Time Schedule
-
Upload
sanggalangi-latinro -
Category
Documents
-
view
27 -
download
0
description
Transcript of Time Schedule
No. Uraian Pekerjaan BobotMONTH
KETERANGAN1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I Preliminaries 3.75%
Engineer survey works, site office accomodation, project signboard, ect 3.75%
II Construction Of Acces Road 0.00%
1 Jalan- Galian Tanah Permukaan- Cut & Fill dan Pemadatan- Urugan Pasir, dan Pemadatan- Lapisan Tanah Dasar (Hardcore)
2 Drainase
- Drainase Model V
- Gorong-gorong
- Bak Kontrol
Construction Of Temporary Storage Yard1 Temporary Storage Yard 0.48%
Earthwork At Power House 100.36%
1 Galian tanah, Perataan, Pemadatan 100.36%
Construction Of Power HouseBase
1 Lapisan Tanah Dasar2 Lantai Kerja
3 Beton Bertulang Getar Grade 25 (Lantai/Base)
4 Beton Bertulang Getar Grade 25 (Dinding)
5 Perkuatan Besi Beton6 Pekerjaan Bekisting7 Sistem Kedap Air8 Penutup SaluranBeton Pre-Cast 9 Penutup Saluran Besi Plat
perimeter drain
concrete cover slab
Trench cover
Frame1 Beton Bertulang Getar Grade 25
2 Perkuatan Besi Beton
Pekerjaan Atap1 Cold formed steel (PCSF)
- Ketinggian 10m dari lantai dasar
- Ketinggian 3,5m dari lantai dasar
- Penutup Atap
- Lapisan Anti Bocor
- Bubungan Atap
Flush doors with honey comb core all
Knot with gold size, stop and prime
Undercots and finishes coat af paint
Ironmongery
Ironmongery
Internal Wall
Well-burn clay brick with an approved plasticiser
Floor Finishes
Cement and sand trowelled smooth
Ceiling Finishes
Grid celling system
Undercots and finishes paint
Wall Finishses
Cement and sand with an approved plasticiser (external )
Cement and sand with and approved plasticiser (internal )
Ceramic tiles
Undercots and finishes coats painting (external)
Undercots and finishes coat painting (internal)
Sanitary Appliances
Sanitary fittings and accessories
Sundries
230mm wide half round concrete drain
Precast concrete drain cover slab
Precast concrete grade 25
Fencing and gates
Chainlink mild steel gate
Appointment Of Logistic, Import, and Port ClereanceSanitary Plumbing Installation (All Provisional)
Cold Water supply Installation (All Provisional)
Electrical Installation (All Provisional)
Fire Protection System (All Provisional)
Air Conditioning System (All Provisional)
Overhead Crane (All Provisional)
Earthwork at PipeLineSite Clearance
Slope Protection
Preparation Of Platform For Pipe
Drainage
Installation Of Pipe
Installation Of Fittings And Valves
Anchor Blocks & Concrete Works
RC Slab (Vehicle Crossing Over Pipe Trench)
Instalation Of PipeIntake Chamber, Outlet Chamber, Settling Basin, Weir And Wing Wall
Site Clearance
Excavation Works
Slope Protection
Concrete Works
Reinforcements
Sawn Formwork As Specified
Concrete Harderner Topping
Rubber Waterstop
Waterproofing
Sluice Gate
Sundries
KOMULATIF 3.75% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%