  • 7/31/2019 TNB Operation 20Planning

    1/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    1

    Operation planning

    (L5)

  • 7/31/2019 TNB Operation 20Planning

    2/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    2

    A power system

  • 7/31/2019 TNB Operation 20Planning

    3/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    3

    TNB power system

    PG (Singapore)

    EGAT (Thailand)

    TNB (P. Malaysia)

  • 7/31/2019 TNB Operation 20Planning

    4/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    4

    TNB power system

    Transmission Voltage 500kV

    275kV

    132kV 66kV

    Generation Total 18,323MW

    (installed)

    TNB 10,836MW (59%)

    IPP 7,487MW (41%)

    Demand 12,990MW (08/06)

    12,724MW (11/06)

  • 7/31/2019 TNB Operation 20Planning

    5/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    5

    TNB power system

    =

  • 7/31/2019 TNB Operation 20Planning

    6/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    6

    Who is who in the industry (in Pen. Malaysia)

  • 7/31/2019 TNB Operation 20Planning

    7/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    7

    Interconnectivity of systems (in Pen. Malaysia)

  • 7/31/2019 TNB Operation 20Planning

    8/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    8

    Grid codes & licence standards

  • 7/31/2019 TNB Operation 20Planning

    9/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    9

    Building operation reliability & robustness TNB case

  • 7/31/2019 TNB Operation 20Planning

    10/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    10

    1. TNB License (reflected in the Transm issionSystem Reliability & Pow er Quality

    Standards)2. The Malaysian Grid Codes

    3. TNBs contractual obligations

    4. Operation based on the least cost

    5. TNBs business objectives

    Governing principles for operation TNB case

  • 7/31/2019 TNB Operation 20Planning

    11/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    11

    Governing principles (continued)

    1. TNB License;granted underthe ElectricitySupply Act

    1990

    The Licensee shall operate &m aintain its transm ission and the

    connected generators, in

    accordance w ith the license

    standards (i.e. Condition no.13)

    2. Transmission

    SystemReliabilityStandards

    (TSRS)

    Generation security standards

    Operation under no contingency

    Operation under secured contingency

    Operation under m ultiple

    contingency

    Operation under unsecured

    contingency

  • 7/31/2019 TNB Operation 20Planning

    12/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    12

    Governing principles (continued)

    3. TransmissionSystem PowerQualityStandards

    (TSPQS)

    Voltage sag Voltage step change

    Voltage fluctuations & flicker

    Harm onics

    Phase unbalance & traction load

    Step change of pow er

  • 7/31/2019 TNB Operation 20Planning

    13/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    13

    Governing principles (continued)

    4. MalaysianGrid Codes

    Planned outages (generator units &transmission)

    Assignm ent of spinning reserve

    Day ahead unit com m itm ent andgeneration schedules

    W eekly operation plan

    Annual operation plan Monitoring & testing

    Planning data

    Num bering of equipm ent in the gridsystem

  • 7/31/2019 TNB Operation 20Planning

    14/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    14

    Governing principles (continued)

    5. PowerPurchaseAgreements(PPAs)

    13 PPAs betw een TNB & IPPs(currently in operation)

    6. OtherAgreements

    TNB-EGAT:

    System Interconnection Agreement(2202)

    Supplementary Agreement (2004)

    7. TNB

    requirements

    TNB Process Standardisation &

    Im provem en t Procedures (ISO) Risk Managem ent

    Governance on disclosure of internal

    information

  • 7/31/2019 TNB Operation 20Planning

    15/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    15

    1. Matching generation (output) with the forecastdemand together with generation reserves

    2. Taking into account, outages of generation andtransmission system

    3. Complying the grid codes and the license

    standards4. Meeting contractual obligations

    5. Meeting least cost operation

    6. Carrying out OP during operational timescale

    Operation planning (OP) tasks

  • 7/31/2019 TNB Operation 20Planning

    16/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    16

    Operation planning timescales

    1. One day ahead (daily ; 24 hours; hour 0 0:00hour to hour 24:00 )

    2. One week ahead (w eekly Friday to Thursday )

    3. One month ahead (monthly)

    4. One year ahead (yearly ; 1 Septem ber to 31

    August)5. 2 years ahead (yearly)

