Time Schedule

4
No. Uraian Pekerjaan Bobot MONTH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 I Preliminaries 3.75% ineer survey works, site office accomodation, project signboard, 3.75% II Construction Of Acces Road 0.00% 1 Jalan - Galian Tanah Permukaan - Cut & Fill dan Pemadatan - Urugan Pasir, dan Pemadatan - Lapisan Tanah Dasar (Hardcore) 2 Drainase - Drainase Model V - Gorong-gorong - Bak Kontrol Construction Of Temporary Storage Yard 1 Temporary Storage Yard 0.48% Earthwork At Power House 100.36% 1 Galian tanah, Perataan, Pemadatan 100.36% Construction Of Power House Base 1 Lapisan Tanah Dasar 2 Lantai Kerja 3 Beton Bertulang Getar Grade 25 (Lantai/Base) 4 Beton Bertulang Getar Grade 25 (Dinding) 5 Perkuatan Besi Beton 6 Pekerjaan Bekisting 7 Sistem Kedap Air 8 Penutup SaluranBeton Pre-Cast 9 Penutup Saluran Besi Plat perimeter drain concrete cover slab Trench cover Frame 1 Beton Bertulang Getar Grade 25 2 Perkuatan Besi Beton Pekerjaan Atap 1 Cold formed steel (PCSF) - Ketinggian 10m dari lantai dasar - Ketinggian 3,5m dari lantai dasar - Penutup Atap - Lapisan Anti Bocor - Bubungan Atap Flush doors with honey comb core all Knot with gold size, stop and prime Undercots and finishes coat af paint Ironmongery Ironmongery Internal Wall Well-burn clay brick with an approved plasticiser Floor Finishes Cement and sand trowelled smooth Ceiling Finishes Grid celling system Undercots and finishes paint Wall Finishses Cement and sand with an approved plasticiser (external ) Cement and sand with and approved plasticiser (internal ) Ceramic tiles Undercots and finishes coats painting (external) Undercots and finishes coat painting (internal)

description

time schedule

Transcript of Time Schedule

Page 1: Time Schedule

No. Uraian Pekerjaan BobotMONTH

KETERANGAN1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I Preliminaries 3.75%

Engineer survey works, site office accomodation, project signboard, ect 3.75%

II Construction Of Acces Road 0.00%

1 Jalan- Galian Tanah Permukaan- Cut & Fill dan Pemadatan- Urugan Pasir, dan Pemadatan- Lapisan Tanah Dasar (Hardcore)

2 Drainase

- Drainase Model V

- Gorong-gorong

- Bak Kontrol

Construction Of Temporary Storage Yard1 Temporary Storage Yard 0.48%

Earthwork At Power House 100.36%

1 Galian tanah, Perataan, Pemadatan 100.36%

Construction Of Power HouseBase

1 Lapisan Tanah Dasar2 Lantai Kerja

3 Beton Bertulang Getar Grade 25 (Lantai/Base)

4 Beton Bertulang Getar Grade 25 (Dinding)

5 Perkuatan Besi Beton6 Pekerjaan Bekisting7 Sistem Kedap Air8 Penutup SaluranBeton Pre-Cast 9 Penutup Saluran Besi Plat

perimeter drain

concrete cover slab

Trench cover

Frame1 Beton Bertulang Getar Grade 25

2 Perkuatan Besi Beton

Pekerjaan Atap1 Cold formed steel (PCSF)

- Ketinggian 10m dari lantai dasar

- Ketinggian 3,5m dari lantai dasar

- Penutup Atap

- Lapisan Anti Bocor

- Bubungan Atap

Flush doors with honey comb core all

Knot with gold size, stop and prime

Undercots and finishes coat af paint

Ironmongery

Ironmongery

Internal Wall

Well-burn clay brick with an approved plasticiser

Floor Finishes

Cement and sand trowelled smooth

Ceiling Finishes

Grid celling system

Undercots and finishes paint

Wall Finishses

Cement and sand with an approved plasticiser (external )

Cement and sand with and approved plasticiser (internal )

Ceramic tiles

Undercots and finishes coats painting (external)

Undercots and finishes coat painting (internal)

Page 2: Time Schedule

Sanitary Appliances

Sanitary fittings and accessories

Sundries

230mm wide half round concrete drain

Precast concrete drain cover slab

Precast concrete grade 25

Fencing and gates

Chainlink mild steel gate

Appointment Of Logistic, Import, and Port ClereanceSanitary Plumbing Installation (All Provisional)

Cold Water supply Installation (All Provisional)

Electrical Installation (All Provisional)

Fire Protection System (All Provisional)

Air Conditioning System (All Provisional)

Overhead Crane (All Provisional)

Earthwork at PipeLineSite Clearance

Slope Protection

Preparation Of Platform For Pipe

Drainage

Installation Of Pipe

Installation Of Fittings And Valves

Anchor Blocks & Concrete Works

RC Slab (Vehicle Crossing Over Pipe Trench)

Instalation Of PipeIntake Chamber, Outlet Chamber, Settling Basin, Weir And Wing Wall

Site Clearance

Excavation Works

Slope Protection

Concrete Works

Reinforcements

Sawn Formwork As Specified

Concrete Harderner Topping

Rubber Waterstop

Waterproofing

Sluice Gate

Sundries

KOMULATIF 3.75% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%