Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

TIA-AR-001Georgia Multimodal Passenger Terminal - Property Acquisition and Associated Surface Street Improvements Transit 50,000,000$

TIA-AR-002Howell Junction Rail Interchange Improvements - Concept Design and Environmental Documentation Transit 20,000,000$

TIA-AR-004 SR 92 from Jimmy Mayfield Boulevard to SR 85 (South Glynn Street) - Widening Roadway 7,000,000$

TIA-AR-005US 29 (Roosevelt Highway) from SR 279 (Old National Highway) to SR 6 (Camp Creek Parkway) - Widening Roadway 15,000,000$

TIA-AR-006US 29 (Roosevelt Highway) from SR 279 (Old National Highway) to SR 14 Spur (South Fulton Parkway) - Widening Roadway 27,000,000$

TIA-AR-008 US 19/41 (Tara Boulevard) from SR 81 to Woolsey Road - Widening Roadway 65,400,000$

TIA-AR-011US 41 (Northside Drive) from Ivan Allen Boulevard / Joseph E. Boone Boulevard to I-75 North - Widening and Multimodal Complete Street Improvements Roadway 30,700,000$

TIA-AR-012 I-285 West from I-20 West to SR 70 (Bolton Road) - Collector/Distributor Lanes Roadway 43,774,103$ TIA-AR-013 SR 20 (Knox Bridge Highway) from SR 108 (Fincher Road) to I-575 - Widening Roadway 109,500,000$ TIA-AR-014 US 23 from SR 138 (North Henry Boulevard / Stockbridge Road) to I-675 - Widening Roadway 29,694,229$ TIA-AR-017 I-285 West at SR 280 (South Cobb Drive) - Interchange Improvements Roadway 22,260,677$

TIA-AR-018 Old Covington Highway from SR 124 (Turner Hill Road) to Lake Capri Road - Widening Roadway 7,803,983$

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

Page 2 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AR-020I-285 North from Ashford Dunwoody Road to SR 141 (Peachtree Industrial Boulevard) - Collector/Distributor Lanes Roadway 186,000,000$

TIA-AR-021 I-285 North from US 23 (Buford Highway) to I-85 North - Collector/Distributor Lanes Roadway 34,000,000$ TIA-AR-022 I-285 South at SR 155 (Flat Shoals Highway) - Interchange Improvements Roadway 28,613,971$ TIA-AR-023 I-285 East at I-20 East - Interchange Improvements Roadway 94,571,799$

TIA-AR-024State Bridge Road / Pleasant Hill Road from SR 141 (Medlock Bridge Road) to Chattahoochee River - Widening Roadway 10,000,000$

TIA-AR-026 I-285 South at Washington Road - Interchange Improvements Roadway 25,000,000$ TIA-AR-027 I-85 South at SR 138 (Jonesboro Road) - Interchange Improvements Roadway 28,061,993$ TIA-AR-029 SR 138/20 (Walnut Grove Road) at I-20 East - Interchange Improvements Roadway 48,923,200$ TIA-AR-030 I-285 North at SR 400 - Interchange Improvements Roadway 500,000,000$

TIA-AR-031SR 138 (Stockbridge Highway) from East Fairview Road to Ebenezer Road / Stanton Road - Widening Roadway 58,000,000$

TIA-AR-032 SR 138 (Walnut Grove Road) from Dennard Road to Newton County Line - Widening Roadway 20,000,000$ TIA-AR-033 SR 81 (Keys Road) from Downtown McDonough to Old Jackson Road - Widening Roadway 30,700,000$ TIA-AR-034 Amtrak Station Relocation Transit 38,000,000$ TIA-AR-035 I-75 / I-575 Managed Lanes - Engineering and Right-of-Way Assistance Roadway 50,000,000$

Page 3 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AR-037 MARTA North Heavy Rail Line Extension to SR 140 Transit 839,000,000$

TIA-AR-038Cheshire Bridge Road at Lindbergh Drive - Intersection and Multimodal Complete Street Improvements Roadway 3,000,000$

TIA-AR-039US 78 (Ponce de Leon Avenue) at US 23 (Moreland Avenue / Briarcliff Road) - Intersection and Multimodal Complete Street Improvements Roadway 4,200,000$

TIA-AR-040 I-85 North at I-285 - Interchange Improvements Roadway 53,000,000$ TIA-AR-041 GRTA Xpress System - Capital and Operations Funding for Existing Services Transit 180,100,000$ TIA-AR-042 GRTA Xpress System - Capital and Operations Funding for System Expansion Transit 316,700,000$ TIA-AR-043 Regional Vanpool Program Assistance Transit 2,816,000$

