To PIERRE MAILROOM 27 ORKER Dutiesinclude: … · Wage rate may in-crease w/experience w/com-pany....

1
Friday, March 23, 2018 CLASSIFIEDS capjournal.com l.!! Early Evenings to Midnight* Sunday through Thursday *Times may vary slightly MAILROOM ""ORKER Duties include: This position assists in preparing newspapers for dispatch from the mailroom. 333 West Dakota Avenue • Pierre, South 25 To 27 HOURS Per Week Visit our Facebook Page for the newest job postings in the area. PIERRE S NOW PROVIDED. :. ,'. . I, ~!!I!,II'I , BYTHE ._ I~ West Central Distribution, LLCPierre, SO Currently has an opening for seasonal Class ACOLHazmal endorsed driver. Jobduties include all aspects of delivery and pick up of crop protection/plant nutrient products in a prompt and safe manner, while following DOTregulation. Candidates should possess a strong work ethic, have a clean MVRand safety record. _HelP Wanted Ora ClassACOLdriver willing to obtain Hazmat & Tanker endorsement. West Central Human Resource~s~_:;;oo:: ... West Central Corporate Office 2700 Trott Avenue SW•POBox897 Willmar, MN56201 320.235.8518 --.~ 'W ESl c ENTR'.Al _HelP Wanted 2 TEMPORARY POSITIONS: MISCELLANEOUS AG 5/12/18 to 11/30/2018. Duties:assist in AI calf opera- ion (brand, medicate, ultra- sound, embryo transfer, cattle ransport, herd health) harves ransport hay using large round baler, semi & self pro- pelled swather; install/repai electric fence; lube/repair farm machinery. Minimum 3 months experience. Must be able to lif 50 Ibs. & obtain a driver's li- cense within 30-90 days 0 hire. We offer $13.64 per/hou at 40 hours per/week. 3/4 guarantee, transportation & subsistence expenses to work- site paid after 50% completion of contract, or earlier. Housing, tools, equipment provided a no cost. Wage rate may in- crease w/experience w/com- pany. Bonuses at employe discretion. No minimum edu- cation required. Mary Beth Assman Winner, SD Apply at SDDLR 605-773-3372 JobOrder#1814111 1 TEMPORARY POSITION: lAG Equipment Operator, [4/15/18 to 12/15/2018. Duties:operate farm equipmen to plant, cultivate, harvest & store crops; attach implements (plow, disc, drill); tow harvest- ing equipment; operate self-propelled combine; lube/repair farm machinery; drive semi trucks; cut/bale hay, ix fence; haul manure. Mini- mum 3 months experience. Must be able to lift 50 Ibs. & obtain a driver's license within 30-90 days of hire. We offe $13.64 per/hour at 48 hours per/week. 3/4 guarantee, transportation & subsistence expenses to worksite paid af- ter 50% completion of con- tract, or earlier. Housing, tools, equipment provided at no cost. ~age rate may increase w/ex- perience w/company. Bonuses Fit employer discretion. No minim. Lazy Diamond M Ranch Gettysburg, SD Apply at Pierre SDDLR 605-773-3372 Job Order #1812017 POLICE OFFICER CITY OF PIERRE ESSENTIAL FUNCTIONS: Performs law enforcement & public safety duties as neces- sary to maintain law & order in the City of Pierre. QUALIFICATIONS: Must be at least 21 years 0 age, have a high school di- ploma or GED, & pass the po- lice entry level examinations including a background investi- gation. Prior experience in la enforcement is desirable. Cer- tified officer preferred. SALARY: $21.18 minimum CLOSING DATE: Open until filled Clhe'ck US out 0 the,W,eb Applications To: City of Pierre Human Resources Director P.O. Box 1253 Pierre SD 57501 (605) 773-7429 www.cityofpierre.org EOE POSITION OPENING: HEAVY EQUIPMENT OPERATOR MINIMUM QUALIFICATIONS: Experience operating heavy equipment such as a backhoe, excavator, ditch witch and ront end loader in tight situa- tions around utilities. Must be able to perform manual labo which involves moderate to heavy lifting. Ability to perform high level customer service to citizens, contractors and ven- dors and work in a team at- mosphere alongside a group of highly motivated individuals. Possess or ability to obtain a Class A CDL with air brakes within 60 days of employment. ESSENTIAL FUNTIONS: This position serves as an equipment operator and is in- volved in planning, construct- ing and repairing water and sewer mains. Must be able to operate and maintain equip- ment used in the position. SALARY: $18.36-21.30 DOE CLOSING DATE: Open until filled APPLICATIONS TO: City of Pierre Human Resources Director P.O. Box 1253 Pierre SD 57501 (605) 773-7429 www.cityofpierre.org PublicNotice SNAXLP 16238 2tdly 