19
BID CLARIFICATION #4 June 20, 2019 DUE DATE: June 25, 2019 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 90661 LOCATION: University of Connecticut Capital Projects & Facilities Procurement 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661: 1. Add/Replace the revised sections: o 09 7700 Fabric Covered Wall Systems o 10 1100 Visual Display Boards 2. Attached are updated Drawings A-201 Interior Elevations & A-602 Finish & Signage Schedules End of Bid Clarification #4

Transcript of TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project...

Page 1: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

BID CLARIFICATION #4 June 20, 2019 DUE DATE: June 25, 2019 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 90661 LOCATION: University of Connecticut Capital Projects & Facilities Procurement 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661:

1. Add/Replace the revised sections: o 09 7700 Fabric Covered Wall Systems o 10 1100 Visual Display Boards

2. Attached are updated Drawings A-201 Interior Elevations & A-602 Finish & Signage Schedules

End of Bid Clarification #4

Page 2: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11

SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and conditions of the construction contract, including but not limited to the General

Conditions and Supplementary Provisions, and all Division 01 General Requirements specification sections, apply to Work of this Section.

1.2 SUMMARY

A. General: Provide fabric covered wall system in accordance with the Contract Documents.

B. Related Work Specified Elsewhere:

1. Blocking, grounds, fillers and nailers are specified under Section 06 10 00 Rough Carpentry.

2. Architectural millwork is specified under Section 06 40 00 Architectural Woodwork.

C. Sustainable Design Requirements: Provide the Work, and submit documentation, as necessary for compliance with sustainable requirements specified in Section 01 81 13, “Sustainable Design Requirements”.

1.3 REFERENCES

A. General: Comply with the applicable provisions of the referenced standards except as modified by governing codes and the Contract Documents. Where a recommendation or suggestion occurs in the referenced standards, such recommendation or suggestion shall be considered mandatory. In the event of conflict between referenced standards, this specification or within themselves, the more stringent standard or requirement shall govern.

1. American Association of Textile Chemists and Colorists (AATCC): "Technical Manual".

2. United States Green Building Council (USGBC):Leadership in Energy & Environmental Design(LEED®): Green Building Rating System for Core & Shell (C&S) Version 3.0 www.usgbc.org.

1.4 SYSTEM DESCRIPTION

A. Performance Requirements:

1. Acoustical Performance: Sound absorption NRC of 0.80 to 0.90 according to ASTM C 423 for Type A mounting according to ASTM E 795.

2. Fire Resistance Ratings: Provide materials and assemblies that have been tested and comply with the following fire test performance criteria as determined by an independent testing laboratory acceptable to the authorities having jurisdiction. Tests shall include backing materials.

Page 3: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 2 of 11

a. Fabric panel assembly when tested in accordance with ASTM E84,Unadhered Method, (fully exposed to burn chamber of testing equipment) shall comply with the following:

b. Flame Spread: 25 or less.

c. Smoke Developed: 450 or less.

3. Flame Resistance of Fabrics: Fabrics utilized in systems shall be inherently flame resistant, or shall be treated to render them flame resistant, as defined in NFPA-701, Small Scale Test. Fabrics that are treated shall retain their flame resistant properties after having been subjected to the exposure cycles for accelerated cleaning or accelerated laundering specified in NFPA-701.

4. Colorfastness to Light: Fabrics utilized shall be rated colorfast to light when tested in accordance ASTM D3691 16A or 16E, Class 4 minimum at 40 hours.

5. Colorfastness to Wet and Dry Crocking: Fabrics utilized shall be rated colorfast to wet and dry crocking (rubbing off of color) when tested in accordance AATCC-8, Class 3 Minimum.

B. Green Building Performance Criteria:

1. All field-applied adhesives, sealants, primers, paints and coatings used on the interior of the building shall meet the volatile organic compound (VOC) and chemical component limitations as defined in Section 018115 VOLATILE ORGANIC COMPOUND (VOC) LIMITS for ADHESIVES, SEALANTS, PAINTS and COATINGS, VOC contents shall be identified and documented.

2. Field Applied Sealants and Adhesives used on this Project shall comply with VOC content limits of South Coast Air Quality Management District (SCAQMD) Rule #1168, and sealants used as fillers shall meet or exceed the requirements of Bay Area Air Quality Management District Regulation 8, Rule 51; as follows (expressed in grams of VOC per liter).

1.5 SUBMITTALS

A. Product Data: Submit for Architect’s action. Submit manufacturer's printed literature, specifications and installation instructions describing the general properties of each material and accessory to be used in the Work and other data as may be required to show compliance with the Contract Documents including written data on physical characteristics, durability, resistance to fading, and flame resistance characteristics. Include information relating to the amount of time for fabric acclimatization to minimize sagging and distortion when stretched in place.

B. Shop Drawings: Submit for Architect’s action. Submit shop drawings of fabric covered wall system(s) for the fabrication and the installation of the Work noting frame and core materials. Include large scale details, dimensioned plans and elevations, and adjacent work of other trades. Show details at all corners, penetrations, reveals, intersections at door or window jambs and heads, shelves, countertops, electrical outlets, switches, thermostats and other related construction. In addition, submit the following:

Page 4: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 3 of 11

1. Submit seaming diagrams of fabrics.

2. Panel identification numbers relating to installation.

C. Samples: Submit for Architect’s action. Label samples to indicate product, characteristics, and location in the Work. Samples will be reviewed for color and appearance only. Furnish sufficient samples to establish the full range of colors and textures for materials exposed in the finished work. Compliance with other requirements is the responsibility of the Contractor. Where piece dyed, submit sample from actual dye lot for approval prior to shipping finish fabric to the site. Prepare samples from same material to be used for the Work. Provide the following:

1. Fabric: One sample of each type of fabric specified: 3 yds. long by full width from selvage to selvage from dye lot used for the Work with specified fabric treatments applied. Mark top and face of fabric.

a. Comply with NFPA 701 for each fabric type scheduled to be flame retardant treated. Submit sample of fabric fully treated to Architect and obtain acceptance of finish prior to purchase of treated fabrics.

b. For each fabric type scheduled to be stain resistant treated, submit sample of fabric fully treated to Architect and obtain acceptance of finish prior to purchase of treated fabrics.

