Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

13
Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

description

Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012. TFS Long Range Facilities Plan. Org Chart. CPS. ARSLS Management (Mike Mc). Alaska Ops (Marin). Facilities Management (Jud). TFS Ops Manager (Mike A). Alaska Science (Naomi). - PowerPoint PPT Presentation

Transcript of Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

Page 1: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

Toolik Field Station

Long Range Facilities Plan

Science Support Vision Workshop

August 2012

Page 2: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

2

Facilities Management

(Jud)

Construction Management

(Jay B)

Engineering (Jeff S)

Maintenance Lead

(Thom M)

IT/Comms(SRI)

Toolik Construction

(Jason N)

ARSLS Management

(Mike Mc)

Alaska Ops(Marin)

Alaska Science(Naomi)

TFS Ops Manager(Mike A)

Renewables(Tracy D)

TFS Maintenance(Jeb / Faye)

CPS Org Chart

Page 3: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

3

LRFP Timeline and Status• In development since 2009

• Draft Final document distributed 2011

• Feedback received from stakeholders

• Final review/approval underway

• A “Living Document”, revised as necessary in the future

Page 4: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

4

Why “Finalize” the LRFP?• Environmental Assessment (EA)required for

new construction

• EA must reference a comprehensive document for site development (eg – LRFP)

• Planning and funding for large capital projects requires long lead times

• Demonstrates a strategic vision and plan in the event new funding comes available

Page 5: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

5

Capital Project Categories• Residential• Dorm• Bungalow

• Science• Laboratories• Lecture Hall• Workshop

• Site/Support Infrastructure• Garage • Generator Waste Heat Recovery• Road Lift/Realignment

Page 6: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

6

Capital Project Approach• Residential• Dorm New Construction• Bungalow New Construction

• Science• Laboratories New Construction• Lecture Hall• Workshop

• Site/Support Infrastructure• Garage New Construction• Generator Waste Heat Recovery New Construction• Road Lift/Realignment New Construction

Page 7: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

7

Capital Project Approach• Residential• Dorm New Construction• Bungalow New Construction

• Science• Laboratories New Construction• Lecture Hall Repurposed Facilities• Workshop Repurposed Facilities

• Site/Support Infrastructure• Garage New Construction• Generator Waste Heat Recovery New Construction• Road Lift/Realignment New Construction

Page 8: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

8

Science Wrkshp

Repurposed

New

Page 9: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

9

Initial Capital Projects• Dorm A• Two-story. Two wings. 24 rooms per wing. Total of 48

rooms. Two bed spaces per room = 96 potential bed spaces. Year-round capable

• Central common areas (core) on both floors• Garage• 3-bay. 2300 ft2. Year-round.

• Lab• Requirements still to be defined

• Waste Heat Recovery• Generator waste heat used for Garage heating

Page 10: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

10

Dorm

Page 11: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

11

Garage

Page 12: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

12

Bungalow

Page 13: Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

TFS Long Range Facilities Plan

13

Initial Capital Project TimelineProject 2012 2013 2014 Beyond

Dorm A

Garage

Lab 0

Waste Heat Recovery

DesignSite Prep Construction

Design

Construction

DesignSite Prep Construction

Design Complete

Construction

Bungalow

Lab 8