3/23, 3/30 NOTICE TO BIDDERS Notice is hereby given that sealed proposals will be re- ceived by the Finance Officer of the City of Pierre, South Da- kota, at the City Hall at 222 East Dakota, P.O. Box 1253, Pierre, South Dakota 57501-1253 until 2:00 P.M. on the 17th day of April, 2018, for the 115 kV Transmission Line • • Improvements at Evans Street Substation Temporary Line & Corner Structure Replacement, at which time the bids shall be publicly opened and read aloud. Proposals will be acted upon by the City Commission at a subsequent meeting. The general nature of the work on which proposals will be re- ceived consists of constructing a temporary 115 kV transmis- sion line bypass around the ex- isting Evans Street Substation to allow for the substation to be rebuilt, and then re-connecting the applicable phase and shield conductors to the new steel deadend structures in the substation. The project also in- cludes removing an existing lattice box switch structure and replacing it with a new lami- nated wood pole structure. The Contractor will be responsible for supplying and installing all labor, equipment, and materi- als (less the steel poles that will be furnished by the Owner) on the project. The above work shall be in ac- cordance with the specifica- tions and proposed form of contract now on file in the City offices in said City of Pierre, South Dakota, by this refer- ence made a part hereof, as though fully set out and incor- porated herein. Complete digital project bid- ding documents are available at www.questcdn.com. You may download the digital plan documents for $15 by inputting Quest project # 5634007 on the website's Project Search page. Please contact QuestCDN.com at 952-233-1632 or [email protected] for assis- tance in free membership reg- istration, downloading, and working with this digital project information. An optional paper set of the proposal forms and specifications for individual use may be obtained from the of- fice of the Engineer, DGR En- gineering, 1302 South Union, P.O. Box 511, Rock Rapids, Iowa 51246, telephone 712-472-2531, Fax 712-472-2710, e-mail: [email protected]. Resident South Dakota contractors who intend, in good faith, to bid upon this project may obtain these docu- ments free of charge. Non-resi- dent contractors may receive these documents upon pay- ment of the following amounts for the project documents, none of which is refundable: Project Manual, Specifications, and Drawings: $150.00 Each proposal shall be made out on proposal forms fur- nished by the Engineer and shall be accompanied by either (1) a cashier's check or draft or check certified and drawn on a solvent State or National bank, in an amount equal to five per- cent (5%) of the amount of the Bid; or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of South Dakota, in an amount not less than ten per- cent (10%) of the amount of the Bid. The bid security shall be made payable to the City of Pierre, South Dakota. The bid security must not contain any conditions either in the body or as an endorsement thereon. Such bid security shall be for- feited to the City as liquidated damages in the event the suc- cessful bidder fails or refuses to post satisfactory Perform- ance and Payment Bonds and enter into a contract within fif- teen (15) days after the award of the contract. The sealed envelope contain- ing the proposal shall be clearly marked "BID EN- CLOSED - 115 kV TRANSMIS- SION LINE IMPROVEMENTS" on the outside of the envelope. Payment to the Contractor will be made on the basis of ninety percent (90%) upon certifica- tion of work completed; ten percent (10%) within thirty-one (31) days after final completion and acceptance. The construction shall be per- formed upon a Notice to Pro- ceed issuance. Substantial completion of the project shall be no later than September 15, 2018 (Temp Line) and Septem- ber 29, 2018 (Corner Structure Replacement. See the specifi- cations for more details on con- struction timing requirements. The Pierre City Commission reserves the right to defer ac- ceptance of any proposal for a period not to exceed thirty (30) days after the date proposals are received and no proposal Steve Harding, Mayor Published twice at the total ap- proximate cost of $99.10. SNAXLP 16240 1tdly 3/23 AGENDA BOARD OF ADJUSTMENT April 2nd, 2018 - 5:15 p.m. Pursuant to SDCL 11-4-21, the Board of