2. Core: One (1) sample of each type of core infill material: 12 in. square.

3. Prefabricated Fabric Covered Panel: 24 in. x 24 in., showing, edging profile, fabric, backing, infills and reveals all mounted to a hardboard substrate. Show joints at seams.

4. Decorative Metal Trim/Reveal: Submit samples of each type of decorative metal for each required alloy and finish.

a. Stainless Steel Trim/Reveal: 24 in. long x full profile samples for each type.

D. Quality Control Submittals: Submit for Architect’s information.

1. Certificates: a. Document Review: Before commencing work, submit a written statement

signed by the Contractor and the Applicator certifying that the Contract Documents, shop drawings and product data have been reviewed with material manufacturers' qualified technical representatives and that they agree the selected materials are proper, compatible with contiguous materials and adequate for the application shown.

b. Certification of Flame Resistance of Fabric: Submit certification attesting that the fabrics are inherently flame resistant, or have been treated to render them flame resistant, as defined in NFPA-701, Small Scale Test, and that the treated materials have retained their flame resistant properties after having been subjected to the exposure cycles for accelerated cleaning or accelerated laundering specified in NFPA-701 and that the treated materials

Page 5: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 4 of 11

will not stain or cause staining under the conditions of use in this Project.

c. Certification of Application: Submit one copy of certification in an approved form, stating that the completed fabric covered wall system(s) complies with these Specifications, that the component parts were properly designed or selected for the application made, and that installation methods complied with manufacturer's printed instructions and their field representatives' verbal instructions, and were proper and adequate for the condition of installation and use in each case, and that the specified warranty will be provided without restriction.

2. Test Reports: Submit independent laboratory test reports for the following:

a. NRC rating for each fabric covered wall.

b. Flame Spread and Smoke Developed Ratings for fabric wrapped panel and fabric covered wall.

E. Green Building Submittal Requirements per Section 01 81 13 “Sustainable Design Requirements”.

F. Closeout Submittals: Submit for Owner’s documentation.

1. Special warranties as specified.

2. Maintenance Instructions: Submit copies of bound maintenance manuals, describing the materials, and procedures for care, cleaning and maintaining each type of fabric wrapped panel and accessory. Submit the following:

a. Manufacturer's recommended frequency for maintaining fabric wrapped panels.

b. Precautions for cleaning materials and methods that could be detrimental to finishes and performance. Include cleaning and stain-removal products and procedures.

c. Include instructions for removing and replacing fabrics from substrate for the purposes of cleaning or retensioning.

1.6 QUALITY ASSURANCE

A. Basis of Design: When particular manufacturers’ materials, products or processes are specified for an item of Work, any one thereof is acceptable for the Contractor to choose. An alternative material, product or process will be considered if the Contractor submits a written substitution request together with such information as may be necessary to assist the Architect in determining whether the proposed substitution is acceptable; the burden of proof rests solely upon the Contractor.

B. Manufacturer: Provide each type of fabric wrapped panels and accessory as produced by a single manufacturer. This single manufacturer shall be responsible for coordination, testing and procurement of selected fabric and other related materials.

C. Installer Qualifications: Engage an experienced installer, having not less than 5 years’

Page 6: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 5 of 11

experience in the installation of fabric wrapped panels in projects of similar size and scope specified herein.

D. Regulatory Requirements: Comply with applicable requirements of the laws, codes, ordinances and regulations of Federal, State and Municipal authorities having jurisdiction. Obtain necessary approvals from authorities having jurisdiction.

E. Mock-Ups:

1. Before installing fabric wrapped panels system, install mock-up(s) for each type of fabric wrapped panel, under finished Project lighting conditions, required to demonstrate aesthetic effects and qualities of materials and execution. Install mock ups to comply with the specified requirements, using materials indicated for the completed Work. Incorporate decorative metal trim/reveal.

2. Install mock-ups in the location and of the size indicated or, if not indicated, as directed by Architect complete with all the specified components and including typical penetrations such as wall outlets and light switches. Notify Architect seven days in advance of dates and times when mockups will be installed.

3. Demonstrate the proposed range of aesthetic effects and workmanship. Obtain approval of mock-ups before starting work. Maintain mock-ups during construction in an undisturbed condition as a standard for judging the completed Work.

4. Approved mock-ups may become part of the completed Work if undamaged at date of final acceptance of the Work.

F. Pre-Installation Meeting: Prior to the installation, meet at the project site to review the material selections, substrate preparations, installation procedures, coordination with other trades, special details and conditions, standard of workmanship, and other pertinent topics related to the Work.

1.7 DELIVERY, STORAGE AND HANDLING

A. Delivery and Storage: Deliver materials to job site in manufacturer's unopened packaging clearly marked with manufacturer's name. Schedule delivery of material to prevent delays of the Work and to minimize on-site storage. Store materials as per manufacturer's recommendations. Store fabric horizontally.

B. Deliver prefabricated panels to project site with concealed panel identification numbers corresponding to numbers noted on shop drawings.

1.8 PROJECT/SITE CONDITIONS

A. General: Maintain ambient temperature in spaces receiving fabric covered wall systems between 60 deg. F. and 85 deg. F with a relative humidity between 20% and 50% at least 48 hours before, during, and after installation.

B. Install fabric covered wall systems and accessories after other finishing operations and adjacent construction; including architectural woodwork, ceiling systems, electrical and HVAC work and painting, have been completed.

Page 7: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 6 of 11

1.9 WARRANTIES

A. Warranties specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and are in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents.

1. Warranty of Fabric Covered Wall Systems: Submit a written warranty stating that the fabric covered wall systems will remain dimensionally stable and will not warp, sag or distort for a period of two (2) years from the date of final acceptance and agreeing to correct or replace, complete with materials and installation, at the Owner's convenience.

1.10 EXTRA MATERIALS

A. Extra Materials: Deliver the following extra stock to Owner, at job site from same manufactured dye lot as materials installed, enclosed in protective packaging and labeled as to contents complete with instructions for installation:

1. Fabric: Furnish quantity of fabric equal to 5% of the amount installed.

2. Track: Furnish length of track complete with accessories for installation equal to 5% of the amount installed.

3. Prefabricated Panels: Furnish quantity of each type of full size units complete with installation accessories, equal to 2% of the amount installed.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide fabric covered wall system

by the following:

1. Novawall Systems, Inc.

B. Products of the following manufacturers will be considered if evidence is furnished showing compliance with the minimum requirements specified.