TIA-AR-044Regional Mobility Call Center and Enhanced Transportation Services for Older Adults and Persons with Disabilities Transit 17,000,000$

TIA-AT-001(1) Anderson Avenue at CSX Rail Line and MARTA West Line - Bridge Replacement Roadway 5,290,018$

TIA-AT-001(3) Centennial Olympic Park Drive from CNN Center to Mitchell Street - Bridge Upgrade Roadway 58,672,069$ TIA-AT-001(4) Central Avenue at CSX Rail Line and MARTA East Line - Bridge Replacement Roadway 27,035,981$ TIA-AT-001(5) Courtland Street at CSX Rail Line and MARTA East Line - Bridge Replacement Roadway 45,725,112$ TIA-AT-001(6) Edgewood Avenue at Southern Rail Line (Future Belt Line) - Bridge Replacement Roadway 8,649,702$ TIA-AT-001(7) Edgewood Avenue at Airline Street - Bridge Upgrade Roadway 2,175,000$

Page 4 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AT-001(10) Martin Luther King, Jr. Drive Between Forsyth Street and Spring Street - Bridge Replacement Roadway 19,317,480$

TIA-AT-001(11) Martin Luther King, Jr. Drive Between Mitchell Street and Spring Street - Bridge Replacement Roadway 49,420,199$ TIA-AT-001(13) Nelson Street Between Elliott Street and Spring Street - Bridge Replacement Roadway 17,783,403$ TIA-AT-001(14) Pryor Street at CSX Rail Line and MARTA East Line - Bridge Replacement Roadway 32,126,809$ TIA-AT-001(17) West Lake Avenue at CSX Rail Line and MARTA West Line - Bridge Replacement Roadway 5,111,702$

TIA-AT-001(18)DeKalb Avenue from Jackson Street to Oxford Place - Reversible Lane Equipment Modernization Roadway 1,336,053$

TIA-AT-001(19)SR 154 (Memorial Drive) from Pearl Street to Whitefoord Avenue - Reversible Lane Equipment Modernization Roadway 683,419$

TIA-AT-001(20)Andrew Young International Boulevard from Centennial Olympic Park Drive to Piedmont Avenue - Corridor Improvements Roadway 747,533$

TIA-AT-001(21) Baker Street from Luckie Street to Piedmont Avenue - Corridor Improvements Roadway 473,437$

TIA-AT-001(22) Capitol Avenue from Martin Luther King, Jr. Drive to Fulton Street - Corridor Improvements Roadway 335,340$

TIA-AT-001(23) Central Avenue from Edgewood Avenue to Dodd Avenue - Corridor Improvements Roadway 1,173,691$

Page 5 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AT-001(24) Courtland Street from North Avenue to Martin Luther King, Jr. Drive - Corridor Improvements Roadway 1,257,526$ TIA-AT-001(25) Decatur Street from Peachtree Street to Gunby Street - Corridor Improvements Roadway 1,006,153$ TIA-AT-001(26) DeKalb Avenue from Gunby Street to Atlanta City Limits - Corridor Improvements Roadway 2,042,422$

TIA-AT-001(27)Harris Street from Centennial Olympic Park Drive to Piedmont Avenue - Corridor Improvements Roadway 448,061$

TIA-AT-001(28) Howell Mill Road from Marietta Street to Collier Road - Corridor Improvements Roadway 948,580$ TIA-AT-001(29) Juniper Street from 14th Street to North Avenue - Corridor Improvements Roadway 766,549$ TIA-AT-001(30) Linden Avenue from Spring Street to Piedmont Avenue - Corridor Improvements Roadway 325,766$

TIA-AT-001(31) Martin Luther King, Jr. Drive from City Limits to Hill Street - Corridor Improvements Roadway 1,161,460$

TIA-AT-001(32)Marietta Boulevard from West Marietta Street to US 78 (Donald L. Hollowell Parkway) - Corridor Improvements Roadway 2,095,877$

TIA-AT-001(33) Marietta Street from West Marietta Street to Peachtree Street - Corridor Improvements Roadway 3,804,439$

TIA-AT-001(34) Memorial Drive from Peachtree Street to SR 154 (Trinity Avenue) - Corridor Improvements Roadway 399,064$

TIA-AT-001(35) North Avenue from Piedmont Avenue to Bonaventure Avenue - Corridor Improvements Roadway 1,149,625$

Page 6 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AT-001(36)Old Gordon Road from SR 70 (Fulton Industrial Boulevard) to SR 139 (Martin Luther King, Jr. Drive) - Corridor Improvements Roadway 218,530$

