14
October 2, 2018 TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations FROM: Robert Swartz Field Operations C ONSOLIDATED SEWER MAINTENANCE DISTRICT C ONDITION ASSESSMENT PROGRAM REPORT U NWCORPORATED COUNTY This memo is to inform you that the County of Los Angeles Department of Public Works C onsolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment Program of a portion of the unincorporated County's sewer system m aintained by the District's Central Yard. The enclosed Condition Assessment Report provides details regarding the maintenance and structural condition of your City's sewer mainlines. This information should be i ncluded in the District's Sewer System Management Plan as a reference in Chapter 8, System Evaluation and Capacity Assurance Plan. The segments with critical maintenance issues have been cleaned and, where appropriate, incorporated into our enhanced maintenance cleaning schedule for continued monitoring. In addition, the s egments with severe structural defects have either been repaired or will be scheduled f or repair or replacement as part of the ongoing Accumulative Capital Outlay Project. j H K: Attach. bc: RS, KE, File (YOTV1314B2)

Transcript of TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. ·...

Page 1: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

October 2, 2018

TO: Nicholas AgbobuEngineering, Budget, and OfFice Operations

FROM: Robert SwartzField Operations

CONSOLIDATED SEWER MAINTENANCE DISTRICTCONDITION ASSESSMENT PROGRAM REPORTUNWCORPORATED COUNTY

This memo is to inform you that the County of Los Angeles Department of Public WorksConsolidated Sewer Maintenance District (District) has completed a Sewer ConditionAssessment Program of a portion of the unincorporated County's sewer systemmaintained by the District's Central Yard.

The enclosed Condition Assessment Report provides details regarding the maintenanceand structural condition of your City's sewer mainlines. This information should beincluded in the District's Sewer System Management Plan as a reference in Chapter 8,System Evaluation and Capacity Assurance Plan. The segments with criticalmaintenance issues have been cleaned and, where appropriate, incorporated into ourenhanced maintenance cleaning schedule for continued monitoring. In addition, thesegments with severe structural defects have either been repaired or will be scheduledfor repair or replacement as part of the ongoing Accumulative Capital Outlay Project.

j H K:

Attach.

bc: RS, KE, File (YOTV1314B2)

Page 2: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

C O ND ITIO N A S S ES S M ENT REP O RTC O UNTY O F L O S A NGEL ES D EP A RTM ENT O F P UB L IC W O RKS

C O NS O L ID A TED S EW ER M A INTENA NC E D IS TRIC T

P RO JEC T N A M E : Y0 TV1314B 2 P RO JEC TM GR:

Eric L iu

P RO JEC T D A TE : 0 7 /23/20 14 C O N TA C TN O :

(626)30 0 -3390

S UP . D IS TRIC T(s ): 1 M A PP A GE(S ):

197 8

ReportB y: H anna Kebed e ReportD ate: 1 0 /2/20 1 8

INTRO D UC TIO N

A s partof the S ewer C ond ition A s s es s mentP rogram , the C ou nty of L os A ngelesD epartmentof P u blic W orks C ons olid ated S ewer M aintenanc e D is tric t(D is tric t) hasc ompleted the c ond ition as s es s mentof15, 590 feetor0 . 9 perc entofthe u ninc orporatedC ou nty’ s s ewers ys tem maintained by the D is tric t’ s C entralYard .

The enc los ed C ond ition A s s es s mentReportou tlines the s tru c tu raland maintenanc eratings of you r s ys tem bas ed on the P A C P 's (Vers ion 6. 0 . 1) rating method ology.Inc lu d ed in the reportare the following:

P rojec tO verview M ap(Enc los u re 1)

Q u ic kM aintenanc e RatingM apand S ample L ateralN otic e L etter(Enc los u re 2)

Q u ic k S tru c tu ralRating ReportP riority L is tand Q u ic k S tru c tu ralRating P riorityM ap(Enc los u re 3)

The D is tric t has now c ompleted the c ond ition as s es s ment of 60 4, 358 feet of theu ninc orporated C ou nty’ s s ewer s ys tem maintained by the D is tric t’ s C entral Yard .P reviou s C ond ition A s s es s mentReports d ated S eptember3, 2 0 0 8 , Ju ne 3, 2 0 0 9, M arc h4, 2 0 1 1 , N ovember21 , 2 0 16 have been provid ed to you . A c opy ofthe reports c an als obe fou nd in the D is tric t’ s webs ite athttp: //d pw. lac ou nty. gov/s md /c c tv/c ity/.

