Today’s (12.7) Report. LIU Qian. East EC is ready, we are going to install the EC TOF next Monday. Move the main bundles. The common end is protected. By TOF Tricycle . The breakout is protected. The upper distribution box. The main bundle. New position, Direction: west to east - PowerPoint PPT Presentation

Transcript of Today’s (12.7) Report

Page 1: Today’s (12.7)  Report

Today’s (12.7) Report

LIU Qian

Page 2: Today’s (12.7)  Report

East EC is ready, we are going to install the EC TOF next Monday.

Page 3: Today’s (12.7)  Report

Move the main bundles

The breakout is protected

The common end is protected

By TOF Tricycle

Page 4: Today’s (12.7)  Report

The upper distribution boxThe main bundle

New position,Direction: west to east(safer, and easier to connect with fibers)

Old position,Direction: North to south

The extra length of fibers areover-under coiled.

Page 5: Today’s (12.7)  Report

Close look of fiber management

Page 6: Today’s (12.7)  Report

The fibers’ heads

They are all hidden in the shelter.

Page 7: Today’s (12.7)  Report

The rack

Moon box

UH Module

Height: 1.20 m

The ruler starts from 1.50 m

Height: 1.60 m

Page 8: Today’s (12.7)  Report

Common end

The common end of east.

We didn’t remove the protective tube yet.

Page 9: Today’s (12.7)  Report

Conclusion• We only finished the 12 bundles installation. (since the

people who helped me install the fibers are employed temporarily, for now only one IHEP employee and I are installing the bundles. But that’s OK, since we don’t want to push it in a hurry.)

• The bottom box has been installed. We’ll try to finish the rest bundles in this weekend.

• Next Monday we’ll begin to install the EC TOF of east side.