TIA-AT-001(37)Peachtree Center Avenue from Edgewood Avenue to Decatur Street - Corridor Improvements Roadway 67,081$

TIA-AT-001(38) Peachtree Street from 19th Street to Memorial Drive - Corridor Improvements Roadway 1,183,595$

TIA-AT-001(39) Peachtree-Dunwoody Road from City Limits to Wieuca Road - Corridor Improvements Roadway 2,915,611$

TIA-AT-001(40)Piedmont Avenue from Cheshire Bridge Road to Martin Luther King, Jr. Drive - Corridor Improvements Roadway 3,604,908$

TIA-AT-001(41) Spring Street from 14th Street to I-20 - Corridor Improvements Roadway 1,171,450$

TIA-AT-001(42)Washington Street from Martin Luther King, Jr. Drive to Memorial Drive - Corridor Improvements Roadway 176,053$

TIA-AT-001(43)West Marietta Street from Joseph E. Lowery Boulevard to Marietta Boulevard - Corridor Improvements Roadway 461,093$

TIA-AT-001(44)West Paces Ferry Road from Paces Ferry Road to SR 9 (Peachtree Road) - Corridor Improvements Roadway 2,514,280$

TIA-AT-001(45)West Peachtree Street from Ivan Allen, Jr. Boulevard to Peachtree Street - Corridor Improvements Roadway 1,501,752$

Page 7 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AT-001(46) Whitehall Street from Memorial Drive to Murphy Avenue - Corridor Improvements Roadway 498,355$ TIA-AT-001(47) 10th Street from Howell Mill Road to Monroe Drive - Traffic Signal Improvements Roadway 362,500$

TIA-AT-001(48) 14th Street from Howell Mill Road to Piedmont Road - Traffic Signal Improvements Roadway 575,000$ TIA-AT-001(49) Auburn Avenue from Peachtree Street to Boulevard - Traffic Signal Improvements Roadway 643,750$

TIA-AT-001(50)Boulevard from US 78 (Ponce de Leon Avenue) to SR 42 Spur (McDonough Boulevard) - Traffic Signal Improvements Roadway 1,150,000$

TIA-AT-001(51) Courtland Street from Linden Avenue to Gilmer Street - Traffic Signal Improvements Roadway 750,000$

TIA-AT-001(52)US 78 (Donald L. Hollowell Parkway) from SR 70 (Fulton Industrial Boulevard) to US 41 (Northside Drive) - Traffic Signal Improvements Roadway 1,025,000$

TIA-AT-001(53) Edgewood Avenue from Peachtree Street to Elizabeth Street - Traffic Signal Improvements Roadway 500,000$ TIA-AT-001(54) Howell Mill Road from I-75 North to 10th Street - Traffic Signal Improvements Roadway 512,500$

TIA-AT-001(55)Joseph E. Lowery Boulevard from West Marietta Street to SR 139 (Ralph David Abernathy Boulevard) - Traffic Signal Improvements Roadway 1,188,750$

TIA-AT-001(56)Martin Luther King, Jr. Drive from Fairburn Road to Washington Street - Traffic Signal Improvements Roadway 3,000,000$

Page 8 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AT-001(57)SR 154 (Memorial Drive) from Peachtree Street to SR 155 (Candler Road) - Traffic Signal Improvements Roadway 738,750$

TIA-AT-001(58)Monroe Drive from Piedmont Circle to US 78/278 (Ponce de Leon Avenue) - Traffic Signal Improvements Roadway 706,250$

TIA-AT-001(59)North Avenue from US 41 (Northside Drive) to US 23 (Moreland Avenue) - Traffic Signal Improvements Roadway 457,500$

TIA-AT-001(60)US 19/41 (Northside Drive) from West Paces Ferry Road to Whitehall Street - Traffic Signal Improvements Roadway 425,325$

TIA-AT-001(61)SR 9 / SR 141 (Peachtree Road) from Peachtree Dunwoody Road to Collier Road - Traffic Signal Improvements Roadway 1,713,450$

TIA-AT-001(62) Peachtree Street from Spring Street to SR 154 (Trinity Avenue) - Traffic Signal Improvements Roadway 915,000$

TIA-AT-001(63)SR 237 (Piedmont Road/Avenue) from SR 9 (Roswell Road) to Edgewood Avenue - Traffic Signal Improvements Roadway 481,875$

TIA-AT-001(64)US 78/278 (Ponce de Leon Avenue) from Spring Street to Clifton Road - Traffic Signal Improvements Roadway 618,125$

TIA-AT-001(65) Spring Street from Peachtree Street to SR 154 (Trinity Avenue) - Traffic Signal Improvements Roadway 1,292,125$

