    Outline

    List ofFact(s)/Issu(e

    s)

    PossibleSolution(s)

    FocusProblem(s)

    Recommendation(s)

  • 7/23/2019 Toshiba: Ome Works

    3/15

    Background

    Began operate in 1968

    Produced : - Personal computers

    - PC Boards

    - Word processors- Hard disk drives

    - Optical character readers

    - Computer and communications system

    4 Catergory of employees: - Full time - Temporary- Part time - Affiliated

    2600 employees in 1995 : - 440 direct factory workers

    - 1050 design engineers

  • 7/23/2019 Toshiba: Ome Works

    4/15

    Fact/ Issue (1) Trouble in finishing the installation of floppy disk drive

    COMPETITION in notebook PC market was FIERCE/strong

    LIFETIME of a notebook model : 6 months MISSING crucial product cycle/ DELAYING introduce new product large LOSSES

    in market share

    PC assembly PROCESS :

    1) two 60-meter assembly conveyors 45 operators each

    2) three 27-meter lines 14 operators each

    3) three 14.4-meter lines 10 operators each (Exhibit 7)

    Total 7 PC assembly line :

    - 4 IDLE use only if demand increased)- 3 lines DAILY operation 1 overseas, 2 domestic market

    Previously, Ome produced 8 different models 6 different features COMBINATION

    each models

  • 7/23/2019 Toshiba: Ome Works

    5/15

    1995: SHORT LIFE TIME of each model

    - 300 units per line 3 to 10 different model per line per day

    - 504,000 units per yearASUMMPTION 7 lines used

    (7 lines) x (300 unit per line) x (20 daily lots) x (12 months)

    EACH PC model sequentially assembled

    EMPLOYEES on notebook assembly line in November 1995 :

    - 50% full-time,

    - 25% part-time,

    - 25% affiliated companies.

    Characterized word processor for Japanese market adjacent to PCnotebook assembly lines :

    - high product variety

    - low volume

    - no longer expanding.

    Fact/ Issue (2)

  • 7/23/2019 Toshiba: Ome Works

    6/15

    Exist. Ome`s PC assembly line process

    Word Processor

    Assembly

    R

    S/T

    Notebook

    Assembly(3 lines active,

    4 lines idle)

    PKG

    R

    S/

    T

    PKG

    Operator

    Conveyor Belt

    Parts

    Repair Area

    Pre Install software & test

    Racks for burn-in

    Packaging

    Pallets of finished Product

    Computer Displayed

  • 7/23/2019 Toshiba: Ome Works

    7/15

    Existing PC Assembly Line Process Flow Chart

    START

    Computer displayeddaily productionschedule

    1st operator laid outmajor component

    2nd operatorentered barcode

    Modelchanged?

    1st operator placecontainer of small

    parts on the blank

    space

    2nd operatorscanned the barcode

    The rest of operatorpick up the smallerpart they need onshelv above theirwork area

    NO

    YES

    Portable computer displayed theoperations realted to eachstation

    Snapping connector together or

    attaching parts with small screws

    HW

    test

    Shock-

    Test

    Burn-InDone

    shock test?

    NO

    YES

    Softwarepre-installed

    Packaging &placed on pallets

    EN

    D

    Note:

    1)Supporter per line to replace break operator or assist if problem occured.

    2)Supervisor, qulity assurance, Supporter and Repair worker often worked during

    early morning and late afternoon. The speed of conveyor also decreased during this time.

  • 7/23/2019 Toshiba: Ome Works

    8/15

    Focus Problem

    LIFETIME of a notebook model : 6 months Competitor can minimize production & sales cost, lower

    product price:

    *refer to Exhibit 2

    Technology appliance (e.g Notebook)create best on both

    quality assurance and after sales service is critical.

    1993 1994Market Share 10.8 % 13.8 %

    Unit 663 1,192

  • 7/23/2019 Toshiba: Ome Works

    9/15

    Solution(s)1) Improving INNOVATION of new model in design process

    with sufficient speed of time

    2) Increasing product demand improving itsMANUFACTURING PROCES increase speed of assemblyline + cutting production cost lower product price thancompetitor.