The S ewerC ond ition A s s es s mentP rogram u tilizes the P A C P Q u ic kRatingmethod ologyto rank the s tru c tu raland maintenanc e c ond ition of you r s ys tem bas ed on ind u s trys tand ard s .

Page 3: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

P RO JEC T A REA A ND D ES C RIP TIO N

P rojec tN o. Y0 TV1314B 2 inc lu d ed s ewerlines loc ated in the u ninc orporated C ou nty ofL os A ngeles and the c ities ofC ommerc e, Glend ora, Ind u s try, L a C anad a Flintrid ge andW alnu t. Enc los ed foryou rreferenc e is an overview map of the projec tarea within theu ninc orporated C ou nty (Enc los u re 1).

D EFEC T GRA D E D ES C RIP TIO N

The Q u ic kRating ind ic ates the nu mberofoc c u rrenc es forthe highes ts everity grad e foreac h pipe s egmentforeithermaintenanc e ors tru c tu rald efec ts . A grad e of1 ind ic atesthata pipe s egmentis in exc ellentc ond ition with minor d efec ts while a grad e of5 ind ic ates thata pipe s egmentmay requ ire immed iate attention. A legend of the fivepos s ible d efec tgrad es is as follows :

Grad e D efec tGrad e D esc ription

1 : M INO R

2 : M INO R TO M O D ERA TE

3: M O D ERA TE

4: S IGNIFIC A NT

5: M O S T S IGNIFIC A NT

M A INTENA NC E REP O RT

O u r ins pec tion revealed thatapproximately 7 4. 1 perc entof the s ys tem televis ed inu ninc orporated C ou nty as partof P rojec tN o. Y0 TV1314B 2 was free of s ignific antbloc kages orres tric tions thatwou ld imped e s ewerflows . H owever, the remaining 25. 9perc entofthe pipe s egments within the u ninc orporated C ou ntyhad aP A C P maintenanc egrad e of 3, 4, or5 as ind ic ated in the Q u ic k M aintenanc e Rating Table s hown below.Thes e s egments have been inc orporated into ou r rou tine c leaning s c hed u le withc orrec tive ac tion taken.

A c olor-c od ed map s howing the qu ic k maintenanc e rating for eac h pipe s egmentisprovid ed in Enc los u re 2 .

Page 4: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

Q UIC K M A INTENA NC E RA TING TA B L E

D EFEC T GRA D EP IP E L ENGTH

(FT)

P ERC ENT TO TA LINS P E C TED P IP E

L ENGTH

NO . O FS EGM ENTS

1 : M inor 10 , 0 7 1 64. 6 362 : M inorto M od erate 1 , 48 5 9. 5 53: M od erate 2 , 690 1 7 . 3 94: S ignific ant 1 , 344 8 . 6 45: M os tS ignific ant 0 0 0

TO TA L 15, 590 1 0 0 . 0 54

Lateral Notices

A ls o inc lu d ed in the maintenanc e ins pec tion reports are private laterald efic ienc iesd is c overed d u ringthe as s es s mentofthe mainline. The D is tric td oes notmaintain laterallines . Itis the res pons ibilityofthe propertyownerto maintain theirres pec tive laterallinesto fac ilitate the flow ofwas tewaterfrom theirproperty to the mainline. L etters have beens entto propertyowners in you rC itynotifyingthem ofthe maintenanc e is s u es d etec ted intheirlaterals . A s ample lateralnotic e letteris provid ed in Enc los u re 2 foryou rreferenc e.