Page 9 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AT-001(66)SR 139 (Martin Luther King, Jr. Drive) from SR 280 (H.E. Holmes Drive) to Lamar Avenue - Corridor Improvements Roadway 7,395,000$

TIA-AT-001(67)Campbellton Road from SR 139 (Lee Street) to Atlanta City Limits - Traffic Signal Improvements Roadway 909,900$

TIA-AT-001(68)SR 54 (Jonesboro Road) from McDonough Boulevard to City Limits - Traffic Signal Improvements Roadway 806,625$

TIA-AT-002Avon Avenue Extension from Allene Avenue to US 19/41 (Metropolitan Parkway) - New Alignment Roadway 6,000,000$

TIA-AT-003US 78 (Bankhead Highway / DL Hollowell Boulevard) Bus Rapid Transit Between Bankhead MARTA Station in Atlanta and Douglasville - Includes Roadway Operational Improvements Transit 89,600,000$

TIA-AT-004Atlanta Beltline Streetcar Circulator and Trail - Northeast Atlanta to Downtown via Northeast Beltline Transit 234,294,534$

TIA-AT-005Atlanta Beltline Streetcar Circulator and Trail - South Buckhead to Midtown via Northeast Beltline Transit 430,332,485$

TIA-AT-006Atlanta Beltline Streetcar Circulator and Trail - Southeast Atlanta to Midtown via Southeast Beltline Transit 407,492,936$

TIA-AT-007 Atlanta Beltline Streetcar Circulator and Trail - Southwest Atlanta to Midtown Circulator Transit 508,453,428$

Page 10 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-AT-008Campbellton Road from Venetian Drive to Timothy Drive - Widening and Multimodal Complete Street Improvements Roadway 20,000,000$

TIA-AT-010 I-285 West at Greenbriar Parkway - New Interchange Roadway 36,400,000$

TIA-AT-011SR 54 (Jonesboro Road) from Thirkeld Avenue to Helena Street - Complete Street Improvements Bike/Ped 10,000,000$

TIA-AT-020

US 23 (Moreland Avenue) Bus Rapid Transit and Operational Improvements between Inman Park / Reynoldstown MARTA Station and Custer Avenue - Includes Roadway Operational Improvements Transit 36,000,000$

TIA-AT-021ASR 237 (Piedmont Road) / SR 9 (Roswell Road) between Atlanta City Limits and Lindbergh Center MARTA Station - Bus Rapid Transit and Roadway Operational Improvements Transit 46,000,000$

TIA-AT-021BSR 9 (Roswell Road) / Hammond Drive between Atlanta City Limits and Dunwoody MARTA Station - Bus Rapid Transit and Roadway Operational Improvements Transit 46,000,000$

TIA-CH-001 Bells Ferry Road at Little River - Bridge Replacement Roadway 10,223,000$ TIA-CH-002 Bells Ferry Road from Southfork Way to Victoria Road - Widening Roadway 42,746,733$

TIA-CH-004 SR 140 (Hickory Flat Highway / Arnold Mill Road) at Little River - Bridge Replacement Roadway 4,117,824$

TIA-CH-005 SR 140 (Hickory Flat Highway) from East Cherokee Drive to Mountain Road - Widening Roadway 89,240,975$

Page 11 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-CH-006 SR 140 (Hickory Flat Highway) from I-575 to East Cherokee Drive - Widening Roadway 90,392,938$ TIA-CH-007 SR 140 (Waleska Road) from Lower Burris Road to Riverstone Parkway - Widening Roadway 37,311,966$

TIA-CH-009SR 140 (Hickory Flat Highway / Arnold Mill Road) from Mountain Road to Ranchette Road - Widening Roadway 77,432,601$

TIA-CH-010 SR 20 (Cumming Highway) from I-575 to Scott Road - Widening Roadway 4,700,071$ TIA-CH-011 SR 20 (Knox Bridge Highway) at Etowah River - Bridge Replacement Roadway 5,641,006$ TIA-CH-012 SR 20 (Cumming) from Scott Road to SR 369 (Hightower Road) - Widening Roadway 86,688,856$

TIA-CH-013SR 20 (Cumming Highway / Canton Highway) from SR 369 (Hightower Road) to SR 371 (Post Road) - Widening Roadway 124,856,122$

TIA-CH-015 SR 372 (Ball Ground Road) at Etowah River - Bridge Replacement Roadway 7,720,704$ TIA-CL-001 Battle Creek Road from Valley Hill Road to Southlake Parkway - Widening Roadway 16,045,730$ TIA-CL-002 Atlanta to Griffin Commuter Rail - Region 3 (Fulton, Clayton and Henry Counties) Transit 463,602,270$ TIA-CL-004 Conley Road from I-285 to SR 54 (Jonesboro Road) - Widening Roadway 28,205,000$

