Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di...

10
Anna Osello Cambiamo per cambiare Torino, 25 maggio 2016

Transcript of Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di...

Page 1: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Anna Osello

Cambiamo per cambiare

Torino, 25 maggio 2016

Page 2: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

Page 3: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

The information comes from

separate documents

The information comes from the database

DRAWING CAD BIM - DIM

interoperability

tradition innovation Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

Page 4: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Where we are

wall

CAD 2D

CAD 3D

BIM

CAD has fundamentally changed the way drawing is done.

BIM is drastically changing the way design is done.

The model becomes the source of the data for several disciplines involved in the AEC process.

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

Page 5: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Starting point: Building Information Model

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

LOD Information

Page 6: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Focusing attention on BIM for FM

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

Page 7: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

Research and development Validation of results

DIMMER (EU – FP7) – from BIM to DIM

EEB (MIUR – Smart Cities) – BIM for Energy Efficiency

BHIMM (MIUR – PRIN) – BIM for Cultural Heritage

Regione Piemonte – BIM for As-Built (offices)

Reale Group – BIM for As-Built (offices)

Città di Torino – BIM for FM and Energy Efficiency (offices, schools, …)

CRF – BIM for Energy Efficiency (industries)

FONTANAtelier – BIM for Construction Management (hospital)

Research/Teaching/Thesis

Page 8: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Where we are going

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

Page 9: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Next step: infraBIM

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

Page 10: Torino, 25 maggio 2016 - Casa Portale · Reale Group – BIM for As-Built (offices) Città di Torino – BIM for FM and Energy Efficiency (offices, schools, ... Presentazione standard

Thank you very much for your attention

Tradition and innovation

CAD versus BIM

Interoperability

Conclusion

[email protected] www.drawingtothefuture.polito.it