Today we will…

12
MaxEva workshop How to use the database MaxEva for - planning, - data sampling, - benchmarking of MM project Pernilla Hyllenius, Trivector Traffic together with Hanna Wennberg and Paulina Eriksson

description

MaxEva workshop H ow to use the database MaxEva for - planning, - data sampling, - benchmarking of MM project Pernilla Hyllenius, Trivector Traffic together with Hanna Wennberg and Paulina Eriksson. Today we will…. have an introduction of MaxSumo have an introduction of MaxEva - PowerPoint PPT Presentation

Transcript of Today we will…

Page 1: Today we will…

MaxEva workshop

How to use the database MaxEva for- planning, - data sampling,- benchmarking of MM project

Pernilla Hyllenius, Trivector Traffictogether with Hanna Wennberg and Paulina Eriksson

Page 2: Today we will…

Today we will…- have an introduction of MaxSumo- have an introduction of MaxEva- have a real case application (Bromley Travel Plan) where you learn how to:

- register a project

- enter data

- have an overview of obtained results

- use MaxEva for benchmarking

2

Page 3: Today we will…

A long history…- 2002: MOST-MET

- 2004: SUMO Swedish standard evaluation tool for MM- 2008: SARA Swedish database built on SUMO- 2009: MaxSumo European standard evaluation tool for MM

MaxEva European database built on MaxSumo

3

Page 4: Today we will…

MaxSumoA tool that gives guidance on how to plan, monitor and evaluate an MM-project

With focus on assessment of:

- The awareness of the project

- The change in attitudes towards a mobility shift

- The change in mobility behaviour

4

Page 5: Today we will…

Mobility Management

System impact

MaxSumo

5

Page 6: Today we will…

Mobility Management

Mobility Management

services

New mobility options

System impacts System impacts

Assessment Levels

A

Project activities and outputs

B Awareness of mobility services provided

C Usage of mobility services provided

Assessm

ent of services

provided

D Satisfaction with mobility services provided

E Acceptance of mobility option offered

F Take up of mobility option offered

Assessm

ent of m

obility

option

s offered

G Satisfaction with the mobility option offered

H Long-term attitudes and behaviour

Overall

effects I System impacts

Page 7: Today we will…

Example: Test Traveller / Job ticket projectFramework conditions

Person-rel. factors Travel behaviour before: 5 % PT, 95 % car

Assessm

ent o

f services p

rovid

ed

MM project details: 10 posters, Intra net info, 4 meetings, 10000 E

Awareness: 48 % (480 employees)

Usage: 28 % (280 employees) particip. in info-meet.

Satisfaction: 80 % satisfied with info and test concept

Mo

bility o

ptio

n o

ffered

Acceptance: 6 % (54 people) signed a contract

Take up: During test month: 85 % PT, 15 % car

Satisfaction: 90 % of TT satisfied with commuting by PT

Effects

Long-term att & beh: After 12 months: 40 % PT, 60 % car

System impacts: Car traffic: 110.000 km, CO2: 20 tonnes

7

Page 8: Today we will…

• Interactive database with input and output modules• Based on MaxSumo and SARA• Repository for results from MM projects using MaxSumo • Precursor of a predictive tool

• Single measures• Plans or programs

MaxEva web-based database

Page 9: Today we will…

• Overview of needed data for an evaluation

• Easy and quick overview of your obtained results • Help to calculate the environmental effects (CO2)

• Overview of results from other projects• Possibility to benchmark your results with other´s

MaxEva gives you

Page 10: Today we will…

MaxEva input• Measure• Measure description (goal, target group, services and option

offered)• Measure settings (where, type of PT/bicycle supply etc)• Data on:

- External factors

- Stage position

- Travel behaviour

- MaxSumo level A: Performed activities

- MaxSumo level B-H: Awareness, Usage, Satisfaction, Acceptance, Take up

Page 11: Today we will…

You find MaxEva and MaxSumo at

www.epomm.org

11

1. MaxExplorer

2. MaxQ

3. MaxSem

4. MaxSumo

5. MaxEva

6. MaxTag

7. MaxLupo

Page 12: Today we will…

Let´s practice!Start

1. Start MaxEva via www.epomm.org

Register a project2. Select “Register a new project”

3. Fill in “Project description”

4. Fill in “Monitoring data”

5. Have a look at “Results”

6. Approve your data

Benchmark7. Select “Benchmarking”