TOP HAT SUN GOD - BATCHING SHEET - Top Hat Provisions · Title: Microsoft Word - TOP HAT SUN GOD -...
Transcript of TOP HAT SUN GOD - BATCHING SHEET - Top Hat Provisions · Title: Microsoft Word - TOP HAT SUN GOD -...
BATCHING INSTRUCTIONS FOR A 5-‐GAL KEG OF TOP HAT SUN GOD
1. PROPERLY RINSE A 5-‐GAL CORNELIUS KEG WITH HOT WATER & ADD:
2. FORMULA:
GIN – 5 LITERS
ST. GERMAIN ELDERFLOWER – 1 btl
LILLET BLANC – 2 btl
TOP HAT DAISY – 3 LITERS
STRAINED CUCUMBER JUICE – 3 QTS
COLD WATER – 7 QTS
CLOSE PROPERLY & SHAKE VIGOROUSLY UPSIDE DOWN AND SIDEWAYS FOR 1 FULL MINUTE
FOLLOW THE STEPS BELOW TO FORCE CARBONATE & CONNECT THE KEG TO YOUR DRAFT SYSTEM
3. CLOSE LID CAREFULLY & TIGHTLY…MAKING SURE THAT THE OVAL SEAL LINES UP PERFECTLY WITH
THE ENTIRE METAL RIM OF THE KEG. SHAKE THE KEG WELL UPSIDE DOWN AND SIDEWAYS AND
MAKE SURE IT IS SEALED.
4. PLUG THE BLACK CONNECTOR FROM THE CHARGING STATION INTO THE “OUT” PLUG
5. QUICKLY TUG UP ON THE PRESSURE RELEASE RING QUICKLY AND RELEASE QUICKLY FIRST 15-‐20
TIMES IN A ROW
6. BOUNCE THE KEG LIGHTLY ON THE GROUND & REPEAT THIS PROCESS OF PULLING THE RING 15-‐20
TIMES AND BOUNCING THE KEG FOR FIVE CYCLES (BOUNCING IN BETWEEN EACH 15 PULLS)
7. REMOVE THE KEG FROM THE CHARGING STATION AND TURN IT OFF
8. WALK THE KEG OVER TO IT’S PROPER CONNECTION IN THE COOLER & CONNECT THE CLEARLY
LABELED GRAY/SILVER CONNECTOR MARKED “GAS/IN” TO THE “IN” PLUG ON THE KEG & PLUG THE
PROPERLY MARKED FLUID CONNECTOR TO THE “OUT” PLUG ON THE KEG
9. EQUALIZE PRESSURE BY PULLING UP ON PRESSURE RELEASE RING TWICE
10. READY FOR SERVICE (TASTE A TINY POUR FOR CONSISTENCY)
11. PLEASE FOLLOW THESE INSTRUCTIONS VERY VERY CAREFULLY & DO NOT SKIP ANY STEPS
FOR SERVICE & ORDERS CALL 415-902-7821 OR
EMAIL US AT [email protected]