SOLUTION ON THE CONTAMINATION PROBLEM SOLUTION ON THE CONTAMINATION PROBLEM IN THE VELIKI BAIN THE VELIKI BAČKI KANALČKI KANAL
Tomislav Djivuljskij, Engineering Department HeadTomislav Djivuljskij, Engineering Department Head Public Company “Directorate for Construction” VrbasPublic Company “Directorate for Construction” Vrbas
Serbia DREPR Project – REGIONAL CONFERENCE Serbia DREPR Project – REGIONAL CONFERENCE 2010. 2010.
![Page 2: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/2.jpg)
VELIKI BAČKI KANALVELIKI BAČKI KANAL
![Page 3: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/3.jpg)
КАРАКТЕРИСТИКЕ ВЕЛИКОГ БАЧКОГ КАНАЛАКАРАКТЕРИСТИКЕ ВЕЛИКОГ БАЧКОГ КАНАЛА
СПАЈА ДУНАВ И ТИСУ
•ДУЖИНА У СРЕДЊОЈ БАЧКОЈ ЈЕ 118 КМ•ПЕРИОДИ ЕКСПЛОАТАЦИЈЕ ВАЖНИ ЗА РЕЖИМ ВОДЕ:период високог водостаја у Дунаву близу Безданапериод одбране од поплавапериод без протокапериод производње шећера
![Page 4: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/4.jpg)
SLAVNI REKORDISLAVNI REKORDI
GRAĐEN OD 1793 – 1802 g GRAĐEN OD 1793 – 1802 g NAJSKUPLJI PRIVREDNI OBJEKAT AUSTRO-UGARSKE CAREVINENAJSKUPLJI PRIVREDNI OBJEKAT AUSTRO-UGARSKE CAREVINE UTROŠENO 3,062.690 ForintiUTROŠENO 3,062.690 Forinti PROKOPAVAN JE RUČNO UZ ANGAŽOVANJE 3.000 RADNIKAPROKOPAVAN JE RUČNO UZ ANGAŽOVANJE 3.000 RADNIKA ISKOPANA JE KOLIČINA ZEMLJE RAVNA ISKOPU SUECKOG KANALAISKOPANA JE KOLIČINA ZEMLJE RAVNA ISKOPU SUECKOG KANALA KANAL JE NA DNU ŠIROK 17 m, A NA POVRŠINI 23 – 25 mKANAL JE NA DNU ŠIROK 17 m, A NA POVRŠINI 23 – 25 m IZGRAĐEN JE PUTEM KONCESIJE – GRADITELJI SU DOBILI IZGRAĐEN JE PUTEM KONCESIJE – GRADITELJI SU DOBILI
EKSKLUZIVNO PRAVO PREVOZA SOLI IZ RUMUNIJE NA BEČKI DVOREKSKLUZIVNO PRAVO PREVOZA SOLI IZ RUMUNIJE NA BEČKI DVOR KANAL JE VIŠENAMENSKI – SLUŽI ZA ODVODNJAVANJE, PLOVIDBU I KANAL JE VIŠENAMENSKI – SLUŽI ZA ODVODNJAVANJE, PLOVIDBU I
NAVODNJAVANJENAVODNJAVANJE VELIKI BAČKI KANAL JE OKOSNICA 1972.g DOVRŠENOG VELIKI BAČKI KANAL JE OKOSNICA 1972.g DOVRŠENOG
HIDROSISTEMA DUNAV – TISA – DUNAV, NAJVEĆEG U EVROPIHIDROSISTEMA DUNAV – TISA – DUNAV, NAJVEĆEG U EVROPI
![Page 5: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/5.jpg)
ХС ДУНАВ- ТИСА- ДУНАВХС ДУНАВ- ТИСА- ДУНАВ
један од један од највећих у највећих у Eвропи и Eвропи и један од један од најзначајнијнајзначајнијих у их у светским светским размерама.размерама.