1. SoftWalls, Inc. 2. Whisper Walls. 3. StretchWall Installations, Inc

2.2 MATERIALS

A. Fabric Covered Wall System: Provide manufacturer's standard system consisting of facing

material stretched taught over a frame and core material and secured in the frame.

1. Basis of Design: T O M A T C H W H A T I S I N S T A L L E D I N E X I S T I N G B U I L D I N G

Page 8: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 7 of 11

2. Classic StretchWall by StretchWall Installations, Inc.

3. Panels Designs and Configurations: As indicated on Drawings.

4. Vertical Butt Joints and Horizontal Reveals: As indicated on Drawings.

5. Nominal Overall System Thickness: 1-1/2 inch.

B. Fabric:

1. Provide fabrics with construction utilizing only non-recycled fibers. 2. Hold fabric defects, as listed in ASTM D3990 to the minimum. No defects will be

permitted on exposed faces of panels.

3. Provide uniformity of color, within the limits of the natural quality of the fiber and design of the weave, from selvage to selvage and end to end. Maintain such uniformity within each dye lot. Keep variation from one dye lot to another to a minimum. Install fabric with warp (vertical) and weft (horizontal) threads plumb, level and true. Pattern (if any), texture and grain of fabric shall be perfectly aligned at the seams and throughout the entire seam jointed system without distortion to the geometry of the fabric and pattern.

4. Treat all fabrics which are not inherently flame resistant so as to comply with Paragraph "Flame Resistance of Fabrics" and the "Certification" requirements specified.

5. Schedule of Systems and Fabrics Options:

a. Fabric Designation: AFB-1

1) Fabric: "Highfield by Kvadrat" 465957; (Maharam) or approved equal.

a) Color: 744 (DARK BLUE)

C. Core Materials:

1. Acoustically Absorbent Core: ASTM C612, Class 1 and 2; inert, compressible, unfaced, fire retardant, non-combustible, stable, 6 lb.- 7 lb./ft.3 density, semi-rigid fiberglass board.

a. Tackable Acoustically Absorbent Core: Inert, non-combustible, tackable, fire stable, compressed with minimum nominal density of 16 lb. to 18 lb. per cubic ft. density, rigid fiberglass board, 1/8 in. thick unless otherwise shown or specified. Adhere to 6 lb - 7 lb./ ft.3 density semi-rigid fiberglass board substrate utilizing manufacturer's approved adhesive.

2. Overlay Padding: 1/2 in. thick, compressible, fire retardant, polyester fiberfill overlay padding.

3. Plywood: APA Interior Grade A-B, with exterior glue, sanded both sides, fire retardant treated as per AWPA C27. Identify products with appropriate markings of applicable testing and inspecting organization.

Page 9: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 8 of 11

D. Framing Materials: Provide frames of dimensions and profiles shown or as required to comply with design intent.

1. Plastic: Rigid extruded PVC frame with hinged mounting or crimping system and edge profile as standard with the manufacturer. All corners shall be mitered and reinforced to provide solid framework to receive fabric. Basis of Design – 1” Weltless Novawall Extrusion.

2. Wood: Kiln dried ash, birch or poplar (fire retardant treated as required). Comply with requirements of Section 061000 Rough Carpentry.

E. Miscellaneous Materials:

1. Wood Screws: Screws: Select material, type, size, and finish required for each use. Comply with ASME B18.6.1 for applicable requirements. For metal framing supports, provide screws as recommended by metal-framing manufacturer.

2. Nails: FS FF-N-105, type, size, material and finish as required for the condition of use.

3. Staples: Upholstery type staples of sufficient strength to hold fabric taut in place without sagging.

4. Panel Clips: Aluminum interlocking offset panel fasteners, type, size and quantity for the condition of use. Consisting of 2-part panel clips, with one part of each clip mechanically attached to back of panel and the other to wall substrate, and designed to support panels laterally; and base support brackets designed to support full weight of panels; with both designed to allow panel removal. Provide one of the following or approved equal:

a. "Panel Fastenings" (Panel Fastenings, Inc.).

b. "Panel "Z" Clips" (Monarch Metal Fabrications Inc.).

c. "ZC3 Clips" (Doug Mockett & Co., Inc.).

5. Adhesives: As recommended by the system manufacturer.

F. Fire Retardant Treated Wood:

1. Materials: Fire retardant materials shall meet the requirements of AWPA P10.

2. Treatment: Pressure treat to meet requirements of AWPA C1 and C20 for lumber and C27 for plywood. After fire retardant treatment, kiln dry to the moisture content hereinbefore specified. Do not use colorants in solution to distinguish treated lumber from untreated lumber. Guarantee fire retardant materials not to bleed through finish of wood or affect detrimentally fabric covering. Provide the following:

a. Interior Fire Retardant Treatment: For interior use where relative humidity is normally below 80%; Low-Hygroscopic Formulation; interior Type A per

Page 10: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 9 of 11

AWPA C20. Provide fire retardant treatment from one of the following: 1) "Dricon" (Koppers Co., Inc.)

2) "Flameproof LHC" (Osmose Wood Preserving, Inc.)

3) "Pyro-Guard" (Hoover Treated Wood Products, Inc.)

3. Fabricate and mill wood before treatment wherever possible, and disassemble for treatment, so that cutting and jointing will not be required after treatment. Apply a heavy brush coat of the same fire retardant chemicals to any surfaces which are cut after treatment.

4. Kiln-dry woodwork after treatment to levels required for untreated woodwork. Maintain moisture content required by kiln drying before and after treatment.

5. Discard treated lumber that does not comply with requirements of referenced woodworking standard. Do not use twisted, warped, bowed, discolored, or otherwise damaged or defective lumber.

2.3 DECORATIVE METAL

A. General:

1. For the fabrication of decorative metal work which will be exposed to view, use only materials which are smooth and free of surface blemishes.

2. Comply with additional requirements of Section 057000 Decorative Metal.

B. Decorative Metal Trim/Reveal: Provide decorative metal trim and reveals for fabric covered wall system.

1. Material: Stainless steel; minimum 1/8 inch thick.

2. Designs, Profiles and Configurations: As indicated.

3. Fasteners: Concealed.

4. Finish: Metal Type MTL04.

2.4 FABRICATION - GENERAL

A. General: Provide wood blocking and framing, anchors, clips, splines, supporting and fastening devices as required for a rigid installation, and as required to sustain the imposed loads. Provide cut-outs to receive attachments, mechanical and electrical work as required.