High Water Levels and Infiltration

O u rins pec tion revealed thatH ighW aterL evels and Infiltration were notd etec ted in anypipe s egmentin the C ou nty’ s s ewers .

S TRUC TURA L REP O RT

O u rins pec tion revealed thatapproximately 8 8 . 1 perc entofthe ins pec ted pipe s egmentswithin the u ninc orporated C ou nty were free of s evere s tru c tu rald efec ts . H owever, theremaining 11 . 9 perc entofthe ins pec ted pipe s egments had a P A C P s tru c tu ralgrad e of4 or5 as ind ic ated in the Q u ic kS tru c tu ralRating Table s hown below. Thes e s egmentshave been plac ed on a priority lis tbas ed on the s everity and the need forac tion. Foritems 1 throu gh58 in the Q u ic kS tru c tu ralRatingReportP riorityL is t(Enc los u re 3), whic hwarrantac orrec tive ac tion, the propos ed c orrec tive ac tion willbe programmed in the next24 months as partofthe ongoingA c c u mu lative C apitalO u tlay P rogram .

A c olor-c od ed maps howingthe Q u ic kS tru c tu ralRatingforeac hpipe s egmentis loc atedin Enc los u re 3.

Page 5: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

Q UIC K S TRUC TURA L RA TING TA B L E

D EFEC TGRA D E

P IP E L ENGTH(FT)

P ERC ENT TO TA LINS P E C TED P IP E

L ENGTH

NO . O FS EGM ENTS

1 : M inor 1 , 249 8 . 0 52 : M inorto M od erate 8 37 5. 4 43: M od erate 11 , 646 7 4. 7 394: S ignific ant 1 , 8 58 1 1 . 9 65: M os tS ignific ant 0 0 0

TO TA L 15, 590 1 0 0 . 0 54

C O ND ITIO N A S S ES S M ENT P RO JEC TS

The S ewerC ond ition A s s es s mentP rogram performed the c ond ition as s es s mentofthes ewerlines within the u ninc orporated C ou nty maintained by the Eas tYard ac c ord ingtothe followings c hed u le:

FIS C A L YE A RP RO JEC T

NA M EL ENGTH

(FT)P ERC ENTA GE

O F S YS TEMS TA TUS

20 0 5-20 0 6 Y0 TV0 50 6A 34, 256 2 . 0 C O M P L ETED

20 0 6-20 0 7 Y0 TV0 60 7 C 9, 47 5 0 . 6 C O M P L ETED

20 0 7 -20 0 8 Y0 TV0 7 0 8 B 252 , 0 69 14. 7 C O M P L ETED

20 0 8 -20 0 9 Y0 TV0 8 0 9B 5, 167 0 . 3 C O M P L ETED

20 0 9-20 1 0 Y0 TV0 91 0 B 22 7 , 7 0 4 13. 2 C O M P L ETED

20 10 -20 1 1 Y0 TV10 1 1 B 2 8 6, 7 41 16. 7 C O M P L ETED

20 11-20 1 2 Y0 TV111 2 A 643, 390 37 . 5 REP O RT IN P RO GRES S

2 0 13-20 14 Y0 TV1314B 1 243, 157 14. 1 REP O RT IN P RO GRES S

2 0 13-20 14 Y0 TV1415B 2 15, 590 0 . 9 C O M P L ETED

TO TA L 1 , 7 1 7 , 549 10 0 . 0

Page 6: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

ENCLOSURE 1:

Project Overview Map

Page 7: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

E CONANT ST

E HARCO ST

GOND

AR A

V

MCNA

B AV

WOOD

RUFF

AV

ALBU

RY A

V

PALO

VER

DE A

V

SENA

SAC

AV

CANE

HILL

AV

E PARKCREST ST

SNOW

DEN

AV

CONQ

UIST

A AV

HACK

ETT A

V

E CARITA ST

CARF

AX A

V

FAUS

T AV

FANW

OOD

AV

E HANBURY ST

E PARKCREST ST

E HARCO ST

FANWOOD AV CONQ

UIST

A AV

WOOD

RUFF

AV

E PARKCREST ST

E HARCO ST

E CARITA STCA

RFAX

AV

" ±

ENCLOSURE 1

CCTV PROJECT

Y0TV1314B2

UNINCORPORATEDCOUNTY

OVERVIEWMAP

O0 130 260 390 520

Feet

LegendSMD Sanitary Sewers

SMD Manholes!U Other

Manhole Type!(

#*

Standard

DROP

Shallow

XW Trap

!? Siphon

ÍP SMD Pump Stations

Q3 SMD Treatment Plants

Trunk Sewerlines

Y0TV1314B2

This map is intended only for internal operations of theLos Angeles County Sewer Maintenance Districts.Los Angles County expressly disclaims any liabilityfor any inaccuracies which may be present in thismap. Data contained in this map is produced inwhole or part from the Thomas Bros. Maps® digitaldatabase. This map is copyrighted, and reproducedwith permission granted, by Thomas Bros. Maps®.All rights reserved.

September, 2018

!(

160154 166 172 265 271 275!(!!(! !(! !(! !(! !(! !(!

!(

161155 167!(!!(! 173 266 276272!(!!(! !(! !(!!(!

156 !(!162 168!(! !(267!(! 277292 273174!(! !(! !(!!(! !(!

140293 291 !(!

!(! !(!

141!(!

163 C-1978290 289 288 157 !(!!(! !(! !(! !(!!(!

169268 274 278175 !(!142 !!( !(!28 !(!7

286 !(!285!(!!(! !(! !(

144 145 146 147 170!(! !(! !(! !(! !(!164148 150 158 !(!!(! !(! !(!

269 279176!(! !(!!(!

152 !( !( !(!(!

171165149 151 !(!159!(!!(! !(! !(! 270 280177

!(! !(!!(!

153 !(!(!

!( !(

!(

Page 8: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

EN C L O S URE 2 :

Q u ic kM aintenanc e RatingM apS ample L ateralN otic e L etter

Page 9: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

E CONANT ST

E HARCO ST

MCNA

B AV

GOND

AR A

V

WOOD

RUFF

AV

ALBU

RY A

V

PALO

VER

DE A

V

SENA

SAC

AV

CANE

HILL

AV

E PARKCREST ST

SNOW

DEN

AV

CONQ

UIST

A AV

HACK

ETT A

V

E CARITA ST

CARF

AX A

V

FAUS

T AV

FANW

OOD

AV

E PARKCREST ST

E HARCO ST

FANWOOD AV

CONQ

UIST

A AV

WOOD

RUFF

AV

E PARKCREST ST

E HARCO ST

E CARITA STCA

RFAX

AV

" ±

ENCLOSURE 2

CCTV PROJECT

Y0TV1314B2

UNINCORPORATEDCOUNTY

QUICK MAINTENANCE

RATING(QMR)

O0 110 220 330 440

Feet

LegendSMD Sanitary SewersQMR

1: MINOR

2: MINOR TO MODERATE

3: MODERATE

4: SIGNIFICANT

SMD Manholes!U Other

Manhole Type!( Standard

#* DROP

Shallow

XW Trap

!? Siphon

ÍP

Q3SMD Pump Stations

SMD Treatment Plants

Trunk Sewerlines

SMD Operation Map

Y0TV1314B2

This map is intended only for internal operations of theLos Angeles County Sewer Maintenance Districts.Los Angles County expressly disclaims any liabilityfor any inaccuracies which may be present in thismap. Data contained in this map is produced inwhole or part from the Thomas Bros. Maps® digitaldatabase. This map is copyrighted, and reproducedwith permission granted, by Thomas Bros. Maps®.All rights reserved.