Adjustment, City of Pierre, gives notice that at 5:15 p.m., April 2nd, 2018 the Board of Adjustment will hold a meeting at the City Hall Com- mission Room, 222 E. Dakota Ave., to consider the following matters: Julian & Deborah Lancaster, 1120 Winchester Drive, are seeking a variance to side yard and front yard setbacks. Pursu- ant to City of Pierre Ordinance 12-5-106, on every corner lot in a residential district there shall be provided on the adjacent street a minimum front yard of 25 feet, and a minimum side yard of 20 feet. The Lancas- ter's are requesting a 3 foot variance to the front yard set- back for a total setback of 22 feet. The Lancaster's are also requesting a 4 foot setback to the side yard adjacent to the street for a total street side yard setback of 16 feet. Rock & Tonya Kierstead, 2431 East Sully Avenue, are seeking a variance to a front yard set- back. Pursuant to City of Pierre Ordinance 12-5-406 each lot shall have a front yard depth of 25 feet. The Kierstead's are re- questing an 11 foot variance for a total front yard setback of 14 feet. IF SPECIAL ACCOMMODA- TIONS ARE NECESSARY, PLEASE NOTIFY THE PUB- LIC WORKS OFFICE AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO THE DAY OF THE MEETING. FOR MORE INFORMATION, CALL (605) 773-7341 . Published once at the total ap- proximate cost of $18.59. SNAXLP 16239 1tdly 3/23 CITY COMMISSION ROOM PIERRE, SOUTH DAKOTA March 13,2018 The City of Pierre Board of Commissioners met in regular session on March 13, 2018 at 5:30 pm with Commissioners Huizenga, Johnson, Mehlhaff and Mayor Harding present for roll call. The Pledge of Alle- giance was recited followed by an invocation. The agenda was approved as posted. Mayor Harding issued a proc- lamation for Developmental Disabilities Awareness Month. The Commission recognized the Pierre Governor Wrestler State Champions. Commissioner Huizenga moved and Commissioner Mehlhaff seconded to approve the consent calendar to include the Minutes of the regular meeting on March 7, 2018; PublicNotice Employee Promotion - Police Administrative Captain to Po- lice Chief, Jason Jones $85,881.35; Claims. Unani- mous approval. CENEX FLEET CARD, DIE- SEL JAN, 1,928.42; CUMMINS CENTRAL POWER, LLC, SERVICE ON EMERGENCY GENERATRS, 9,751.86; DANE BREWER, IS TRAVEL SDWWA SEMINAR, 53.00; DGR ENGINEERING, ASH ST SUB IMP, GFRLD SUB 15KV, 28,575.00; FIRST DAKOTA ENTERPRISES INC, HIL- GERS GULCH SANITARY SWR, 147,262.46; JARED GEIGLE, IS TRAVEL SDWWA SEMINAR, 32.00; INTER- STATE ENGINEERING INC, HILGERS GULCH SANITARY SWR, 575.00; KHC CON- STRUCTION, INC, WWTP FA- CILITY IMPROVEMENTS, 287,856.64; MID-DAKOTA RU- RAL WATER, 1/25-2/2220742 302ND AVE, 6.75; MIDCONTI- NENT COMMUNICATION, INTRNT 3/1-31 715 E DA- KOTA, 792.48; OVERDRIVE INC, E BOOKS, 3,268.36; SD WATER & WASTEWATER ASSN, REG WW SEMINAR TOWNLEY,COLDSMI, 180.00; SCOTT SZUGGAR, IS TRAVEL SDWWA SEMINAR, 32.00; WELLS FARGO BANK NA, DVD RETURN, 9,319.78. Mike Isaacs, Airport Manager, explained that the proposals are due this week and likely will be provided to the City by end of the week. The committee will then have 30 days to review and provide a recommendation to USDOT. The Committee members include Mayor Steve Harding, Commissioner Blake Barringer, City Administrator Kristi Honeywell, City Engineer John Childs, Manager of Com- munications, Special Projects and IT Brooke Bohnenkamp, Airport Manager Mike Isaacs, and Jim Peitz and John Hight. Sharon Pruess, City Planner, presented an introduction to the Plat of Lot20R Riverplace Addition. This is a minor replat to include the adjacent lot for one larger lot to better accom- modate lot coverage restric- tions for their planned resi- dence. The Planning Commis- sion recommended approval on February 26th. Commis- sioner Barringer moved and Commissioner Huizenga sec- onded to approve Resolution 2618. Unanimous approval. RESOLUTION NO. 2618 A RESOLUTION APPROVING THE PLAT OF LOT 20R, A REPLAT OF LOTS 19 AND 20, RIVERPLACE ADDITION TO THE CITY OF PIERRE, HUGHES COUNTY, SOUTH DAKOTA. WHEREAS, the plat of the above described property has been executed according to statute, now therefore; BE IT RESOLVED that the City Commission, in and for the City of Pierre, does hereby ap- prove the said plat of LOT 20R, RIVERPLACE ADDITION. Dated this 13th of March, 2018. CITY OF PIERRE, SOUTH DAKOTA BY: Steve Harding, Mayor ATTEST: Twila Hight,