B. Do all fabrication from field measurement with provision for scribing as required to meet built-in conditions. Fabricate panel units in largest practicable sections. Assemble panels in the shop for trial fit, disassemble for shipment and reassemble with concealed fasteners.

C. Coordinate the work of this Section with the work of other trades; including millwork specified in Section 06 40 00 Architectural Woodwork.

Page 11: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 10 of 11

D. Maintain relative humidity and temperature during fabrication, storage and finishing operations matching that of the areas of installation.

E. Details indicate the required type and quality of construction. Modifications to conform to manufacturer's standards will be considered providing they comply with the Contract Documents, maintain the profiles shown and subject to acceptance by the Architect.

F. Reinforcing shown is minimum. Provide additional reinforcing as required to ensure a rigid assembly. Exposed surfaces shall be free from dents, tool marks, warpage, buckle, glue and open joints, or other defects affecting serviceability or appearance. Accurately fit all joints, corners and miters. Conceal all fasteners. Make threaded connections up tight so that threads are entirely concealed.

G. Decorative Metal: Form or extrude ornamental metal to required shapes and sizes, true to line and level with accurate angles and surfaces. Finish exposed surfaces to smooth, sharp, well-defined lines.

PART 3 - EXECUTION

3.1 GENERAL

A. Manufacturer's Instructions: Prepare substrates, apply primers and apply the work of this Section, including components, and accessories in accordance with the manufacturer's instructions, except where more stringent requirements are shown or specified, and where project conditions require extra precautions or provisions to ensure satisfactory performance of the Work.

3.2 EXAMINATION

A. Verification of Conditions: Examine the areas to receive the Work and the conditions under which the Work would be performed. Remedy conditions detrimental to the proper and timely completion of the Work. Do not proceed until unsatisfactory conditions have been corrected.

B. Condition systems to average prevailing humidity conditions in installation areas before installing.

3.3 INSTALLATION

A. Coordination: Coordinate fabric covered wall systems with the adjacent work of other sections. Provide items to be placed during the installation of other work at the proper time to avoid delays. Coordinate placement of such items, accurately in relation to the final location of fabric covered wall systems.

B. General: Install fabric covered wall systems in accordance with manufacturer's written instructions and recommendations.

1. Verify dimensions before proceeding and obtain measurements at job site for work required to be accurately fitted to other construction.

2. Incorporate panels into millwork assemblies and at locations indicated.

3. Install fabric covered wall systems in locations shown with vertical surfaces and edges

Page 12: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 09 7700 University of Connecticut FABRIC COVERED WALL SYSTEMS 159 Discovery Drive Storrs, Connecticut 06269 UConn Project # 991661

CLARIFICATION 6/20/19 CHRISTOPHER WILLIAMS ARCHITECTS, LLC ISSUED FOR BID CWA Project # 1905 MAY 10, 2019 PAGE 11 of 11

plumb, top edges level, and in alignment with other work, scribed to fit adjoining work accurately at borders and at penetrations. Comply with manufacturer's printed instructions for installation of system using type of mounting accessories indicated or, if none indicated, as recommended by manufacturer. Maintain straight seams vertical and plumb. Horizontal seams will not be permitted. Match and level fabric pattern and grain.

4. Install core materials flush with face of stretched fabric system track. Bond or fasten core material to substrate utilizing materials and methods as recommended by system manufacturer. Cutting, trimming, fitting and matching of prefinished work will not be permitted.

5. Install materials utilizing materials and methods as recommended by manufacturer unless otherwise specified.

C. Fabric Installation: Apply fabric monolithically in continuous run over area, without joints or reveals, except where panel joints or midspan frames are indicated.

1. Core Overlay: Evenly stretch over core face and edges; free from puckers, ripples, wrinkles, and sags.

2. Stretch and secure fabric to frame edges and so frame and frame attachment method are concealed by fabric unless otherwise indicated.

3. Stretch fabric taught and square without puckers, ripples, or distortions. Acclimatize and restretch if recommended by stretched-fabric system manufacturer. Repair

distortions, wrinkles, and sagging.

4. Clip loose threads; remove pills and extraneous materials.

D. Installation Tolerances:

1. Edge Straightness: Plus or minus 1/16 inch.

2. Variation from Level and Plumb: Plus or minus 1/16 inch.

3. Variation of Panel-Joint Width: Not more than 1/16 inch from hair or reveal line.

3.4 PROTECTION AND CLEANING

A. Damage Prevention: Protect fabric covered wall systems so that it will be without damage at the time of acceptance.

B. Repairing of Damage: Fabric covered wall systems which, in the opinion of the Architect, cannot be satisfactorily refinished in the field shall be removed and replaced, with units to match contiguous fabric covered wall systems in all respects.

C. Clean fabric covered wall systems upon completion of installation, to remove dust and other foreign materials from the facing, using a dry brush or a vacuum or both.

END OF SECTION

Page 13: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 10 1100

University of Connecticut VISUAL DISPLAY BOARDS

159 Discovery Drive

Storrs, Connecticut 06269

UConn Project # 991661

CHRISTOPHER WILLIAMS ARCHITECTS, LLC CLARIFICATION 6/20/19, ADDENDUM 1 CWA Project # 1905 JUNE 6, 2019

PAGE 1 of 5

SECTION 10 1100 – VISUAL DISPLAY BOARDS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Acoustic Tack board assemblies:

B. Magnetic Glass Markerboards.

1. Framed Magnetic Glass Markerboards.

2. Magnetic Glass Markerboard Accessories.

1.2 RELATED SECTIONS

A. Section 09 0913 – Paint and Painting.

B. Section 09 2117 – Gypsum Board Systems.

C. Section 09 7700 – Fabric Covered Wall Systems.

1.3 REFERENCES

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

B. ASTM B 221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes.

C. ANSI Z97.1 - Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test.

1.4 DESIGN / PERFORMANCE REQUIREMENTS

A. Fire Performance Characteristics: Comply with fire performance characteristics indicated below. Identify components with markings from testing and inspection organization. 1. ASTM E 84 (Fuel Contribution) - Class A, flame spread 5, smoke developed 25.