TIA-CL-005 Jonesboro Connector from US 19/41 (Tara Boulevard) to Lake Jodeco Road - New Alignment Roadway 8,020,000$ TIA-CL-006 Clayton County Local Bus / Fixed Route Transit Service Transit 182,880,000$

TIA-CL-008SR 920 (McDonough Road) from SR 54 (Jonesboro Road) in Fayette County to US 19/41 (Tara Boulevard) in Clayton County - Widening Roadway 70,579,770$

TIA-CL-009 Mount Zion Boulevard from Southlake Parkway to Somerton Drive - Widening Roadway 19,549,562$

Page 12 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-CL-011 US 23 (Moreland Avenue) from Lake Harbin Road to Anvilblock Road - Widening Roadway 53,031,000$

TIA-CL-012SR 54 (Fayetteville Road) from McDonough Road in Fayette County to US 19/41 (Tara Boulevard) in Clayton County - Widening Roadway 40,088,373$

TIA-CL-013 SR 85 from Adams Drive to I-75 South (includes interchange) - Widening Roadway 33,900,000$

TIA-CL-014SR 85 from SR 279 (Old National Highway) in Fayette County to Roberts Drive in Clayton County - Widening Roadway 28,426,000$

TIA-CL-017US 19/41 (Tara Boulevard) from Upper Riverdale Road to Justice Center Boulevard - Multiuse Path Bike/Ped 10,900,000$

TIA-CL-018US 19/41 (Tara Boulevard) from I-75 South to SR 54 (Fayetteville Road) - Super Arterial Concept Roadway 254,200,000$

TIA-CL-019US 19/41 (Tara Boulevard) from SR 81 (Upper Woolsey Road) in Henry County to Flint River Road in Clayton County - Widening Roadway 36,474,770$

TIA-CL-020 Valley Hill Road at Flint River - Bridge Replacement Roadway 4,000,000$ TIA-CO-001 Busbee Frey Connector from Busbeee Parkway to Frey Road - New Alignment Roadway 20,000,000$ TIA-CO-002 Cobb Community Transit (CCT) - Bus Replacements Transit 36,825,000$ TIA-CO-003 Cobb Community Transit (CCT) - Operating Assistance Transit 200,000,000$

TIA-CO-006US 41 (Cobb Parkway) from Barrett Parkway to Bartow County - Intersection Improvements at Nine Locations Roadway 9,755,000$

TIA-CO-007 US 41 (Cobb Parkway) from Paces Mill Road to Akers Mill Road - Widening Roadway 25,700,000$

Page 13 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-CO-008 US 41 (Cobb Parkway) Transit Improvements Transit 27,500,000$

TIA-CO-009 Cumberland Boulevard from Akers Mill Road to Spring Road - Corridor Improvements Roadway 2,200,000$

TIA-CO-010 Franklin Road Connector from US 41 (Cobb Parkway) to Franklin Road - New Alignment Roadway 13,884,000$

TIA-CO-011Highlands Ridge Road / Highlands Parkway / Church Road / Plant Atkinson Road - Corridor Improvements Roadway 22,000,000$

TIA-CO-012 I-75 North at Chastain Road / Frey Road - Interchange Improvements Roadway 41,600,000$ TIA-CO-013 I-75 North at Windy Hill Road - Interchange Improvements Roadway 120,000,000$ TIA-CO-014 KSU to North Atlanta Employment Centers - Express Bus Service Transit 15,000,000$

TIA-CO-016SR 360 (Macland Road) from Paulding County Line to New Macland Road / Lost Mountain Road - Widening Roadway 31,027,000$

TIA-CO-017 Main Street at CSX Railroad - Bridge Replacement Roadway 1,900,000$ TIA-CO-018 McCollum Airport - New Air Traffic Control Tower Aviation 2,500,000$ TIA-CO-019 McCollum Airport - Property Acquisition (National Guard Site) Aviation 8,000,000$ TIA-CO-020 McCollum Airport - Runway Approach Lighting System Aviation 689,000$ TIA-CO-021 Moon Station Road at CSX Railroad - New Alignment and Overpass Roadway 4,500,000$ TIA-CO-022 Old Highway 41 at CSX Railroad - Bridge Replacement Roadway 5,000,000$

Page 14 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-CO-024 River View Road from Nichols Drive to SR 280 (South Cobb Drive) - Corridor Improvements Roadway 12,500,000$

