TITLE SECURE SET DOWN ACCESS SYSTEM VALUE £40,208 PERIOD (4 WEEKS) CONTRACT JCT MINOR WORKS CLIENT BIRMINGHAM AIRPORT LIMITED ENGINEER GRAHAM GOULDEN Contact: Telephone: 0115 924 4555 Email: [email protected] Website: www.thomasbow.com Thomas Bow City Asphalt completed their works at Birmingham International Airport on 6th May 2011 on time and within budget. Working closely with Graham Goulden, Airport Infrastructure Manager, the construction management team carefully monitored the delivery of the works from concept to completion. The works involved the reconfiguration of BIA’s infrastructure in order to construct a new secure set down area adjacent to the main terminal building. Working with BIA has further strengthens Bow’s Airport sector works, which includes existing clients The Manchester Airports Group (MAG), for whom we have been working in partnership with since 2004. Director of Construction, John Allen personally leads our Airport sector works, having gained significant experience over the last 24 years. John benefits from a comprehensive knowledge of the specialist nature of these types of schemes having worked with the Ministry of Defence and the American Airbases in the successful delivery of a wide range of Airport and Airfield related works. Scope of works: Traffic & Pedestrian Management Site Clearance & Excavations Road Realignment & Kerbing Electrical Installations & Testing Drainage & Ducting Planing & Surfacing Tactile Paving Road Marking Traffic Signs Soft Landscaping

Transcript of TITLE SECURE SET DOWN ACCESS SYSTEM VALUE £40,208 … · TITLE SECURE SET DOWN ACCESS SYSTEM VALUE...

Page 1: TITLE SECURE SET DOWN ACCESS SYSTEM VALUE £40,208 … · TITLE SECURE SET DOWN ACCESS SYSTEM VALUE £40,208 PERIOD (4 WEEKS) CONTRACT JCT MINOR WORKS CLIENT BIRMINGHAM AIRPORT LIMITED

TITLE SECURE SET DOWN ACCESS SYSTEM

VALUE £40,208

PERIOD (4 WEEKS)

CONTRACT JCT MINOR WORKS

CLIENT BIRMINGHAM AIRPORT LIMITED

ENGINEER GRAHAM GOULDEN

Contact:

Telephone: 0115 924 4555

Email: [email protected]

Website: www.thomasbow.com

Thomas Bow City Asphalt completed their works at Birmingham International Airport on 6th May 2011 on time and within budget. Working closely with Graham Goulden, Airport Infrastructure Manager, the construction management team carefully monitored the delivery of the works from concept to completion. The works involved the reconfiguration of BIA’s infrastructure in order to construct a new secure set down area adjacent to the main terminal building. Working with BIA has further strengthens Bow’s Airport sector works, which includes existing clients The Manchester Airports Group (MAG), for whom we have been working in partnership with since 2004. Director of Construction, John Allen personally leads our Airport sector works, having gained significant experience over the last 24 years. John benefits from a comprehensive knowledge of the specialist nature of these types of schemes having worked with the Ministry of Defence and the American Airbases in the successful delivery of a wide range of Airport and Airfield related works.

Scope of works:

Traffic & Pedestrian Management

Site Clearance & Excavations

Road Realignment & Kerbing

Electrical Installations & Testing

Drainage & Ducting

Planing & Surfacing

Tactile Paving

Road Marking

Traffic Signs

Soft Landscaping