1.5 SUBMITTALS

A. Submit under provisions of Section 01 3000 - Administrative Requirements.

B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.

C. Shop Drawings: Provide for each type of visual display board including section details indicating trim, face material, colors, core and backing materials, dimensions, joint locations and special anchor details.

D. Selection Samples: For each finish product specified, two complete sets of color chips representing manufacturer's full range of available colors and patterns.

Page 14: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 10 1100

University of Connecticut VISUAL DISPLAY BOARDS

159 Discovery Drive

Storrs, Connecticut 06269

UConn Project # 991661

CHRISTOPHER WILLIAMS ARCHITECTS, LLC CLARIFICATION 6/20/19, ADDENDUM 1 CWA Project # 1905 JUNE 6, 2019

PAGE 2 of 5

E. Verification Samples: Submit samples not less than 12 inch square and framed on two adjacent sides, to illustrate materials, finish, color, and configuration of each type of visual display board required.

F. Manufacturer's Certificates: Certify products meet or exceed specified requirements.

G. Closeout Submittals: Provide manufacturer's maintenance instructions that include recommendations for cleaning, stain removal and maintenance of all components.

1.6 QUALITY ASSURANCE

A. Manufacturer Qualifications: Minimum 5 years documented experience manufacturing similar products.

B. Installer Qualifications: Minimum 2 years documented experience installing similar products.

C. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship. 1. Finish areas designated by Architect. 2. Do not proceed with remaining work until workmanship, color, and finishes are

approved by Architect. 3. Refinish mock-up area as required to produce acceptable work. 4. Accepted mock-ups shall be comparison standard for remaining Work

1.7 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation.

B. Handle materials to avoid damage.

1.8 PROJECT CONDITIONS

A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

PART 2 PRODUCTS

2.1 TACKBOARDS

A. Fabric Wrapped Tack Wall Panel - Noted as VSD-2 on drawing set.

1. Manufacturer:

a. Basis of Design: A to Z stores. Com – 215 Devasher Road, Russellville KY 422763 Phone: 1-888-767-7006

b. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements. PLEASE NOTE 4 -6 WEEK MIN. LEAD TIME.

Page 15: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 10 1100

University of Connecticut VISUAL DISPLAY BOARDS

159 Discovery Drive

Storrs, Connecticut 06269

UConn Project # 991661

CHRISTOPHER WILLIAMS ARCHITECTS, LLC CLARIFICATION 6/20/19, ADDENDUM 1 CWA Project # 1905 JUNE 6, 2019

PAGE 3 of 5

2. Viewing Style:

a. Fabric boards with fabric wrapped frame, no trim. SEMI-CUSTOM

1) Size: As indicated on drawings. (3) 6’-0” W x 4’ -0” HT.

2) FABRIC Square Edge-wrapped Tackable WALL panels.

3) Fabric Supplier – Guilford of Maine 5001 Kendrick St. SE, Suite B Grand Rapids, MI 49512 USA (616) 554-2250 (800) 544-0200

b. Fabric Colors: As selected by Architect from manufacturer’s standard color range. FR 701 2100, Colbalt Blue 420, for Basis of Design.

c. 100% recycled polyester 16 oz +/-, 66 inch min. usable

d. Flammability Class 1 or A

2.2 MAGNETIC GLASS MARKERBOARDS

A. Frameless Non-Magnetic Glass Markerboards:

1. Manufacturer:

a. Basis of Design: Fulbright Glass Boards; 22420 Rothwood Road, Spring, TX 77389

b. Forms & Surfaces; 30 Pine Street, Pittsburgh, PA 15223.

c. Magnatag Visible Systems; 2031 O'Neill Rd., Macedon, NY 14502

d. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements

2. Materials

a. Glass: 1/4 inch thick, low-iron, tempered, soda-lime float glass with polished beveled edge. Glass complies with ANSI Z97.1.

b. Backing: 24 gauge steel backer and aluminum (ASTM B 221, 6063 alloy with T5 temper) mounting framework with high bond adhesive used to securely attach steel to glass.

c. Finish: As selected by Architect from manufacturer’s standard color range.

3. Viewing Style:

a. Glass Markerboards- VDS-1, KEYED ON DRAWINGS

1) Size: As noted on plans

Page 16: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 10 1100

University of Connecticut VISUAL DISPLAY BOARDS

159 Discovery Drive

Storrs, Connecticut 06269

UConn Project # 991661

CHRISTOPHER WILLIAMS ARCHITECTS, LLC CLARIFICATION 6/20/19, ADDENDUM 1 CWA Project # 1905 JUNE 6, 2019

PAGE 4 of 5

4. Mounting Methods:

a. Z-bar hangers concealed to the back of the board with no visible mounting hardware. Number of Z-clips will vary from 4-12 depending on width of markerboard, PER DRAWINGS AND MANUFACTURERS INSTALLATION INSTRUCTIONS.

B. Magnetic Glass Markerboard Accessorles:

1. Mounted Aluminum Marker Caddy:

a. Colors:

1) Stainless Steel

2.3 FABRlCATlON

A. Laminate facing sheet and backing sheet to core material under pressure, using manufacturer's recommended adhesive.

B. Provide factory-assembled visual display boards, except where sizes demand partial field assembly.

C. Assemble units in one piece without joints, wherever possible. Where required dimensions exceed maximum panel size available, provide two or more pieces of equal length, as indicated on approved shop drawings. Assemble to verify fit at factory, then disassemble for delivery and final assembly at project site.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that substrates are properly prepared to receive visual display boards.

B. Do not begin installation until substrates have been properly prepared.

C. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

3.2 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.3 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Where visual display boards must be partly assembled at project site, use factory-supplied H-bar to maintain proper alignment.

C. Install visual display boards level and plumb, keeping perimeter trim aligned in accordance with manufacturer's recommendations.

Page 17: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

IPB Tech Quad Phase III SECTION 10 1100

University of Connecticut VISUAL DISPLAY BOARDS

159 Discovery Drive

Storrs, Connecticut 06269

UConn Project # 991661

CHRISTOPHER WILLIAMS ARCHITECTS, LLC CLARIFICATION 6/20/19, ADDENDUM 1 CWA Project # 1905 JUNE 6, 2019

PAGE 5 of 5

3.4 ADJUSTING AND CLEANING

A. Verify that all accessories are installed as required for each unit.

B. Upon completion of installation, clean surfaces and trim in accordance with manufacturer's recommendations, leaving all materials ready for use.