TIA-CO-025 Riverside Parkway from SR 6 (Thornton Road) to Phillips Drive / Troon Circle - Widening Roadway 8,655,000$ TIA-CO-026 SR 120 (Roswell Road) from Bridgegate Drive to Timber Ridge Road - Widening Roadway 72,000,000$

TIA-CO-027SR 280 (South Cobb Drive) Phase 1 from River View Road / Maner Road to Atlanta Road - Widening Roadway 60,000,000$

TIA-CO-028SR 120 (South Marietta Parkway) from US 41 (Cobb Parkway) to Manget Street - Medians and Sidewalks Bike/Ped 13,647,000$

TIA-CO-029 SR 92 from Cherokee Street / Glade Road to Cowan Road - Corridor Improvements Roadway 5,975,000$

TIA-CO-030SR 92 (Dallas Acworth Highway) from Paulding County Line to US 41 (Cobb Parkway) - Widening Roadway 16,455,000$

TIA-CO-033 Transit Park and Ride Lots in Cobb County Transit 32,000,000$

TIA-CO-035 US 41 (Cobb Parkway) Fixed Guideway Transit - Phase 1 from Midtown to Cumberland Transit 917,000,000$ TIA-CO-036 Windy Hill Road from SR 5 (Austell Road) to SR 280 (South Cobb Drive) - Widening Roadway 25,000,000$ TIA-CO-037 Windy Hill Road / Terrell Mill Connector - New Alignment Roadway 26,000,000$

TIA-CO-038 US 41 (Cobb Parkway) Fixed Guideway Transit - Phase 2 from Cumberland to Town Center Transit 580,000,000$

Page 15 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-CO-039 US 41 (Cobb Parkway) from Windy Ridge Parkway to Windy Hill Road - Widening Roadway 5,250,000$ TIA-CO-040 US 41 (Cobb Parkway) from Windy Hill Road to Terrell Mill Road - Widening Roadway 2,500,000$

TIA-CO-041 US 41 (Cobb Parkway) from Terrell Mill Road to SR 120 (South Marietta Parkway) - Widening Roadway 14,395,000$

TIA-CO-042US 41 (Cobb Parkway) from SR 120 (South Marietta Parkway) to SR 120 Alternate (North Marietta Parkway) - Widening Roadway 12,426,000$

TIA-CO-043 US 41 (Cobb Parkway) at Windy Hill Road - Grade Separation Roadway 110,000,000$

TIA-CO-044 SR 280 (South Cobb Drive) Phase 2 from Atlanta Road to US 41 (Cobb Parkway) - Widening Roadway 22,000,000$

TIA-CO-045 SR 92 (Lake Acworth Drive) from US 41 (Cobb Parkway) to Cherokee Street - Widening Roadway 29,050,000$

TIA-CO-046 Windy Hill Road from SR 280 (South Cobb Drive) to US 41 (Cobb Parkway) - Widening Roadway 142,000,000$ TIA-DK-005 Dunwoody MARTA Station Area Accessibility Improvements Transit 5,350,000$ TIA-DK-007 Decatur to Clifton Corridor - Transit Connectivity and Safety Improvements Bike/Ped 10,000,000$ TIA-DK-012 Decatur Circulator Shuttle Transit 10,000,000$

TIA-DK-015Bouldercrest Road from I-285 South to Linecrest Road Extension (Under Construction) - Widening Roadway 34,190,000$

Page 16 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-016 SR 42 (Briarcliff Road) from Henderson Mill Road to Clifton Road - Corridor Improvements Roadway 41,500,000$

TIA-DK-017SR 212 (Browns Mill Road) from SR 155 (Snapfinger Road) to Rockdale County Line - Corridor Improvements Roadway 21,320,000$

TIA-DK-018SR 13 (Buford Hwy) from Lenox Road to Shallowford Terrace - Pedestrian, Landscape and BRT Improvements Bike/Ped 21,884,000$

TIA-DK-020SR 155 (Clairmont Road) from SR 141 (Peachtree Industrial Boulevard) to US 23/78 (Scott Boulevard) - Corridor Improvements Roadway 15,600,000$

TIA-DK-021Clifton Road at CSX Railroad - Bridge Replacement and Associated Improvements to Haygood Road Roadway 39,000,000$

TIA-DK-022US 278 (College Avenue) from Adair Street to North Clarendon Avenue - Corridor Improvements Roadway 8,281,000$

TIA-DK-023 Columbia Drive from US 78 (College Avenue) to I-20 East - Corridor Improvements Roadway 1,319,344$

TIA-DK-024Cooledge Road from US 78 (Stone Mountain Freeway) to US 29 (Lawrenceville Highway) - Corridor Improvements Roadway 9,100,000$