![Page 6: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/6.jpg)
NESLAVNI REKORDINESLAVNI REKORDI
VELIKI BAČKI KANALVELIKI BAČKI KANALNAJZAGAĐENIJI VODOTOK U NAJZAGAĐENIJI VODOTOK U
EVROPIEVROPI
![Page 7: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/7.jpg)
DANUBE POLLUTION REDUCTION DANUBE POLLUTION REDUCTION PROGRAMMEPROGRAMME
NATIONAL REVIEWS 1998NATIONAL REVIEWS 1998
Federal Republic of YugoslaviaFederal Republic of Yugoslavia
UNDP/GEF AssistanceUNDP/GEF Assistance
![Page 8: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/8.jpg)
AGRICULTURAL HOT SPOTSAGRICULTURAL HOT SPOTS
![Page 9: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/9.jpg)
![Page 10: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/10.jpg)
INDUSTRIAL HOT SPOTSINDUSTRIAL HOT SPOTS
![Page 11: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/11.jpg)
![Page 12: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/12.jpg)
MUNICIPAL HOT SPOTSMUNICIPAL HOT SPOTS
![Page 13: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/13.jpg)
![Page 14: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/14.jpg)
NIVA REPORT 2004 - 2006NIVA REPORT 2004 - 2006
![Page 15: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/15.jpg)
DEKONTA REPORT 2005 - 2006 DEKONTA REPORT 2005 - 2006
![Page 16: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/16.jpg)
REVITALIZACIJA REVITALIZACIJA VELIKOG BAČKOG VELIKOG BAČKOG KANALAKANALA
![Page 17: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/17.jpg)
KOMPONENTE PROJEKTAKOMPONENTE PROJEKTA
SAKUPLJANJE OTPADNIH VODA ( Magistralni SAKUPLJANJE OTPADNIH VODA ( Magistralni kolektorkolektor; ; KasnalizacijaKasnalizacija: Vrbas , Kula , : Vrbas , Kula , Crvenka i 5 sela opCrvenka i 5 sela opštine Vrbasštine Vrbas
CENTRALNO POSTROJENJE ZA PREČIŠĆAVANJE CENTRALNO POSTROJENJE ZA PREČIŠĆAVANJE OTPADNIH VODA – CPPOV VRBASA i KULE OTPADNIH VODA – CPPOV VRBASA i KULE KAPACITETA 120.000 ESKAPACITETA 120.000 ES
IZMULJEMJE I REMEDIJACIJA VELIKOG BAČKOG IZMULJEMJE I REMEDIJACIJA VELIKOG BAČKOG KANALA – od prevodnice KANALA – od prevodnice “VRBAS” do “VRBAS” do “TRIANGLA” “TRIANGLA” u dužini od 6 km u dužini od 6 km
![Page 18: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/18.jpg)
![Page 19: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/19.jpg)
PROJEKTI U FAZI REALIZACIJEPROJEKTI U FAZI REALIZACIJE
1.1. Sistem za evakuaciju i prečišćavanje Sistem za evakuaciju i prečišćavanje otpadnih voda naselja u Opštini Vrbas otpadnih voda naselja u Opštini Vrbas 2007 – 20 2007 – 201111
2.2. Magistralni kolektor V Faza 2010-2011 Magistralni kolektor V Faza 2010-2011
3.3. CPPOV Vrbasa i Kule 2011 - 2012CPPOV Vrbasa i Kule 2011 - 2012
![Page 20: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/20.jpg)
KANALIZACIONA MREZA U NASELJIMA OPŠTINE VRBASKANALIZACIONA MREZA U NASELJIMA OPŠTINE VRBAS
![Page 21: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/21.jpg)
Izgradnja IV i V faze magistralnog kolektoraIzgradnja IV i V faze magistralnog kolektora
Revitalizacija Velikog Bačkog Kanala
![Page 22: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/22.jpg)
CPPOV Vrbas - KulaCPPOV Vrbas - Kula
Kapacitet Kapacitet 120.000 ES120.000 ES Organsko optereOrgansko opterećenje ćenje 7.500 kg BPK5/dan7.500 kg BPK5/dan Hidrauličko opterećenje Hidrauličko opterećenje 23.730 m3/dan 23.730 m3/dan Propisan kvalitet vode nakon tretmana:Propisan kvalitet vode nakon tretmana: BPK5 max 20 mg/lBPK5 max 20 mg/l SM max 30 mg/lSM max 30 mg/l Ntot maxNtot max 10 mg/l 10 mg/l Ptot maxPtot max 1 mg/l 1 mg/l