Transcript of To PIERRE MAILROOM 27 ORKER Dutiesinclude: … · Wage rate may in-crease w/experience w/com-pany....

Friday, March 23, 2018 CLASSIFIEDS capjournal.com l.!!

Early Evenings to Midnight*Sunday through Thursday*Times may vary slightly

MAILROOM""ORKERDuties include:

This position assists in preparingnewspapers for dispatch from themailroom.

333 West Dakota Avenue • Pierre, South

25To27

HOURSPer Week

Visit our Facebook Page for thenewest job postings in the area.

PIERRE

SNOW

PROVIDED. :. ,'. . I, ~!!I!,II'I ,BYTHE ._ I ~

West Central Distribution, LLCPierre, SOCurrently has an opening for seasonalClass ACOLHazmal endorsed driver.

Job duties include all aspects of delivery and pick up of cropprotection/plant nutrient products in a prompt and safe manner,while following DOTregulation. Candidates should possess astrong work ethic, have a clean MVRand safety record.

_HelP Wanted

Or a Class A COLdriver willing to obtain Hazmat & Tanker endorsement.

West Central Human Resource~s~_:;;oo::...West Central Corporate Office2700 Trott Avenue SW• POBox897Willmar, MN56201320.235.8518

--.~'W ESl c ENTR'.Al

_HelP Wanted

2 TEMPORARY POSITIONS:MISCELLANEOUS AG5/12/18 to 11/30/2018.Duties:assist in AI calf opera-ion (brand, medicate, ultra-sound, embryo transfer, cattleransport, herd health) harvesransport hay using largeround baler, semi & self pro-pelled swather; install/repaielectric fence; lube/repair farmmachinery. Minimum 3 monthsexperience. Must be able to lif50 Ibs. & obtain a driver's li-cense within 30-90 days 0hire. We offer $13.64 per/houat 40 hours per/week. 3/4guarantee, transportation &subsistence expenses to work-site paid after 50% completionof contract, or earlier. Housing,tools, equipment provided ano cost. Wage rate may in-crease w/experience w/com-pany. Bonuses at employediscretion. No minimum edu-cation required.