3.5 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before Substantial Completion.

END OF SECTION

Page 18: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

THIRD FLOOR688' - 6"

8

313

PT-1

F

RWB-1

PT-1

FG

FIN

ISHE

D SI

LL

EXIS

TING

AFB-1

E2.12

1' - 9 13/16"4' - 0"4' - 0"4' - 0"11' - 0 5/16"4' - 0"4' - 0"4' - 0"1' - 9"

8' - 0

"

1' - 6

" 3' - 6

"

VDS-1VDS-1VDS-1VDS-1 VDS-1

MWB-1

PT-1

VDS-1

C3.03

3' - 8 1/4"3' - 8 1/4"3' - 7 7/8"

B4A-602

A4A-602

A3A-602

Sim

A4A-504

9 10

31' - 9 3/4"

C3.02

317.2

AFB-1

EQ. 8' - 8" 8' - 0" 8' - 8" EQ.

3' - 6

"

317.1

MWB-1MWB-14'

- 0"

E2.15

E2.10E2.10

A4A-602

EQ EQ EQ

1' - 6" VIF 1' - 6"

EQ EQ

VDS-1VDS-1

8' - 8"

8' -

3"

25' - 4"

A2A-602

SimA3

A-602

Sim

AFB-1

F GA4

A-504

317.3

VDS-2 VDS-2 VDS-2

EQ EQ

3' - 6

"4'

- 0"

MWB-1 C3.02 C3.01MWB-1E2.10

6' - 0"0"6' - 0"0"6' - 0"

TACKABLE SURFACE

3' -

6"

THIRD FLOOR688' - 6"

910

WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2WS-2WS-2WS-2 WS-2 WS-2

MWB-1

PT-1

E2.05E2.05

E2.06 E2.08

F2.02

7' -

0 7

/8"

THIRD FLOOR688' - 6"

G

AFB-1

E2.12

MWB-1

3' - 6

"

EQEQEQEQ

A4A-602

B4A-602

A6A-502

8

WS-1WS-1WS-1

PT-1

DE

RWB-1

PT-1

D E

RWB-1

PT-1

2

THIRD FLOOR688' - 6"

G

E2.12

3' - 6

"

MWB-1

PT-1

LARGER MONITOR -COORDINATE, WALL BRACKET, SWITCHES, OUTLETS & TEMP. CONTROLS CLEARANCE PRIOR TO INSTALLATION

1' - 6 1/8" 5' - 1 1/2"

3' - 0"

DOOR STOP

324A

CLEAR

3' - 7"

VERIFY FINAL LOCATION

6' - 1 3/4"

5' - 1 1/2"

LEVEL 1- LOCATION PLAN644' - 6"

C3.07

EXISTING FE (NIC)

C7.09

PAINT TO NEAREST CONTROL JOINT, TYPICAL FOR ALL NEW OPENINGS

THIRD FLOOR688' - 6"

C

A6A-502

3' -

6"

VIF 5' - 6"

MONITOR

E2.12

THIRD FLOOR688' - 6"

SIGNAGE ( TYP) SEE SCHEDULE

CARD READERS, SEE ELECTRICAL

PAINT TO NEAREST CONTROL JOINT, TYPICAL FOR ALL NEW OPENINGS

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511

203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

1. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of all Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. Where a conflict within the Contract Documents exists, the Contractor shall provide the better quality or greater quantity of work in accordance with the Architect's resolution without any increase in the Contract sum. Organization of the Specifications into divisions, sections and articles, and arrangement of sheets shall not control the Contractor in dividing the work among subcontractors, or in establishing the extent of Work to be performed by any trade.

2. REFERENCE KEY NOTES and SHEET KEY NOTES are intended to indicate and clarify the extent and requirements of the Work; they do not indicate every location or occurence of required Work. The lack of a key note to an individual item of Work will not relieve the Contractor of responsibility to execute that Work as part of the Contract when the requirement for that Work can be logically inferred by other parts of the Contract Documents

3. Do not scale drawings, except for estimation and approximation purposes.

4. This is an existing building; all conditions and critical dimensions must be field verified.

GENERAL NOTES

1/4" = 1'-0"

6/20/2019 3:43:07 PMC:\U

sers\dnazarko\Docum

ents\1905 - 3RD FLR FITO

UT U

CON

N-IBP_Central_dnazarko.rvt

INTERIOR ELEVATIONS

A-201

04/03/19

901-661

Tech Quad Phase III-InnovationPartnership Building

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

05/10/19

1/4" = 1'-0"A1 OFFICES & SERVER RM 313 - EAST 1/4" = 1'-0"A3 OFFICES & SERVER RM 313 - SOUTH

1/4" = 1'-0"A6 MEETING RM 317 - NORTH

1/4" = 1'-0"B3 MEETING RM 317 - EAST 1/4" = 1'-0"B6 MEETING RM 317 - SOUTH

1/4" = 1'-0"C4 MEETING RM 317 - WEST

0' 8' 16' 32' 48'4'0' 8' 16' 32' 48'4' 0' 8' 16' 32' 48'4'

1/4" = 1'-0"C5 CONF. RM 313A - SOUTH 1/4" = 1'-0"C6 CONF. RM 313A - WEST

KEYNOTES

C3.01 PROVIDE SCHEDULED BASE ON ALL COL ENCLOSURESC3.02 RETURN WALL BASE AROUND JAMB INTO DOOR FRAME, BOTH SIDES

OF PARTITIONC3.03 WALL BASE ON PLYWD SUBSTRATE ON WALLS WITH VISUAL PER

DETAILSC3.07 RELOCATE EXISTING SIGN TO ACCOMMODATE NEW DOOR OPENINGC7.09 RELOCATE EXISTING SWITCH & CARD READER TO ACCOMMODATE

LARGER OPENING, SEE ELECTRICAL DRAWINGSE2.05 COORDINATE PULL CHAINS LOCATIONS PER ROOM CONDITION-

CONFIRM IN THE SUBMITTALE2.06 COORDINATE FULL SHADE LENGTH PER LOCATION.E2.08 EXTEND SHADES BEHIND COLUMNS, (TYP)E2.10 AV EQUIPMENT, INCLUDING MONITORS, AV RACK, SPEAKERS &

CONTROLS PROVIDED BY UCONN. PATHWAYS, WIRING & POWERPROVIDED BY GC. REFER TO ELECTRICAL DWGS & SPECS. FORINCLUDED SCOPE. COORDINATE WITH AV DWGS & SPECS.

