S.NO BLOCK REACTOR ID CAPACITY MOC TYPE AGITATOR RPM RPS
1
2
TIP SPEED(m/s) REACTOR ID CAPACITY MOC
RE-516 6.0 KL SS-316
RE-216 3.0 KL SS-316
SWEEP (DIAMETER
OF THE AGITATOR) m
TYPE AGITATOR RPM RPS TIP SPEED(m/s)
ANCHOR 58 0.9666667 1.35 4.098 47 0.78333333
ANCHOR 58 0.9666667 1.1 3.34 ---- ----
SWEEP (DIAMETER
OF THE AGITATOR)
mADJUSTED
RPMADJUSTED
RPS
3.32055
---
ADJUSTED TIP SPEED
Details of Reactors in MB-2 Details of Reactors in MB-5
S.NO REACTOR ID CAPACITY MOC RPM RPS S.NO CAPACITY MOC RPM RPS
1 work upRE-215 3.0KL SS-316 Anchor 50 0.83 1.33
3.48 1RE-523 3.0 KL GL Anchor 48 0.80 1.44 3.62 46RE-522 3.0 KL GL Anchor 48 0.80 1.435 3.60 46
2 ReactionRE-232 3.0KL GL Anchor 60 1.00 1.435 4.51
2RE-526 8.0 kl GL Anchor 100 1.67 1.65 8.64 52RE-525 8.0 kl GL Propeller 94 1.57 1.11 5.46 78RE-513 8.0 kl GL Propeller 107 1.78 1.11 6.22 78
3RE-229 6.0 KL SS-316 Anchor 57 0.95 1.35 4.03
3RE-511 8.0 kl SS-316 Anchor 57 0.95 1.35 4.03 57
RE-504 8.0 kl SS-316 Anchor 58 0.97 1.35 4.10 57
4
RE-217 5.0 KL SS-316 Anchor 48 0.80 1.4 3.52
4
RE-511 8.0 kl SS-316 Anchor 57 0.95 1.35 4.03 50
RE-504 8.0 kl SS-316 Anchor 58 0.97 1.35 4.10 50
5RE-229 6.0 KL Anchor 57 0.95 1.35 4.03
5RE-511 8.0 kl SS-316 Anchor 57 0.95 1.35 4.03 57
RE-504 8.0 kl SS-316 Anchor 58 0.97 1.35 4.10 57
6
RE-216 3.0 KL SS-316 Anchor 58 0.97 1.1 3.34
6
RE-516 6.0 KL SS-316 Anchor 57 0.95 1.35 4.03 47RE-229 6.0 KL SS-316 Anchor 57 0.95 1.35 4.03 RE-517 6.0 KL SS-316 Anchor 57 0.95 1.35 4.03 47
RE-506 7.0KL SS-316 Anchor 56 0.93 1.44 4.22 44RE-512 4.0 KL SS-316 Anchor 57 0.95 1.2 3.58 53
REQUIRED RPM FOR MB-V REACTORS
PURPOSE OF REACTOR
TYPE AGITATOR
SWEEP (DIAMETER
OF THE AGITATOR) m
TIP SPEED(
m/s)
REACTOR ID
TYPE AGITATO
R
SWEEP (DIAMETER
OF THE AGITATOR) m
TIP SPEED(m/
s)
ADJUSTED RPM W.R.T
MB-2 REACTORS
workup and PH
adjustment
CS lye solution
prepartion followed by
workup
Material isolation
first material slurry
washing