Mary Beth AssmanWinner, SD

Apply at SDDLR605-773-3372

JobOrder#1814111

1 TEMPORARY POSITION:lAG Equipment Operator,[4/15/18 to 12/15/2018.Duties:operate farm equipmento plant, cultivate, harvest &store crops; attach implements(plow, disc, drill); tow harvest-ing equipment; operateself-propelled combine;lube/repair farm machinery;drive semi trucks; cut/bale hay,ix fence; haul manure. Mini-mum 3 months experience.Must be able to lift 50 Ibs. &obtain a driver's license within30-90 days of hire. We offe$13.64 per/hour at 48 hoursper/week. 3/4 guarantee,transportation & subsistenceexpenses to worksite paid af-ter 50% completion of con-tract, or earlier. Housing, tools,equipment provided at no cost.~age rate may increase w/ex-perience w/company. BonusesFit employer discretion. Nominim.

Lazy Diamond M RanchGettysburg, SD

Apply at Pierre SDDLR605-773-3372

Job Order #1812017

POLICE OFFICERCITY OF PIERRE

ESSENTIAL FUNCTIONS:Performs law enforcement &public safety duties as neces-sary to maintain law & order inthe City of Pierre.

QUALIFICATIONS:Must be at least 21 years 0age, have a high school di-ploma or GED, & pass the po-lice entry level examinationsincluding a background investi-gation. Prior experience in laenforcement is desirable. Cer-tified officer preferred.

SALARY:$21.18 minimum

CLOSING DATE:Open until filled

Clhe'ck USout 0the,W,eb

Applications To:City of Pierre HumanResources DirectorP.O. Box 1253Pierre SD 57501(605) 773-7429

www.cityofpierre.orgEOE

POSITION OPENING:HEAVY EQUIPMENT

OPERATOR

MINIMUM QUALIFICATIONS:Experience operating heavyequipment such as a backhoe,excavator, ditch witch andront end loader in tight situa-tions around utilities. Must beable to perform manual labowhich involves moderate toheavy lifting. Ability to performhigh level customer service tocitizens, contractors and ven-dors and work in a team at-mosphere alongside a groupof highly motivated individuals.Possess or ability to obtain aClass A CDL with air brakeswithin 60 days of employment.

ESSENTIAL FUNTIONS:This position serves as anequipment operator and is in-volved in planning, construct-ing and repairing water andsewer mains. Must be able tooperate and maintain equip-ment used in the position.

SALARY:$18.36-21.30 DOE

CLOSING DATE:Open until filled

APPLICATIONS TO:City of Pierre HumanResources DirectorP.O. Box 1253

Pierre SD 57501(605) 773-7429

www.cityofpierre.org

• PublicNotice

SNAXLP 162382tdly 3/23, 3/30

NOTICE TO BIDDERSNotice is hereby given that

sealed proposals will be re-ceived by the Finance Officerof the City of Pierre, South Da-kota, at the City Hall at 222East Dakota, P.O. Box 1253,Pierre, South Dakota57501-1253 until 2:00 P.M. onthe 17th day of April, 2018, forthe 115 kV Transmission Line

• • Improvements at Evans StreetSubstation Temporary Line &Corner Structure Replacement,at which time the bids shall bepublicly opened and readaloud. Proposals will be actedupon by the City Commissionat a subsequent meeting.The general nature of the workon which proposals will be re-ceived consists of constructinga temporary 115 kV transmis-sion line bypass around the ex-isting Evans Street Substationto allow for the substation to berebuilt, and then re-connectingthe applicable phase andshield conductors to the newsteel deadend structures in thesubstation. The project also in-cludes removing an existinglattice box switch structure andreplacing it with a new lami-nated wood pole structure. TheContractor will be responsiblefor supplying and installing alllabor, equipment, and materi-als (less the steel poles thatwill be furnished by the Owner)on the project.The above work shall be in ac-cordance with the specifica-tions and proposed form ofcontract now on file in the Cityoffices in said City of Pierre,South Dakota, by this refer-ence made a part hereof, as