E2.12 WALL MOUNTED MONITORS PROVIDED BY UCONN. VERIFY FINALLOCATIONS & SIZES.

E2.15 SEPARATE WALL MOUNTED LIGHTING, AV & MOTORIZED SHADECONTROLS. FINAL LOCATIONS TO BE DETERMINED BY ARCHITECT 7COORDINATED W/ AV CONTRACTOR.

F2.02 REMOVE AND SALVAGE F.A DEVICES FOR RELOCATION. REFER TO MEPDOCUMENTS.

1/4" = 1'-0"D4 OFFICE 316 - NORTH 1/4" = 1'-0"D6 OFFICE 316 - SOUTH

0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4'0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4' 1/4" = 1'-0"E4 OFFICE 324A - NORTH0' 8' 16' 32' 48'4'

REVISIONS:MARK DATE DESCRIPTION

1 6/06/19 ADDENDUM 12 6/13/2019 ADDENDUM 2

1/4" = 1'-0"E6 1ST FLOOR - COORDIOR -DR 124 1/4" = 1'-0"E5 ELEVATION - AF OFFICE 316 B

2

2

2

1/4" = 1'-0"E3 CORRIDOR C3C - NEW OPENINGS (TYP.)

2

2

Page 19: TIME: 2:00 p.m. Project Number: 90661 LOCATION: University of ... DOCUMENTS/90166… · CWA Project # 1905 MAY 10, 2019 PAGE 1 of 11 SECTION 09 7700 – FABRIC COVERED WALL SYSTEMS

WRAP FABRIC AT ALL CORNERS

PART

ITIO

N

SCHE

DULE

D

CONCEALED Z-CLIP MOUNTING HARDWARE

SCHEDULED OR EXIST PARTITION

STN. STEEL 3" BASE

3 1/4"

FABRIC WRAPPED AROUND, NO VISIBLE TRACK SYSTEM, BY MAUNFACTURER

WRAP FABRIC AT ALL CORNERS

PART

ITIO

N

SCHE

DULE

D

FABRIC WRAPPED AROUND, PANEL- NO VISIBLE TRACK SYSTEM SEE INT ELEV FOR SIZES

FABRIC WRAPPED AROUND, NO VISIBLE TRACK SYSTEM FABRIC WRAPPED AROUND,

NO VISIBLE TRACK SYSTEM

AFF - PER INTERIOR ELEVATION

VDS-2

4

NO VISIBLE FRAME

PART

ITIO

N

SCHE

DULE

D

MTL. BASE BELOW

"PADDED OUT" GYP. BOARD W/ REVEAL , TYP. SEE INTERIOR ELEVATIONS

PAINTED WALL PER SCHEDULE

"MUD-ON" CONT MTL J BEAD, ALL EDGES

BUILD-OUT WALL W/ 1 LAYER OF 5/8" GYP BD AROUND GLASS VISUAL DISPLAY PANELS (VDS-1), OR FABRIC PANEL - AFB-1

1/4" VERTICAL REVEAL

Z-CLIP MOUNTING HARDWARE

1/4" GLASS MARKER BOARD, SEE SPECIFICATIONS FOR COMPANY. SEE INTERIOR ELEVATIONS FOR MOUNTING HT. & SIZES

PAINT BLOCKING BLACK

1/2 " RUBBER BUMPER, EVERY 1' FOR ADDED CUSHION & SUPPORT

1/2"

3"

PAINTED WALL PER SCHEDULE

ALIGN W/ WALL5/8"

ST STL BASE ON 5/8" PLYWD SUBSTRATE

1/4"

"MUD-ON" CONT MTL J BEAD ALL EDGES

BUILD-OUT WALL W/ 1 LAYER OF 5/8" GYP BD AROUND GLASS VISUAL DISPLAY PANELS

3" HT. STN/STEEL CONTINUOUS BASE

REFER TO ELEV.T.O. FINISH FLOOR

FABRIC PANEL TO BE TUCKED INTO TRACK SYSTEM CLAMP

1" WELTLESS EDGE TRACK TO BE USED AT THE ALL PERIMETERS REVEAL- HOLDING CLIP

ACOUSTIC BOARD TO BE SECURED PER DETAIL. FASTENERS TO BE INVISIBLE FROM VIEW

1/4" FURRING STRIP FOR MOUNTING FABRIC TRACK

SCHEDULED PARTITION PANEL MOUNTING SYSTEM

MIN.7/8"

PAINT BLOCKING BLACK

1/2"

3" BASE TO RUN CONTINIOUS TO WALL BEYOND

FABRIC PANEL TO BE TUCKED INTO TRACK SYSTEM CLAMP

1" FABRIC PANEL TRACK SYSTEM

1" ACOUSTIC BOARD TO BE SECURED TO WALL WITH IMPALING PINS

1/4" FURRING STRIP FOR MOUNTING FABRIC TRACK

REFER TO ELEV.B.O. CEILING CONCEALED REVEAL, PER

ELEVATION & WALL CONDITION

1/2"

MIN.7/8"

AFB-1

PAINTED WALL PER SCHEDULE

ALIGN W/ WALL5/8"

ST STL BASE ON 5/8" PLYWD SUBSTRATE

"MUD-ON" CONT MTL J BEAD ALL EDGES

BUILD-OUT WALL W/ 1 LAYER OF 5/8" GYP BD, SEE INTERIOR ELEVATIONS FOR

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511

203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

3" = 1'-0"

6/20/2019 3:24:56 PMC:\U

sers\dnazarko\Docum

ents\1905 - 3RD FLR FITO

UT U

CON

N-IBP_Central_dnazarko.rvt

FINISH & SIGNAGESCHEDULES

A-602

10/05/18

901-661

Tech Quad Phase III-InnovationPartnership Building

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

05/10/19

ROOM FINISH SCHEDULEROOM

FLOOR BASE

WALLS

CEILING NOTESNO. NAME NORTH EAST SOUTH WEST

0 NIC NIC NIC NIC NIC

301 OFFICE

302 OFFICE

304 OFFICE

305 CONF

313 OFFICES & SERVER RM PC-1 RWB-1 P-1 P-1 P-1 NEW GL WALL SEE RCP. PAINT DARK GREY COLOR #________ ABOVE OPEN GRID LINE AND CEILING