    6. 5 years ahead (yearly)

  • 7/31/2019 TNB Operation 20Planning

    17/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    17

    Operation planning - activities

    Daily Processes Monthly/ Weekly Processes Yearly Processes

    1. Planning-System Operationcoordination (docket meeting)

    2. Management of generator unitsavailability

    3. Scheduling energy import/exportexchange

    4. Scheduling generator unitplanned outages

    5. Scheduling transmission plannedoutages

    6. Scheduling of commissioning(transmission)

    7. Scheduling of system tests (if any)8. Scheduling of unit commitment

    and generation schedule

    9. Assessment of system security

    1. Scheduling of generator unitplanned outages

    2. Scheduling of transmissionplanned outages

    3. Scheduling of unit commitmentand generation schedule

    4. Scheduling of gas nomination5. Transient security assessment

    (WTSA)

    6. Plan coordination (OPP-NLDCmeeting)

    7. Fault level & system security

    analysis8. Reports to regulators &

    government.

    1. Two Year SystemOperation Plan(Transmission)

    2. Five Year SystemOperation Plan(Production)

    3. Generation Mixreport

    4. Generation Security Standard Report

    5. OperationCoordination (Joint

    OperationCommittees)

    6. Grid SystemPerformanceReport

    As & when required1. Updating planning data (on the grid system and on the fuel price variation)

    2. Managing fuel supply variation (including gas curtailment).

    3. Validating availability of stand-by fuel

    4. Submission of data/reports to Regulators, Government and TNB authorities

    5. Power Quality Monitoring & Measurement

  • 7/31/2019 TNB Operation 20Planning

    18/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    18

    Operation planning an overview(as documented in TNB ISO m anual)

  • 7/31/2019 TNB Operation 20Planning

    19/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    19

    Operation Planning (OP) planning cycles

    Monthly/weekly OP

    Daily OP

    Real-timeOperation

    OPP (System Planning) department

    NLDC department

    Annual OP

  • 7/31/2019 TNB Operation 20Planning

    20/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    20

    Operation Planning (OP) yearly cycles

    Monthly/weekly OP

    Daily OP

    Real-timeOperation

    OPP (System Planning) department

    NLDC department

    Annual OP

    1. Two Year System Operation Plan (Transmission)

    2. Five Year System Operation Plan (Production)

    3. Generation Mix report4. Generation Security Standard Report

    5. Operation Coordination (Joint OperationCommittees)

    6. Grid System Performance Report

    Annual OP

  • 7/31/2019 TNB Operation 20Planning

    21/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    21

    Operation Planning (OP) monthly/weekly cycles

    Monthly/weekly OP

    Daily OP

    Real-timeOperation

    OPP (System Planning) department

    NLDC department

    Annual OP

    1. Scheduling of generator unit planned outages2. Scheduling of transmission planned outages

    3. Scheduling of unit commitment andgeneration schedule

    4. Scheduling of gas nomination5. Transient security assessment (WTSA)

    6. Plan coordination (OPP-NLDC meeting)

    7. Fault level & system security analysis

    8. Reports to the government, regulators & TNB.

    Annual OP

  • 7/31/2019 TNB Operation 20Planning

    22/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    22

    Operation Planning (OP) daily cycles

    Monthly/weekly OP

    Daily OP

    Real-timeOperation

    OPP (System Planning) department

    NLDC department

    Annual OP

    1. Planning-System Operation coordination(docket meeting)

    2. Management of generator units availability3. Scheduling energy import/export exchange4. Scheduling generator unit planned outages5. Scheduling transmission planned outages

    6. Scheduling of commissioning (transmission)7. Scheduling of system tests (if any)8. Scheduling of unit commitment and generation

    schedule

    9. Assessment of system security

    Annual OP

  • 7/31/2019 TNB Operation 20Planning

    23/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    23

    Five Year System Operation Plan (FYOP)

    FYOP addresses operation plan up to 5 years ahead,focusing on adequacy of generation capacity andproduction cost.