though fully set out and incor-porated herein.Complete digital project bid-ding documents are availableat www.questcdn.com. Youmay download the digital plandocuments for $15 by inputtingQuest project # 5634007 onthe website's Project Searchpage. Please contactQuestCDN.com at952-233-1632 [email protected] for assis-tance in free membership reg-istration, downloading, andworking with this digital projectinformation. An optional paperset of the proposal forms andspecifications for individual usemay be obtained from the of-fice of the Engineer, DGR En-gineering, 1302 South Union,P.O. Box 511, Rock Rapids,Iowa 51246, telephone712-472-2531, Fax712-472-2710, e-mail:[email protected]. Resident SouthDakota contractors who intend,in good faith, to bid upon thisproject may obtain these docu-ments free of charge. Non-resi-dent contractors may receivethese documents upon pay-ment of the following amountsfor the project documents,none of which is refundable:Project Manual, Specifications,

and Drawings: $150.00Each proposal shall be madeout on proposal forms fur-nished by the Engineer andshall be accompanied by either(1) a cashier's check or draft orcheck certified and drawn on asolvent State or National bank,in an amount equal to five per-cent (5%) of the amount of theBid; or (2) a bid bond executedby a corporation authorized tocontract as a surety in theState of South Dakota, in anamount not less than ten per-cent (10%) of the amount ofthe Bid. The bid security shallbe made payable to the City ofPierre, South Dakota. The bidsecurity must not contain anyconditions either in the body oras an endorsement thereon.Such bid security shall be for-feited to the City as liquidateddamages in the event the suc-cessful bidder fails or refusesto post satisfactory Perform-ance and Payment Bonds andenter into a contract within fif-teen (15) days after the awardof the contract.The sealed envelope contain-ing the proposal shall beclearly marked "BID EN-CLOSED - 115 kV TRANSMIS-SION LINE IMPROVEMENTS"on the outside of the envelope.Payment to the Contractor willbe made on the basis of ninetypercent (90%) upon certifica-tion of work completed; tenpercent (10%) within thirty-one(31) days after final completionand acceptance.The construction shall be per-formed upon a Notice to Pro-ceed issuance. Substantialcompletion of the project shallbe no later than September 15,2018 (Temp Line) and Septem-ber 29, 2018 (Corner StructureReplacement. See the specifi-cations for more details on con-struction timing requirements.The Pierre City Commissionreserves the right to defer ac-ceptance of any proposal for aperiod not to exceed thirty (30)days after the date proposalsare received and no proposal

Steve Harding,Mayor

Published twice at the total ap-proximate cost of $99.10.

SNAXLP 162401tdly 3/23

AGENDABOARD OF ADJUSTMENTApril 2nd, 2018 - 5:15 p.m.Pursuant to SDCL 11-4-21,

the Board of Adjustment, Cityof Pierre, gives notice that at5:15 p.m., April 2nd, 2018 theBoard of Adjustment will hold ameeting at the City Hall Com-mission Room, 222 E. DakotaAve., to consider the followingmatters:Julian & Deborah Lancaster,1120 Winchester Drive, areseeking a variance to side yardand front yard setbacks. Pursu-ant to City of Pierre Ordinance12-5-106, on every corner lot ina residential district there shallbe provided on the adjacentstreet a minimum front yard of25 feet, and a minimum sideyard of 20 feet. The Lancas-ter's are requesting a 3 footvariance to the front yard set-back for a total setback of 22feet. The Lancaster's are alsorequesting a 4 foot setback tothe side yard adjacent to thestreet for a total street sideyard setback of 16 feet.Rock & Tonya Kierstead, 2431East Sully Avenue, are seekinga variance to a front yard set-back. Pursuant to City of PierreOrdinance 12-5-406 each lotshall have a front yard depth of25 feet. The Kierstead's are re-questing an 11 foot variancefor a total front yard setback of14 feet.IF SPECIAL ACCOMMODA-

TIONS ARE NECESSARY,PLEASE NOTIFY THE PUB-LIC WORKS OFFICE ATLEAST TWENTY-FOUR (24)HOURS PRIOR TO THE DAYOF THE MEETING. FORMORE INFORMATION, CALL(605) 773-7341 .