TIA-DK-025US 278 (Covington Highway) from I-285 East to SR 124 (Turner Hill Road) - Corridor Improvements Roadway 76,634,610$

TIA-DK-027East Ponce de Leon Avenue from DeKalb Industrial Way to SR 10 (Memorial Drive) - Corridor Improvements Roadway 17,745,000$

Page 17 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-029Glenwood Road from SR 155 (Candler Road) to US 278 (Covington Highway) - Corridor Improvements Roadway 14,820,000$

TIA-DK-030Hayden Quarry Road / Sigman Road Extension from Turner Hill Road to I-20 East - New Alignment Roadway 14,300,000$

TIA-DK-033North Indian Creek Drive from SR 10 (Memorial Drive) to Montreal Road - Corridor Improvements Roadway 6,500,000$

TIA-DK-035US 29 (Lawrenceville Highway) from US 23/78 (Scott Boulevard) to SR 236 (Hugh Howell Road) - Corridor Improvements Roadway 24,570,000$

TIA-DK-038 Mercer University Drive at North Fork Peachtree Creek - Bridge Replacement Roadway 2,430,000$

TIA-DK-039Montreal Road from SR 236 (LaVista Road) to Simpson Drive - Corridor Improvements (including grade separation at CSX railroad) Roadway 19,500,000$

TIA-DK-042North Druid Hills Road Connector from SR 13 (Buford Highway) to US 29 (Lawrenceville Highway) - Corridor Improvements Roadway 57,850,000$

TIA-DK-043Panola Road from SR 155 (Snapfinger Road) to Redan Road - Widening and Corridor Improvements Roadway 70,400,000$

TIA-DK-045 Rainbow Drive from SR 155 (Candler Road) to Wesley Chapel Road - Corridor Improvements Roadway 11,050,000$

TIA-DK-046Redan Road from South Indian Creek Drive to South Stone Mountain Lithonia Road - Corridor Improvements Roadway 13,000,000$

Page 18 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-047(1) Brannen Road from Fayetteville Road to Sugar Creek Place - Resurfacing Roadway 132,000$ TIA-DK-047(2) Briarlake Road from SR 236 (Lavista Road) to Briarcliff Road - Resurfacing Roadway 360,000$

TIA-DK-047(3) Briarwood Road from North Druid Hills Road to SR 13 (Buford Highway) - Resurfacing Roadway 291,000$ TIA-DK-047(4) Brockett Road from Cooledge Road to E. Ponce de Leon Avenue - Resurfacing Roadway 189,000$ TIA-DK-047(5) Central Drive from Goldsmith Road to North Hairston Road - Resurfacing Roadway 192,000$ TIA-DK-047(6) Chamblee Tucker Road from I-85 North to Shallowford Road - Resurfacing Roadway 600,000$

TIA-DK-047(7) Chupp Road from US 278 (Covington Highway) to Lithonia Industrial Boulevard - Resurfacing Roadway 291,000$

TIA-DK-047(8) Corporate Boulevard from SR 13 (Buford Highway) to I-85 Access Road - Resurfacing Roadway 84,000$ TIA-DK-047(9) Crossvale Road from Salem Road to Evans Mill Road - Resurfacing Roadway 411,000$ TIA-DK-047(10) Eastland Road from US 23 (Moreland Avenue) to Bouldercrest Road - Resurfacing Roadway 342,000$ TIA-DK-047(11) Elam Road from South Hairston Road to Rowland Road - Resurfacing Roadway 255,000$ TIA-DK-047(12) Fairington Parkway from Fairington Road to End - Resurfacing Roadway 606,000$ TIA-DK-047(13) Fair Oaks Road from SR 236 (Lavista Road) to Oak Grove Road - Resurfacing Roadway 309,000$ TIA-DK-047(14) Flakes Mill Road from Flat Shoals Parkway to South River Bridge - Resurfacing Roadway 360,000$ TIA-DK-047(15) Flakes Mill Road from South River Bridge to Henry County Line - Resurfacing Roadway 876,000$ TIA-DK-047(16) Flat Shoals Road from Fayetteville Road to Candler Road - Resurfacing Roadway 1,074,000$

Page 19 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-047(17) Frazier Road from US 29 (Lawrenceville Highway) to SR 236 (Lavista Road) - Resurfacing Roadway 312,000$ TIA-DK-047(18) Henderson Road from Henderson Mill Road to SR 236 (Lavista Road) - Resurfacing Roadway 858,000$ TIA-DK-047(19) Hillandale Drive from Evans Mill Road to End - Resurfacing Roadway 63,000$ TIA-DK-047(20) Houston Mill Road from Peachtree Creek Bridge to Mason Mill Road - Resurfacing Roadway 75,000$