    FYOP report highlights:

    Demand forecast & growth Generation capacity and operating margins Generation mix

    Operation cost Possible mitigative measures: -

    Adjusting outage (maintenance) schedule Addressing stand-by fuel & stock

    Uses software tools: PMonth (production schedule & cost optimisation)

    Ref: W ork Instruction Level 3 no. TNBT-SPOD-750 -01-OPP-W I-09

  • 7/31/2019 TNB Operation 20Planning

    24/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    24

    Generation Mix report (Genmix)

    Genmix report addresses forecast generation for the(one) year ahead, mainly as input for preparingfinancial budget for:

    Operation of TNBs Power Stations and Energy payment to IPPs

    Genmix report highlights (for one year ahead): Forecast of generation production.

    Forecast of generation mix by fuel type.

    Uses software tools: PMonth (production schedule & cost optimisation)

    Ref: W ork Instruction Level 3 no. TNBT-SPOD-750 -01-OPP-W I-11

    i i d d ( )

  • 7/31/2019 TNB Operation 20Planning

    25/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    25

    Generation Security Standard report (GSS)

    Generation Security Standard (GSS) report addressesthe system generation capability to meet theforecast load and energy demand for up to 5 years

    ahead.GSS report highlights: Demand forecast Generation capacity and operating margins

    Uses software tools: PMonth (production schedule & cost optimisation)

    Ref: W ork Instruction Level 3 no. TNBT-SPOD-750 -01-OPP-W I-10

    i h d li

  • 7/31/2019 TNB Operation 20Planning

    26/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    26

    Generator units outage scheduling

    The objective is to satisfy request (by IPP/TNB powerplants) for planned outages for generator units (forscheduled, maintenance, repair, etc) yet to ensure:

    The grid system is secured and reliable Generation reserve margin is adequate Cost of production is maintained at optimum level Availability of gas supply is within limits (declared by Petronas)

    Hydro lake level (Kenyir and Temengor) are within targetsScheduling process:

    Rolling five year outage plan (maintained in a database)

    Revised annually, quarterly (for TNB plants) Finalised and confirmed weekly

    Ref: W ork Instruction Level 3 no. TNBT-SPOD-750 -01-OPP-W I-06

  • 7/31/2019 TNB Operation 20Planning

    27/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    27

    Weekly generation and unit commitment schedules

    The objectives are: To plan for generator unit start/stop schedule To estimate quantum of gas supply requirement To plan for hydro lake level (based on the current level)

    The plan is at the optimum cost (for the given demandforecast & planned outage schedule).

    Scheduling process: Review availability of unit & capacity of generator units Review availability of gas supply (in mmscfd volume) Develop generation schedule based on the demand forecast

    Uses software tools:

    PCOM (production schedule & cost optimisation)

    Ref: W ork Instruction Level 3 no. TNBT-SPOD-750 -01-OPP-W I-07

    h d d h d l

  • 7/31/2019 TNB Operation 20Planning

    28/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    28

    Day ahead generation and unit commitment schedules

    The objectives are: To confirm power exchange between TNB & EGAT To develop the plan for committing generator units and their output

    on a half-hourly basis for 24 hours operation during the next day[See *] from hour 00:00 to hour 24:00.

    To work-out that the plan meets the forecast demand with adequatespinning reserve throughout the day

    The plan is at the optimum cost.