Published once at the total ap-proximate cost of $18.59.

SNAXLP 162391tdly 3/23CITY COMMISSION ROOMPIERRE, SOUTH DAKOTA

March 13,2018The City of Pierre Board ofCommissioners met in regularsession on March 13, 2018 at5:30 pm with CommissionersHuizenga, Johnson, Mehlhaffand Mayor Harding present forroll call. The Pledge of Alle-giance was recited followed byan invocation. The agenda wasapproved as posted.Mayor Harding issued a proc-lamation for DevelopmentalDisabilities Awareness Month.The Commission recognizedthe Pierre Governor WrestlerState Champions.Commissioner Huizenga

moved and CommissionerMehlhaff seconded to approvethe consent calendar to includethe Minutes of the regularmeeting on March 7, 2018;

• PublicNotice

Employee Promotion - PoliceAdministrative Captain to Po-lice Chief, Jason Jones$85,881.35; Claims. Unani-mous approval.CENEX FLEET CARD, DIE-SEL JAN, 1,928.42; CUMMINSCENTRAL POWER, LLC,SERVICE ON EMERGENCYGENERATRS, 9,751.86;DANE BREWER, IS TRAVELSDWWA SEMINAR, 53.00;DGR ENGINEERING, ASH STSUB IMP, GFRLD SUB 15KV,28,575.00; FIRST DAKOTAENTERPRISES INC, HIL-GERS GULCH SANITARYSWR, 147,262.46; JAREDGEIGLE, IS TRAVEL SDWWASEMINAR, 32.00; INTER-STATE ENGINEERING INC,HILGERS GULCH SANITARYSWR, 575.00; KHC CON-STRUCTION, INC, WWTP FA-CILITY IMPROVEMENTS,287,856.64; MID-DAKOTA RU-RAL WATER, 1/25-2/2220742302ND AVE, 6.75; MIDCONTI-NENT COMMUNICATION,INTRNT 3/1-31 715 E DA-KOTA, 792.48; OVERDRIVEINC, E BOOKS, 3,268.36; SDWATER & WASTEWATERASSN, REG WW SEMINARTOWNLEY,COLDSMI, 180.00;SCOTT SZUGGAR, ISTRAVEL SDWWA SEMINAR,32.00; WELLS FARGO BANKNA, DVD RETURN, 9,319.78.Mike Isaacs, Airport Manager,explained that the proposalsare due this week and likely willbe provided to the City by endof the week. The committee willthen have 30 days to reviewand provide a recommendationto USDOT. The Committeemembers include Mayor SteveHarding, Commissioner BlakeBarringer, City AdministratorKristi Honeywell, City EngineerJohn Childs, Manager of Com-munications, Special Projectsand IT Brooke Bohnenkamp,Airport Manager Mike Isaacs,and Jim Peitz and John Hight.Sharon Pruess, City Planner,presented an introduction tothe Plat of Lot20R RiverplaceAddition. This is a minor replatto include the adjacent lot forone larger lot to better accom-modate lot coverage restric-tions for their planned resi-dence. The Planning Commis-sion recommended approvalon February 26th. Commis-sioner Barringer moved andCommissioner Huizenga sec-onded to approve Resolution2618. Unanimous approval.

RESOLUTION NO. 2618A RESOLUTION APPROVINGTHE PLAT OF LOT 20R, AREPLAT OF LOTS 19 AND 20,RIVERPLACE ADDITION TOTHE CITY OF PIERRE,HUGHES COUNTY, SOUTHDAKOTA.WHEREAS, the plat of the

above described property hasbeen executed according tostatute, now therefore;BE IT RESOLVED that the

City Commission, in and for theCity of Pierre, does hereby ap-prove the said plat of LOT 20R,RIVERPLACE ADDITION.Dated this 13th of March,

2018.

CITY OF PIERRE,SOUTH DAKOTA

BY: Steve Harding,Mayor

ATTEST:

Twila Hight,