Revitalizacija Velikog Bačkog Kanala
![Page 23: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/23.jpg)
SNOWBALLSNOWBALL
SNOWBALL STARTED SNOWBALL STARTED ROLLING GETTING ROLLING GETTING BIGGER AND TAKES BIGGER AND TAKES EVERYTHING INSIDEEVERYTHING INSIDE
![Page 24: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/24.jpg)
ČIŠĆENJE MULJA I REVITALIZACIJA ČIŠĆENJE MULJA I REVITALIZACIJA VELIKOG BAČKOG KANALAVELIKOG BAČKOG KANALA
2010 g2010 g
![Page 25: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/25.jpg)
Project Project Site - Grand Canal, Site - Grand Canal, VrbasVrbas
![Page 26: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/26.jpg)
Sludge sediment excavation and pre-Sludge sediment excavation and pre-treatmenttreatment
1) Excavation (floating dredger / suck-pump dredger))
2) Dewatering (passive approach)
3) Sampling and selection of an appropriate technology- collect at least 3 samples from each 10 000 tones
- define contamination character
The samples should be analysed for priority pollutants:- Petroleum hydrocarbons (C10-C40)- PCBs- Heavy metals- Content of coliform bacteria (ecotoxicity)
![Page 27: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/27.jpg)
1) Treatment of sediments contaminated only 1) Treatment of sediments contaminated only microbiallymicrobially
- chemical hygienisation is a method which is economically more advantageous, and therefore commendable for sludge sediment treatment (compare to composting / thermal hygienisation)
- mixing with 3 wt% of quicklime is proposed
![Page 28: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/28.jpg)
2) Treatment of sediments contaminated by petroleum 2) Treatment of sediments contaminated by petroleum hydocarbonshydocarbons
- treatment of the most contaminated parts (TPHs between 2,000 ppm – 5,000 ppm) can be completed in two years (seasons)
- treatment of less contaminated parts (TPHs concentration below 2,000 ppm) can completed in one year season
Contaminated material
Decontaminated material
bacterial mixture lyofilizate
reinoculation on slant agar
cultivation on specific media
inoculum for bioreactor
cultivation in bioreactor
addition of minerals, aeration, heating
final bioculture
Material in remediation process
minerals+ additives cultivation,
moistening+ inert
material
Periodic operation during biotechnology process
![Page 29: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/29.jpg)
3) Treatment of sediments contaminated by heavy 3) Treatment of sediments contaminated by heavy metalsmetals
we propose to to install a mobile S/S unit in the vicinity of dewatering basins (minimization the influence on environment)
The stabilisation product will be disposed onto the interdepony (approximately 2 weeks) and afterwards transported at non-hazardous waste landfill
2 mixing units will run simultaneously, with a total treatment capacity of approx. 200 tons of sediment per day (treatment completed in two years)
![Page 30: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/30.jpg)
CILJCILJ: : VELIKI BAČKI KANAL 201VELIKI BAČKI KANAL 2015.5.
![Page 31: Tomo Drepr Regional Final](https://reader036.fdocuments.net/reader036/viewer/2022062711/55c03460bb61ebb2368b4591/html5/thumbnails/31.jpg)
НАМЕНЕ И УПРАВЉАЊЕ КАНАЛОМНАМЕНЕ И УПРАВЉАЊЕ КАНАЛОМ
•ОДВОДЊАВАЊЕ
•НАВОДЊАВАЊЕ
•СНАДБЕВАЊЕ ВОДОМ
•РЕЦИПИЈЕНТ ЗА ОТПАДНЕ ВОДЕ
•РЕЧНИ САОБРАЋАЈ
•УЗГОЈ РИБЕ
•ТУРИЗАМ И РЕКРЕАЦИЈА