure as per the format given BelowDetails of un declared slums Enclosure as per the format given Below
Format for enclosure as mentioned in table 10.1Details of declared and undeclared slums
Name of the slum Declared/ Undeclared
Extent in Sq. mt Population Number of Households
A.K. Colony Ward No.8
Declared 0.2 1300 525
A.K. Colony Ward No.9
Declared 0.2 1015 626
2nd Karmik Nagar Undeclared 0.15 798 450
Mehaboob Nagar Undeclared 0.18 777 387
1st Karmik Nagar Undeclared 0.2 648 390
Rehamath Nagar Undeclared 0.15 716 703
Ashraya Layout Undeclared 0.25 774 257
Nisar palya Undeclared 0.2 977 497
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
3rd Karmik Nagar Undeclared 0.14 883 622
Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)
Current YearName of the slum
Improvement SchemesTotal Number of Budget and under
each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosureSlums Beneficiaries
- - - enclosureCurrent Year – 1
Name of the slumImprovement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiariesenclosure
Current Year – 2Name of the slum
Improvement SchemesTotal Number of Budget and under
each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries
- - enclosure
Table 10.3 Basic Service status in Slums
Status of Basic services in Slums
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Total number ofhouseholds with
direct watersupply
connections(numeric)
Total numberof publictaps/mini
water cisterns(numeric)
Total lengthof roads
paved andunpaved in
Kms
Totalhouseholds
connected toUGD
(numeric)
Totallength of
roadside
drains inKms
Totalnumber ofHH with
individualtoilets
(numeric)
Number ofFunctionalCommunity
Toilets(numeric)
Total number ofpacca/kaccha
houses(numeric)
800 30 800
Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
11. URBAN POVERTY ALLEVIATIONSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
11 Urban Poverty Alleviation
ULBs /DMA/UDA
(i) Details of the UrbanPoverty Alleviation Schemes (eg. Components of SJSRY )
Current status ULB Annually Table 11.1
Table 11.1 Details of Urban Poverty Alleviation
Name of Schemesunder urban
poverty alleviation(multiple entries)
Budget for the schemes
Expenditure met for the scheme
Number of beneficiaries under the scheme
list of the beneficiaries to beenclosed
All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDSSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
12 Provision of urban amenities and facilities- parks, gardens and playgrounds
ULBs/UDAs Playground/ Parks/Gardens
(i) Percentage of area under parks and gardens to the total ULB area
Current status ULB Annually Table 12.1
(ii) Percentage of developed parks and gardens (%)
Current status ULB Annually Table 12.1
(iii) Number, Location, Area, Amenities, details of the maintaining agency
Current Status ULB Annually Table 12.2 (a) and 12.2 (b)
Table.12.1. Area reserved under Parks & Gardens
1. Total ULB area 5.0 in Sq.kms
2. Area reserved under Parks & Gardens 4372.93 Sq.meters
3. Area of developed parks and gardens 195.04 in sq. mts
Table.12.2 (a) Amenities under parks & Gardens
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Locations of the park
Park Area in sq. mt
Amenities available under each park (yes/no) Contact details of the Maintaining Agency
Children play area
Seating facility
Track for walking/jogging
Facility for exercise
Name Contact number(numeric)
2Nd TMCLayout
4177.89 No No No No - -
Municipal Park@ PumpHouse
ChintamaniRoad
195.04 Yes Yes Yes No TMCSidlaghatta
08158-254404
Table 12.3.(b) Play ground details Locations of the playgrounds
playground Area in sq. mt Contact details of the Maintaining Agency
NIL NIL -- --
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTSSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
13 Promotion of cultural, educational, and aesthetic aspects
ULBs (i) Details of Communityhalls, Cultural Centers, marriage halls, municipal educational institutes
Current Status ULB Annually Table 13.1 (a) and 13.1.(b)
(ii) Details of advertisement hoardings, rates, revenue generated
Current Status ULB Annually Table 13.2.1and 13.2.2
Table 13.1.a Details of cultural Centers
TMC, Sidlaghatta
Community halls/Auditorium DetailsName Address Booking office
address andcontact details
NIL NIL
Name of the Municipal Educational Institutes Number of teachers in eachmunicipal Educational Institutes(in
numbers)
NIL NIL
Manual on Public Disclosure Schedules
Table 13.1 (b) Details of educational institutes (only if applicable)
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardingsNumber of Hoardings Slab rates for
advertisement(As Enclosure)
Advertisement tax demand for the current year in Rs. inlakhs
Advertisement tax collected in the current year in Rs. in lakhs
2 5000 5000 5000
14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMSSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
14 Burials andburial grounds,cremations,cremationgrounds andelectriccrematoriums
ULBs (i) Numbers, type, Location of burial grounds and cremation facilities available, fee charged if any
Current Status ULB Annually Table 14.1 (a). and 14.1(b)
(ii) Details of facility of “Herse/ Corpse Vehicles”(number and contact details)
Current Status ULB Annually Table 14.2
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriumsDetails of Burial grounds, cremation grounds & electric crematoriums
Name of theCommunity
burial groundwith locations
Name andlocation of the
Crematoriums/Burial ground
Facilities available in the Crematoriums ( Yes / No)
Electric
Burning Burial Availability ofwood
Waterfacility
Cleaningfacility
Othersif any
Maintaining agency
Name Contactdetails
Multiple(entries)
1) Bypass Road No Yes Yes No Yes Yes No - -
2)Chintamani Road
No No Yes No No No No - -
3)Behind Pojamma Temple
No No Yes No No No No - -
4)Behind MUWSS
No No Yes No No No No - -
5)Behind Sewage treatment plant road
No No Yes No No No No - -
Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Enclosure- -
Table 14.2: Details of Hearse Vehicles
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
TMC, Sidlaghatta
Hearse/Corpse vehicle detailsNumber of hearse vehicles
availableFee details for the vehicle( in Rs)
Contact details to hire the vehicle
Maintaining agency
Contact Number Name Contact Number
- - - - -
Manual on Public Disclosure Schedules
15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALSSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
15 Cattle ponds, prevention of cruelty to animals
ULBs (i) Numbers of stray animals, vaccinated
Current Status ULB Annually Table 15.1 (a) and 15.1 (b)
(ii) List of ‘Kanji House’ (care centers for stray animals).
