Transcript of Timberlane School Field Restoration Project Middle School Freshman JV.
![Page 1: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/1.jpg)
T imber lane Schoo lF ie ld Res to ra t i on P ro jec t
Middle School Freshman
JV
![Page 2: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/2.jpg)
Tonight
• To review JV/ Middle School Baseball Field proposed renovation donation:• Dugouts• Batting cages• General Field Improvements• Long term Goals
• Proposed value
• Phase one: $19,369.25• Phase two: $20,366.00
![Page 3: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/3.jpg)
Quick update
What we’ve accomplished so far!
![Page 4: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/4.jpg)
Where We Started
![Page 5: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/5.jpg)
Day 1 irrigation
![Page 6: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/6.jpg)
Shine on me!
![Page 7: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/7.jpg)
Phase 1
Two 9’ x 50’ dugouts
Construction to be supervised by Jim Hughes and Angelo Fantasia
Construction•Reinforced Concrete Pads•8’ CMU three courses high•2 X 6 stick Construction
Proposed Cost $19,369.25
![Page 8: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/8.jpg)
Phase 2 Batting CagesTwo 70’ X 16’ x12’ Batting Cages
Internal Net to fit inside cages
Increased value at practices
Saves on existing infrastructure
Access from dug out directly into batting cage
Proposed Cost $20,366.00
![Page 9: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/9.jpg)
Batting Cage
T
Dugout
Dugou
tSeat
s
Seats
Battin
g Cage
310’
350’
![Page 10: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/10.jpg)
Design Advantages
Batting Cages:
Extensions of backstop
Used as on deck circle
and bullpen
Increase efficiency of
practice time
Dugouts:
Provides a dry and
sheltered area for players
Adds separation
from students and fans
![Page 11: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/11.jpg)
Field Needs
Long Term Project
•Bleachers•Outfield fence•Lights
![Page 12: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/12.jpg)
Proposed Screening
Serves three purposesPrivacy from Batting cages and other
fields.Mode of corporate donationsTeam logo
![Page 13: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/13.jpg)
Proposed Value
JV FIELD RESTORATIONItem Materials Total cost Alt Extension
Dug outs 2 x 50' x 12' 2x6x8 with 4x8 siding 1,259.65$ 2,519.30$ 8" CMU 375.00$ 750.00$ Paint/ nials/ rental 925.00$ 925.00$
roof 1,857.00$ 3,714.00$ Timbertech benches 1,885.95$
Pad 1,250.00$ 2,500.00$ Labor 3,537.50$ 7,075.00$
Footings and foundation Total Dug out 19,369.25$
Fence /Poles batting cages 9,585.00$ 19,166.00$ 19,166.00$
Netting 1,200.00$
20,366.00$
![Page 14: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/14.jpg)
Master Plan
Parent Participation
• Communications• Participation• Fund Raising• Team Building
projects• Short Term Field Plan• Long Term Plan
Donations
• Corporate Sponsorships
• Donation acknowledgement
• Sign of recognition• Corporate
involvement• Fund raising
activities
![Page 15: Timberlane School Field Restoration Project Middle School Freshman JV.](https://reader033.fdocuments.net/reader033/viewer/2022050714/56649cbe5503460f9498402e/html5/thumbnails/15.jpg)
Value vs. Cost
• Batting cages– Cost to contract = $20,366.00–Material Cost:• Fence $ 1000.00• Misc. $ 200.00• Net $ 650.00• Labor $ 0.00 ____________Total cost $1850.00