313A CONFERENCE RM CT-1 MWB-1 P-1 NEW GL WALL AFB-1 P-1 ACT-2 FABRIC PANEL SYSTEM - BEHIND MONITORS, SEE INTERIOR ELEVATIONS

316 OFFICE CT-1 RWB-1 NEW GL WALL P-1 P-1 P-1 ACT-1

316A OFFICE CT-1 RWB-1 PT-1 P-1 P-1 NEW GL WALL GYP

316B OFFICE CT-1 RWB-1 PT-1 P-1 P-1 NEW GL WALL GYP

317 MEETING RM CT-1 MWB-1 P-1 P-1 P-1 P-1 SEE RCP. ACT-2 AND ACT-1, SEE CEILING PLAN

318 SHELL SPACE NIC NIC NIC NIC NIC NIC

318 ELEVATOR NIC NIC NIC NIC NIC NIC

319A OFFICE CT-1 MWB-1 PT-1 P-1 P-1 EXISTING GL GYP

319B OFFICE CT-1 MWB-1 PT-1 P-1 P-1 EXISTING GL GYP

319C OFFICE CT-1 MWB-1 P-1 P-1 P-1 EXISTING GL GYP

324A OFFICE CT-1 MWB-1 SEE NOTE EXISTING GL P-1 P-1 GYP FABRIC PANEL SYSTEM - BEHIND MONITORS, SEE INTERIOR ELEVATIONS

324B OFFICE CT-1 MWB-1 PT-1 EXISTING GL P-1 P-1 GYP

324C OFFICE CT-1 MWB-1 PT-1 EXISTING GL P-1 P-1 GYP

325A ELEC.

C3C CORRIDOR NIC SEE NOTE SEE NOTE NIC NIC

FINISH PRODUCTS & MATERIALSPRODUCT

IDENTIFIERSPEC.

SECTION PRODUCT DESCRIPTION MANUFACTURERMANUFACTURER'S PRODUCT

IDENTIFIACTIONCOLOR/FINI

SH NOTES

ACT-1 09 5100 ACCOUSTICAL CEILING PANEL ARMSTRONG SILHOUETTE 1/4" XL REVEAL 9/16" SLOTTED TEE SYSTEM (ARMSTRONG)

ACT-2 09 5100 ACOUSTICALL CEILING PANEL ARMSTRONG

AFB-1 09 7700 ACOUSTICAL FABRIC BOARD KNAUF / KVADRAT /MAHARAM

HIGHFIELD BY KVADRAT - 465957 744 - DARKBLUE

SEE SPECIFICATION SECTION 09 7700 - MATCHES PREVIOUSLY INSTALLEDCONFERENCE RM WALLS

CT-1 09 6800 CARPET TILE BENTLEY SHAPESHIFTER 400021/WAVEFORM

GL-1 08 8000 1/2 IN. GLAZING AT GLASS PARTITION

GL-3 08 8000 GLAZING AT FRAMED GLASS DOOR

MWB-1 09 6800 METAL WALL BASE STN/STL MATCH EXISTING WALL BASE. 3" HIGH

PC-1 03 3500 POLISHED CONCRETE - -

PT-1 09 0913 PAINT ON GWB PPG INTERIOR / EXTERIOR PRIMER INTERIORLATEX

SEE SPECIFICATION SECTION 090913

PT-2 09 0913 PAINT AT 12'-0" AND ABOVE PPG 6-500 PURE PERFORMANCE INTERIORLATEX

SEE SPECIFICATION SECTION 090913

PT-3 09 0913 PAINT ON HOLLOW METAL DOORS AND FRAMES PPG INTERIOR / EXTERIOR PRIMER INTERIORLATEX

SEE SPECIFICATION SECTION 090913

PT-4 09 0913 PAINT ON EXPOSED IRON OR STEEL INCLUDING METAL DECK PPG INTERIOR / EXTERIOR PRIMER INTERIORLATEX

SEE SPECIFICATION SECTION 090913

RWB-1 09 6800 RUBBER WALL BASE MANNINGTON OPTIMUM EDGE

VDS-1 10 1100 GLASS MARKER BOARDS FULLBRITE SEE SPECIFICATION SECTION 101100

VDS-2 10 100 TACK BOARDS ATOZSTORES.COM SUPPLIER SUPPIES W/ FINISHEDFABRIC

FFABRIC-FR701 2100

SEE SPECIFICATION SECTION 101100- CUSTOM FABRIC WRAPPED TACK WALLPANEL

SIGNAGE SCHEDULE

Mark

FromRoom:

NumberFrom Room:

NameTo Room:Number To Room: Name

T3R 319A OFFICE

T3S 319B OFFICE

T3T 319C OFFICE

T3V 324C OFFICE

T3W 324B OFFICE

T3X 324A OFFICE

T3Y 317 MEETING RM

T3Z C3C CORRIDOR 317 MEETING RM

T3AA C3C CORRIDOR 317 MEETING RM

T3BB C3C CORRIDOR 313 OFFICES &SERVER RM

T3CC 316 OFFICE C3C CORRIDOR

T3EE

T3FF

T3GG 313 OFFICES &SERVER RM

313A CONFERENCE RM

3" = 1'-0"A6 TACKABLE WALL PANEL DETAILS- VDS-2

3" = 1'-0"B3 PLAN DETAIL- MARKER & FABRIC PANEL- VDS-1

3" = 1'-0"A3 SECTION DETAIL- MARKER BD 3" = 1'-0"A4 FABRIC PANEL- @MTL BASE- AFB-1

3" = 1'-0"B4 FABRIC PANEL CEILING DETAIL- AFB-1

0' 4" 8" 1'-0" 0' 4" 8" 1'-0" 0' 4" 8" 1'-0"

0' 4" 8" 1'-0"0' 4" 8" 1'-0"

3" = 1'-0"A2 SECTION DET.-GYP. BD BUILD OUT

0' 4" 8" 1'-0"

AFB-1

VDS-1

REVISIONS:MARK DATE DESCRIPTION

4 06/20/2019 CLARIFICATION

4

4