September, 2018

!(

154 160 166 172 265 275271!(!( !( !( !( !( !(

!(

E HANBURY ST

161155 167!(!( 173 266 276272!(!( !( !( !(

162156 !( 168!( !(267!( 273 277174!( !( !(!(

140!(

141!(

C-1978 163157 !( 169!(!( 268 274 278175 !(142 !( !(!(!(285

!( !(

144 145 146 147 170!( !( !( !( !(164148 150 158 !(!( !( !(

269 279176!( !(!(

152 !( !( !(!(

171165149 !(151 159 !(!( !( !( 270 280177!( !(!(

153 !(!(

!( !(

!(

Page 10: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

Page 1 of 2

NOTICE OF SEWER LATERAL ROOT INTRUSION

CONSOLIDATED SEWER MAINTENANCE DISTRICT Property Owner/Occupant 1234 Mailing Street Mailing City, California 99999 The County of Los Angeles Consolidated Sewer Maintenance District (District) is responsible for the maintenance of the sanitary sewer system in your area. A camera inspection of the sewer mainline discovered roots in your sewer lateral connection. The intrusion of the roots from your lateral may block the flow of sewage in the mainline sewer causing an overflow to your property and/or those immediately upstream of your property. You are hereby requested to perform maintenance on your private sewer lateral. In accordance with County Code 20.24.080 Maintenance of Sewer Laterals. "All house laterals, industrial connection sewers, septic tank outlet connections to STEP system, and appurtenances thereto existing as of January 23, 1953, or thereafter constructed, shall be maintained by the owner of the property served in a safe and sanitary condition, and all devices or safeguards which are required by this Division 2 for the operation thereof shall be maintained in good working order." The property owner, you are responsible for the entire length of the sewer lateral, which includes the portion that extends beyond the property line into the public right of way. We request that you contact a licensed plumber to service your sewer lateral within 90 days to remove roots and any other obstructions that may cause a sewage backup. Your licensed plumber is required to protect the District's sewer mainlines from dislodged roots and other debris by utilizing catcher baskets at the manhole downstream from your lateral connection. Prior to your plumber cleaning your lateral, please notify the District's sewer maintenance yard in your area at (123) 456-7890 for authorization to access the downstream manhole. We have included literature on ways to minimize sewer overflows and damage to your home. Please consider establishing a routine cleaning schedule for your sewer lateral to minimize potential plumbing problems caused by root intrusion that are likely to reoccur. If you have recently cleaned your sewer later, no further action is necessary. If you have any questions, please contact Ms. Kari Eskridge, Sewer Maintenance Division, at (626) 300-3390 or [email protected]. Thank you for helping keep the sewer lines clean and in good working order.

Page 11: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

Page 2 of 2

Minimizing Sewer Overflows and Damage to Your Home The sewer system within the District is comprised of a series of underground pipes. Many are publicly owned; however, the sewer laterals are entirely owned by the private property owner they serve. The laterals extend from the building to the mainline within the street (or within an easement at the rear of your home). The laterals are typically four inches in diameter while the District's mainline is typically at least eight inches in diameter. The private property owner is responsible for the entire length of the lateral, which includes the portion that may be located within the public right of way (under the asphalt and street landscaping).

Sewer backups can cause tremendous damage to the interior of a home. In order to minimize these, the District provides continual maintenance services for the public sewer mainlines. Unfortunately, sewer laterals are often not maintained by private property owners until a disaster strikes. "Out of sight, out of mind" is a typical approach to sewer lateral maintenance and operation by many. It is our hope that we can provide you various means of addressing these issues and thus, minimize your risk of an overflow entering your home. The three methods we suggest are:

1. Maintain your lateral through proper cleaning, repair, and replacement. 2. Do not place improper items into the sewer or make improper connections to the

sewer. a. Keep rainwater out of the sewer lines as it overwhelms the capacity of the

sewer lines and may cause sewer spills. b. Do not pour fats, oils, and grease in your drains as these products harden

and stick to the inside of the sewer pipes, which build up and may eventually cause a blockage in the sewer pipe.