    3) Increasing QUALITY CONTROL of product & after salesservice

    4) Reduce the RESOURCES to process word processor productto improve capacity ofPC Notebook product.

    5) Creating system for DISTRIBUTING channel to reach biggermarket

  • 7/23/2019 Toshiba: Ome Works

    10/15

    Recommendation(s)1) Improving INNOVATION of new model in design process with sufficient

    speed of time

    2) Increasing product demand improving its MANUFACTURING PROCES

    increasing speed of assembly line + cutting production cost lower

    product price than competitor.3) Increasing QUALITY CONTROL of product and after sales service

    Analysis Process + Job Design + WorkMeasurement

  • 7/23/2019 Toshiba: Ome Works

    11/15

    ecommen at on

    Improving INNOVATION of new model

    Inside OUTSIDE

    INSIDE Outside

    CUSTOMER

    Hardware Type/Model ?

    Feature?

    Improving both of hardware andsoftware for adaption to market

    demand

  • 7/23/2019 Toshiba: Ome Works

    12/15

    ecommen a on

    Increasing production unit with low production cost (1)

    Increase quality controlling of product & after sales service

    No Scenario sort by Priority + -

    1. REGULAR worker to work additionalovertime

    (+) low cost(+) more responsible(+) skillfull

    (-) fatigue employee(-) short term(-) empty post

    2. Reevaluate the work load of the entireplant, SHIFTING worker intoassembly area

    (+) low cost(+) more responsible

    (-) empty post(-) short term(-) less skillfull

    3. Obtain help from AFFILIATEDcompanies

    (+) medium cost(+) more responsible

    (-) empty post(-) short term(-) training needed

    4. Hiring TEMPORARY or PART-TIMEworkers

    (+) long term (-) high cost(-) high risk(-) less responsible(-) unskill , training

    needed

    Table of Increasing Worker Scenario based on Strength & Weakness

  • 7/23/2019 Toshiba: Ome Works

    13/15

    Increasing production unit with low production cost (2)

    R

    S/T

    Notebook

    Assembly(3 lines active,

    4 lines idle)

    PKG

    R

    S/

    T

    PKG

    Operator

    Conveyor Belt

    Parts

    Repair Area

    Pre Install software & test

    Racks for burn-in

    Packaging

    Pallets of finished Product

    Computer Displayed

    1. NO EXTEND LINE : 3 op. + 4 idles

    possible COMBINATION ofincreasing worker is scenario

    2/3/4/ mix of them

    (refer table on previous slide)

    3. REDUCE S/T timeNo need toincrease worker, but INCREASE

    SKILL NEEDED for worker in thissection

    (refer to table on exhibit 1)

    2. EXTEND LINE : operate > 3 op.

    possible COMBINATION ofincreasing worker is scenario

    1/2/3/4/mix of them

    (refer table on previous slide)

    4. Improving TECHNOLOGY

    on assembling line in order

    to improve manufacturing

    process

  • 7/23/2019 Toshiba: Ome Works

    14/15

    Increasing QUALITY ASSURANCE of product & AFTER SALES service

    START

    Computer displayeddaily productionschedule

    1st operator laid outmajor component

    2nd operatorentered barcode

    Modelchanged?

    1st operator placecontainer of small

    parts on the blank

    space

    2nd operatorscanned the barcode

    The rest of operatorpick up the smallerpart they need onshelv above theirwork area

    NO

    YES

    Portable computer displayed theoperations realted to eachstation

    Snapping connector together or

    attaching parts with small screws

    HW

    test

    Shock-TestBurn-InDone

    shock test?

    NO

    YESFinal Quality

    TestPackaging &placed on pallets

    STOP2) increase step in QUALITY CONTROL section before packaging(Shock Check, HW Check, SW Pre Installed Check) increase worker

    Softwarepre-installed3) After Sales Service: FAST service

    assure AVAILABILITY ofsensitive spare part on outlet (eg.Floopy disk drive, hardisk drive,

    LCD, keyboard & mouse)

    1) Developing INDIVIDUAL SKILL of employees directed to

    specific characteristic of product

  • 7/23/2019 Toshiba: Ome Works