TRA – Total Room Automation
DESIGO V5
Arild Fossbakk: Head of support
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 2
DESIGO TRA
Total Room Automation
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 3
Total Room Automation TRA, covers important
Market Trends in Europe
Requirements in European non-residential buildings
Strong regulation to conserve energy
TRA will cover HVAC, Light, Blinds and
cross functions to reduce energy consumption
and improve comfort
Support of grid and multi-phase construction
Reduced life cycle costs of buildings
Flexible applications allow to add functions
and change room setup resulting in
lower life cycle costs
HV
AC
Lig
ht
Blin
ds
Cross discipline
functions
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 4
Total Room Automation
Topology
Engineering & Commissioning Tool
WEB based installer Tool
Modular Controller with onboard DALI
BACnet/IP communication
Existing and new room specific TX-IO
HVAC, Light, Blinds
PL-Link: plug&play pheripheral devices
- Room Units
- presence detectors, switches (LV devices)
- VAV controller, FanCoil I/O Box
- Supports KNX 3rd party devices
BACnet/IP
KNX devices
TX-IO PXC3..
LV devices
PL-Link
DESIGO V5
QMX3.. VAV FanCoil
I/O Box
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 5
Connect networked peripheral devices
in the room for HVAC, lighting, blinds
Reduced installation costs
self-powered, two wires (up to 64 devices)
Reduced engineering & commissioning costs
“plug & play”-“easy engineering”
1:1 replacement without tool
enhanced application functions and more
diagnostic information
Use of KNX S-Mode devices
Peripheral-Link (PL-Link)
Objective and Motivation
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 6
Modular Controller - PXC3 series
2-Port Ethernet Less IT infrastructure, cabling
Optional DALI on board Cost efficient light control
Internal power supply
for Dali, PL-Link and TX-IO
Reduced space, less cabling
Expandable for various field busses
and subsystems
Less engineering effort, less gateways,
open for future requirements
DALI
PL-Link
BACnet/IP
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 7
Interaction with Room User
RoomOptiControl: Cross discipline and intelligent linked
efficiency function automatically detects
unnecessary energy consumption in the room
Green Leaf Display:
Room runs energy optimized
Unnecessary energy use
Potential for energy-savings
By simply pressing the display returning to
optimal operating
DESIGO V5 – Total Room Automation TRA
The Room User saves Energy at the equal Comfort
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 8
Flush Room Unit
Operation Concepts ‘Scroll and Change’ and ‘4 Lines’
4 fixed lines, no menu
Limited functions
Simple and straight forward
1 key = 1 function
4 Lines
High flexibility, easy to cover
specific customer requirements
Bottom: scroll menu
Top: 1 key = 1 function
Scroll and Change
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 9
Green LEAF
to reduce Energy Consumption
Studies show that energy saving up to
25% can be reached when the room
user considering energy efficiency
Feed back to room occupant on
energy consumption
room runs energy optimized
potential for savings
Room occupant pushes red leaf
room is set to optimized
consumption
Involve the room user in the energy
efficiency process
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 10
Basic functionality – Leaf Color Display
Room user actions like
Operate blind Automatic
inactive
>250 W/m2
Open the window
30 min
Switch light on
>1200 Lux
>1200 Lux
Increase brightness
set point
>23°C
Increase room
temperature set point
Bypass to comfort
mode
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 11
Basic functionality – Single Click
Room user actions like
Open the window
30 min
>23°C
Increase room
temperature set point
>1200 Lux
Increase brightness
set point
Adjust room
temperature set point
Adjust brightness
set point
Bypass to comfort
mode AUTO
Return to automatic
operation mode
Switch light on
>1200 Lux
OFF Switch light off
if bright enough
Operate blind Automatic
inactive
>250 W/m2
AUTO Return to automatic
mode (e.g. thermal protection)
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 12
TX-IO Portfolio
TXM1.8T 8 Triacs (3 VA per output) for HVAC actuators
TXM1.6RL 6 bistable relay outputs for ON/OFF lighting control
(16 A circuit-breakers, high inrush)
TXM1.8RB 4 blind motors with 2 relays or 2 blind motors with 3 relays;
including detection of end positions with current measurement
Existing TX-IO Existing TX-IO blocks (DI, UI, …) are supported
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 13
Presence detector & Light sensor UP258/21
Bus transceiver module UP117, to integrate:
New LV push-buttons
UP587/1 3-fold push-button with text display
Push-button interface UP220/2
for conventional switches from all manufacturers
PL-Link Device Portfolio
VAV static
GLB
GDB
Fancoil IO module based on RXB
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 14
Total Room Automation
Application Overview
Building wide functions
Schedulers, Alarms
Sun position (location, date, time)
Shading calculation based on facade angles
Application Blocks
Room Coordination
Scene control
Green leaf functions
Energy optimizer light, blind , HVAC
Emergency control light, blind , HVAC
Light
Switched, dimmed
Constant light control
Blind, outdoor and indoor products
Local operation, restriction
Central operation
HVAC
Radiator water / El. heating
Under floor heating
Chilled ceiling 2 + 4 pipe
Chilled ceiling + heating
Chilled ceiling + ventilation
Fan coil 4 pipe, 3 stage / linear
VAV, reheat el / water, air quality
Scene
Burn – in function 100h for T5 FL
Switch off warning
Operation mode EN15232:
Automatic / manual on / off,
delayed off / dimmed off
Shading: fixed, tracking, glare
Energy optim: global radiation
Daylight harvesting
Protection of blinds: wind, rain, frost
Life safety: fire, cleaning mode
Weather station: sun, wind, rain, frost, global rad.
Supply chain coordination (room primary)
Room occupation and room mode
Day light coord. (light – blinds)
System Functions
Local trend w. notification
Grouping
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 16
Groups are used to control related equipment within a room, space, floor or building.
- A single switch can control a group of lights
- A single occupancy sensor can influence several spaces
- An entire façade can be controlled with a single command.
Grouping
Grouping of Occupancy Zones Grouping for Light Control Grouping for Blind Control
Building Technologies
Rolf A
bra
ch
, 4
88
1 /
10
29
72
-M-1
14
7
Siemens
Side 19
Teknisk systemintegrator - fullt ansvar for at alle grensesnitt fungerer i henhold til spesifikasjoner - på kundens vegne. Tekniske installasjoner i europeisk toppklasse sørger for betydelige besparelser for sykehuset, mens kvaliteten på pasientoppholdet løftes gjennom optimal styring av temperatur, lys og luft. Tett samhandling mellom byggherre, entreprenører og konsulenter. Energieffektivt
Kompetansepartner på flere typer bygg i Norge:
Helsebygg: St.Olavs Hospital i Trondheim