TÜPRAŞ Residuum Upgrading Project (RUP)
Delayed Coker Unit (DCU)
XX.05.2019
Onur Aka
Process Superintendent
![Page 2: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/2.jpg)
2
Başlık
2
➢ TUPRAS General Information
➢ RUP General Information
➢ RUP Delayed Coker Unit
➢ Issues Encountered During Precommissioning/Commissioning/Operation
➢ Recommendations
Agenda
![Page 3: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/3.jpg)
3
Başlık
3
TUPRAS General Information
![Page 4: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/4.jpg)
4
Başlık
4
Tüpraş Residuum Upgrading Project (Scope)
➢ Delayed Coker Unit (8,200 m3/d), Foster Wheeler USA
➢ Integrated Unicracking Process Unit (8,800/4,000/1,300 m3/d), UOP
➢ Vacuum Distillation Unit (8,500 m3/d), Shell Global Solutions
➢ Hydrogen Production Unit (160,000 Nm3/h), Technip
➢ Sulphur Recovery Units (420 ton/d, 2 trains), Jacobs
➢ Amine Regeneration Unit (2 trains),
➢ Sour Water Stripping Unit (2 trains),
➢ Cooling Water Systems,
➢ Flare,
➢ Co-generation System (120 MW ISO), GE+Aalborg
➢ Tank Farm (23 tanks, 665,000 m3)
➢ Waste Water Treatment Unit (12,000 m3/d),
➢ Jetty Terminal
➢ GARE Station4
![Page 5: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/5.jpg)
5
Başlık
5
➢ Total Investment Cost: ~ 3 Billion$
➢ Increase in TUPRAS EBIDTA: 550 Million$/yr
➢ Decrease in Trade Balance Deficit of Turkey:1 Billion$/yr
➢ TUPRAS Refineries Capacity Utilisation: %75-80 →%100 (Actual ~%105)
➢ Nelson Complexity Index of İzmit Refinery: 7.78 → 14.5
RUP Financial Figures
![Page 6: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/6.jpg)
6
Başlık
6
Capacity Utilisation
![Page 7: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/7.jpg)
7
Başlık
7
RUP Brief Process Flow Diagram
Vacuum
Distillation
(8,500m3/d)
Hydrogen Production Unit
(160,000 Nm3/h)
Integrated
Unicracking
Process Unit
(8,800/4,000/
1,300 m3/d)
Delayed
Coker Unit
(8,200m3/d)
LPG
Light Naphtha
Heavy Naphtha
Jet Fuel
Diesel
Hydrocracker Bottom
LVGO
LPG
Coker Naphtha
Light Coker Gas Oil
Heavy Coker Gas Oil
Petroleum Coke
Atmospheric
Residue
Vacuum Residue
Natural
Gas Hydrogen
HVGO
Vacuum Residue
Fuel Gas
Fuel Gas
![Page 8: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/8.jpg)
8
Başlık
8
RUP Delayed Coker Unit
➢ Licensor: Foster Wheeler USA
➢ SYDEC Process (Selective Yield Delayed Coking)
➢ Capacity: 51.578 BPSD
➢ Furnace Outlet Temperature: 925-9400F
➢ Coke Drum Pressure:15 Psig
➢ Coke Drum Vapor Temperature: 810-8250F
➢ Throughput Ratio: 1.07
![Page 9: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/9.jpg)
9
Başlık
9
Technology Partners (Vendors)
➢ Furnace: FW Fired Heater Division (FWFHD)
➢ Coke Drums: Sumitomo Heavy Industries
➢ Coke Cutting System: Flowserve
➢ Unheading System: DeltaValve
➢ Coke Handling: Taimweser and McLanahan
➢ DCS/ESD/Fire&Gas Systems: Yokogawa
➢ Main Contactor: Tecnicas Reunidas
➢ Subcontractor: Tekfen İnşaat
![Page 10: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/10.jpg)
10
Başlık
10
➢ Fractionator Bottoms Revisions
Issues Encountered - 1
➢ Coke Drum&Critical Piping Const. Review
![Page 11: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/11.jpg)
11
Başlık
11
Issues Encountered-2
➢ Coke Drum Quench&Antifoam Nozzles Installation
➢ Coke Drum Insulation Revision
![Page 12: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/12.jpg)
12
Başlık
12
➢ Coke Pit Dewatering Problem
Issues Encountered - 3
➢ What was wrong?
![Page 13: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/13.jpg)
13
Başlık
13
➢ Coke Chute Support Damage
Issues Encountered - 4
➢ What happened?
➢ What was wrong?
![Page 14: TÜPRAŞ Residuum Upgrading Project (RUP) · 2019-04-04 · Nelson Complexity Index of İzmit Refinery: 7.78 →14.5 RUP Financial Figures. 6 CapacityBaşlık Utilisation. 7 Başlık](https://reader034.fdocuments.net/reader034/viewer/2022042113/5e8f7390263af662096d7387/html5/thumbnails/14.jpg)
14
Başlık
14
Recommendations
➢ Consider all activities related with Coke Structure as priority
➢ Consider Lube oil and hydraulic oil flushing as long lead items
➢ Extensive Classroom and Onsite Training for operators is mandatory
➢ All construction teams should be aware of expected movement of coke
drums and overhead piping