    Scheduling process: Review availability of unit & capacity of generator units Review availability of gas supply (in mmscfd volume) Develop generation schedule based on the demand forecast

    Uses software tools: PCOM (production schedule & cost optimisation)

    * W eekend/ holidays are given special exception

    Ref: W ork Inst ruction Level 3 no. TNBT-SPOD-750 -0 1-OPP-W I-0 3

    T Y S O i Pl (TYSOP)

  • 7/31/2019 TNB Operation 20Planning

    29/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    29

    Two Year System Operation Plan (TYSOP)

    TYSOP addresses operation plan two years ahead, focusing on

    adequacy of transmission and stability of the grid system.TYSOP report highlights:

    Operational issues in specific Regions (Northern, Eastern,Central and Southern)

    Operational issues of interconnection with Singapore and withThailand

    Impacts of new generation plant coming on-line

    Possible mitigative measures, taking into account: - Committed transmission & generation development plan Possible transmission options Defence plan

    Uses software tools: PSS/E (power flow, OPF, fault level, and transient stability) DSA Power Tools (transfer limit, voltage and transient security).

    Ref: W ork Instruction Level 3 no. TNBT-SPOD-750 -01-OPP-W I-12

    T i i

  • 7/31/2019 TNB Operation 20Planning

    30/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    30

    Transmission outage management

    The objective is to satisfy request for planned outages for

    transmission apparatus (for scheduled maintenance, repair,construction, etc) yet to ensure:

    The grid system is secured and reliable Cost of production is maintained at optimum level The above are confirmed through studies

    Scheduling process: Maintain details of planned outages (in a database)

    Coordinate with planned outages of generator units Revised monthly, confirmed one week up to 10 days ahead Revised and re-confirmed 1 day ahead Highlight controls (if necessary to maintain system security)

    Uses software tools: WOMS (Web-based Outage Management System) PSS/E (for conducting studies of individual outage cases)

    Ref: W ork Inst ruction Level 3 no. TNBT-SPOD-750 -0 1-OPP-W I-0 5

    C di i f i i i * f i i

  • 7/31/2019 TNB Operation 20Planning

    31/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    31

    Coordination of commissioning* of transmission

    The objective is to satisfy request for commissioning of

    transmission apparatus (for new equipment) yet to ensure: The new apparatus meet the general requirement for safe and

    correct operation, in terms of connectivity & labeling Impact to the transmission network is minimum (even if the

    commissioning is unsuccessful)Coordination process:

    Prepare equipment drawings (3 months ahead) Assign numbering of equipment (in the drawing) Prepare commissioning memorandum & submit to NLDC for

    implementation (7 days ahead minimum) Prepare switching program (in the commissioning memo)

    * Com m issioning refers to energising transm ission equipm ent for the 1st time

    Ref: W ork Instruction Level 3 no. TNBT-SPOD-750 -0 1-OPP-W I-16

    E l f thl t i i t l

  • 7/31/2019 TNB Operation 20Planning

    32/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    32

    Example of a monthly transmission outage plan

    E l f ti l d i t

  • 7/31/2019 TNB Operation 20Planning

    33/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    33

    Example of a contingency plan during outage

    E l f ti l d i t

  • 7/31/2019 TNB Operation 20Planning

    34/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    34

    Example of a contingency plan during outage

    E l f ti l d i t

  • 7/31/2019 TNB Operation 20Planning

    35/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    35

    Example of a contingency plan during outage

    E l f ti l d i t

  • 7/31/2019 TNB Operation 20Planning

    36/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    36

    Example of a contingency plan during outage

    E ample of a commissioning memo (1)

  • 7/31/2019 TNB Operation 20Planning

    37/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    37

    Example of a commissioning memo (1)

    Example of a commissioning memo (2)

  • 7/31/2019 TNB Operation 20Planning

    38/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    38

    Example of a commissioning memo (2)

    Example of a commissioning memo (3)

  • 7/31/2019 TNB Operation 20Planning

    39/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    39

    Example of a commissioning memo (3)

    Example of a commissioning memo (4)

  • 7/31/2019 TNB Operation 20Planning

    40/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6), 9 January 2007,Universiti Tenaga Nasional

    40

    Example of a commissioning memo (4)

    Example of a commissioning memo (5)

  • 7/31/2019 TNB Operation 20Planning

    41/41

    Asean Residential School in ElectricalEngineering (ARSEPEO6) 9 Jan ar 2007

    41

    Example of a commissioning memo (5)