3. Install a backflow preventer and cleanout in your sewer lateral.

SEWER LATERALS – AREAS OF RESPONSIBILITY

Homeowner is responsible for lateral maintenance up to the sewer

mainline.

OR

Sewer Easement

Property Boundary

Sewer Lateral Sewer Lateral Homeowner's Responsibility Homeowner's Responsibility

District's Responsibility District's Responsibility

Foot Path Foot Path Street

Sewer Mainline Sewer Mainline

Page 12: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

ENCLOSURE 3:

• Quick Structural Rating Report Priority List

• Quick Structural Rating Map

Page 13: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

E CONANT ST

E HARCO ST

GOND

AR A

V

MCNA

B AV

WOOD

RUFF

AV

ALBU

RY A

V

PALO

VER

DE A

V

SENA

SAC

AV

CANE

HILL

AV

E PARKCREST ST

SNOW

DEN

AV

CONQ

UIST

A AV

E CARITA ST

CARF

AX A

V

FAUS

T AV

FANW

OOD

AV

E PARKCREST ST

E HARCO ST

FANWOOD AV

CONQ

UIST

A AV

WOOD

RUFF

AV

E PARKCREST ST

E HARCO ST

E CARITA ST

CARF

AX A

V

" ±

ENCLOSURE 3

CCTV PROJECT

Y0TV1314B2UNINCORPORATED

COUNTY

QUICK STRUCTURAL

RATING(QSR)

O0 110 220 330 440

Feet

LegendSMD Sanitary SewersQSR

1: MINOR

2: MINOR TO MODERATE

3: MODERATE

4: SIGNIFICANT

SMD Manholes!U Other

Manhole Type!(

#*

Standard

DROP

Shallow

XW Trap

!? Siphon

ÍP

Q3

SMD Pump Stations

SMD Treatment Plants

Trunk Sewerlines

SMD Operation Map

Y0TV1314B2

This map is intended only for internal operations of theLos Angeles County Sewer Maintenance Districts.Los Angles County expressly disclaims any liabilityfor any inaccuracies which may be present in thismap. Data contained in this map is produced inwhole or part from the Thomas Bros. Maps® digitaldatabase. This map is copyrighted, and reproducedwith permission granted, by Thomas Bros. Maps®.All rights reserved.

September, 2018

!(

154 160 166 172 265 271 275!( !( !( !( !( !( !(

!(

E HANBURY ST

161155 167!(!( 173 266 272 276!(!( !( !( !(

162156 !( 168!( !(267!( 277273174!( !(!(!(

140!(

141!(

163157 !( 169C-1978 !(!( 268 274 278175 !(142 !( !(!(!(285

!( !(

144 145 146 147 170!( !( !( !( !(164148 150 158 !(!( !( !(

269 279176!( !(!(

152 !( !( !(!(

171165149 !(151 159 !(!( !( !( 270 280177!( !(!(

153 !(!(

!( !(

!(

Page 14: TO: Nicholas Agbobu Engineering, Budget, and OfFice Operations … LA... · 2019. 4. 29. · Consolidated Sewer Maintenance District (District) has completed a Sewer Condition Assessment

ITEM NO. START MH END MH STREET OBSERVATION PROPOSED CORRECTIVE ACTION

1 1978-0280 1978-CITY CONQUISTA AV Fractures No action needed*

2 1978-0157 1978-0158 SENASAC AV Fractures Lining

3 1978-0149 1978-CITY WOODRUFF AV Fractures Lining

4 1978-0156 1978-0157 SENASAC AV Fractures Lining

5 1978-0159 1978-CITY SENASAC AV Fractures No action needed*

6 1978-0274 1978-0278 HARCO ST Fractures No action needed*

ENCLOSURE 3

QUICK STRUCTURAL RATING REPORT PRIORITY LIST

UNINCORPORATED COUNTY OF LOS ANGELES CENTRAL YARD (Y0TV1314B2)

Page 1 of 1