Current Status ULB Annually Table 15.1 (a)
Table.15.1.1 Details of stray animals (input & output screen are same)
Number of stray animals Number of stray dogs vaccinated
Location of Kanji House (care centers for Stray animals) if applicableDogs Cows Pig Others if applicable
- - - - - -
Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals As EnclosureList of Animal Welfare Association (if available) As EnclosureName and location of NGOs working for animal
welfare( if available)
As Enclosure
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHSSl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
16 Vital Statistics including registration of births and deaths
ULBs (i) General information pertaining to city (population, area, households etc.)
Current Status and recent censusdetails
ULB Annually Table 16.1 City website
(ii) List of citizen service centers with location
Current status ULB Annually Table 16.2
(iii) Total Births and Deaths recorded along with Birth and Death rates.
Current status ULB Half Yearly
Table 16.3
(iv) Citizen Charter to be published
Current status ULB Annually Table 16.4
Table 16.1: City General information as per recent census details (should be added in their respective ULB websiteCity General informationPresent population
Present area in sq.km
Total numberof households
Population density
Total male population
Total female population
Total SC/ST Population
Total Slum population
Literacy rate
51159 5.0 8835
Table 16.2: List of Citizen Service centersSl. No Address of the Citizen Service centers if applicable
enclosure
Table 16.3: Details of Birth & Death
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Total births recorded Total deaths recorded
Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below formatService Details Period of catering the
service
Procedure to
Apply
Officer inchargeDesignation Contact Number
Birth CertificateDeath certificate Property Tax ApplicationKhatha Certificate othersEnclosure if already citizen
charter being maintained
enclosure
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
17 Public amenities including street lighting, parking lots, bus stops and public conveniences
ULBs (i) number of street lights Current status ULB Annually Table 17.1 SLB
(ii) No. of Street Lights/ Km of Road Length (No.s)
Current status ULB Annually Table 17.1 SLB
(iv) Details of agency maintaining street lights (name and contact details)
Current status ULB Annually Table 17.2
(v) List of Authorized Parking Areas along with parking capacities and fee
Current status ULB Annually Table 17.3
(vi) Number and locationsof bus stops and public toilets (Community and commercial) with its user charge.
Current status ULB Annually Table 17.4
Table.17.1: Details of streetlightsTotal number of streetlights Types of streetlights with number
Tube light High Mast IncandescentCFL
Mercury vapor Sodium vapor
2523 405 9 800 0 680
TMC, Sidlaghatta
Manual on Public Disclosure Schedules
Table 17.2: Details of Agency Maintaining StreetlightPackage Number Wards Covered details of the agency Maintaining the streetlights
Name Phone Number
- - - -
Table.17.3: Details of Parking Lots Details of parking lots
Enclosure as per the format
FormatParking lot location Parking Capacity Fee Slab
Two wheeler
Four wheeler
Two wheeler
Four wheeler
- - - -
Table.17.4 Details of toilets
Table17.5: Details of Bus stop
TMC, Sidlaghatta
Public toilets Community Toilets
Location Fee slab Location Fee slab- - - -
Location of Bus stop( As Enclosure)
Area Address
Manual on Public Disclosure Schedules
18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES
Table.18.1 (a): list of Slaughter houses
Table 18.1 (b): Details of Slaughter House
TMC, Sidlaghatta
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
18 Regulation of slaughter houses and tanneries
ULBs (i) Number, Location of Slaughter House / Tanneries along with facilities available andcapacity
Current status ULB Annually Table 18.1(a) and (b)
Number of Slaughter Houses Functional
Number of slaughter houses Non functional
--
Location of the slaughter House
Whether the Slaughter house is been regulated by KSCB (Yes/No)
Capacity Number of animals slaughtered per week
FacilitiesWashing Medical
Examination
Removal of Waste
Others if any
- - - - - - - -