TIA-DK-047(21) International Park Drive from Constitution Road to End Past Continental Way - Resurfacing Roadway 114,000$

TIA-DK-047(22) Klondike Road from SR 212 (Browns Mill Road) to Rockdale County Line - Resurfacing Roadway 330,000$

TIA-DK-047(23) Lenox Park Boulevard from North Druid Hills Road to Fulton County Line - Resurfacing Roadway 324,000$

TIA-DK-047(24) Montreal Road from Clarkston City Limits to 400 Feet North of Canadian Way - Resurfacing Roadway 159,000$

TIA-DK-047(25) Norris Lake Road from Norris Lake Drive (East) to Gwinnett County Line - Resurfacing Roadway 87,000$

TIA-DK-047(26) North Decatur Road from North Indian Creek Drive to US 23 (Clairmont Road) - Resurfacing Roadway 3,120,000$ TIA-DK-047(27) Oakcliff Road from Pin Oak Circle to Pleasantdale Road - Resurfacing Roadway 243,000$

Page 20 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-047(28) Phillips Road from South Stone Mountain Lithonia Road to South Deshon Road - Resurfacing Roadway 138,000$

TIA-DK-047(29) Pleasantdale Road from Tucker Norcross Road to Gwinnett County Line - Resurfacing Roadway 1,536,000$ TIA-DK-047(30) Second Avenue from SR 260 (Glenwood Avenue) to Flat Shoals Road - Resurfacing Roadway 444,000$

TIA-DK-047(31)Silver Hill Road from SR 236 (Hugh Howell Road) to Lilburn Stone Mountain Road - Resurfacing Roadway 237,000$

TIA-DK-047(32)South Deshon Road from Swift Creek Drive to South Stone Mountain Lithonia Road - Resurfacing Roadway 174,000$

TIA-DK-047(33) Wesley Chapel Road from US 278 (Covington Highway) to South Hairston Road - Resurfacing Roadway 636,000$

TIA-DK-048Rockbridge Road from SR 10 (Memorial Drive) to SR 124 (Rock Chapel Road) - Corridor Improvements Roadway 21,909,680$

TIA-DK-050(1)Ashford Dunwoody Road from Windsor Parkway to SR 141 (Peachtree Industrial Boulevard) - Pedestrian Improvements Bike/Ped 900,000$

TIA-DK-050(2) Brockett Road from SR 236 (Lavista Road) to Cooledge Road - Pedestrian Improvements Bike/Ped 900,000$

TIA-DK-050(3) Clifton Church Road from Bouldercrest Road to Flat Shoals Road - Pedestrian Improvements Bike/Ped 600,000$

Page 21 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-050(4)Eastland Road from US 23 (Moreland Avenue) to Bouldercrest Road - Pedestrian Improvements Bike/Ped 1,850,000$

TIA-DK-050(5)Evans Mill Road / Main Street from US 278 (Covington Highway) to Swift Street - Pedestrian Improvements Bike/Ped 650,000$

TIA-DK-050(6) Fairington Road from Panola Road to Hillandale Road - Pedestrian Improvements Bike/Ped 175,000$

TIA-DK-050(7)Fayetteville Road from Flat Shoals Road to SR 260 (Glenwood Avenue) - Pedestrian Improvements Bike/Ped 600,000$

TIA-DK-050(8) Fayetteville Road from Bouldercrest Road to Flat Shoals Road - Pedestrian Improvements Bike/Ped 520,000$

TIA-DK-050(9) Fayetteville Road from US 23 (Moreland Avenue) to Key Road - Pedestrian Improvements Bike/Ped 520,000$ TIA-DK-050(10) Flakes Mill Road from River Road to McGill Drive - Pedestrian Improvements Bike/Ped 200,000$

TIA-DK-050(11)SR 155 (Flat Shoals Parkway) from Wesley Chapel Road to Boring Road - Pedestrian Improvements Bike/Ped 600,000$

TIA-DK-050(12)Henderson Mill Road from Northlake Parkway to Chamblee Tucker Road - Pedestrian Improvements Bike/Ped 1,300,000$

TIA-DK-050(13) Linecrest Road from Clark Drive to River Road - Pedestrian Improvements Bike/Ped 675,000$ TIA-DK-050(14) McAfee Road from 2nd Avenue to Columbia Drive - Pedestrian Improvements Bike/Ped 1,200,000$

Page 22 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-050(15)Mercer University Drive from Flowers Road to Henderson Mill Road - Pedestrian Improvements Bike/Ped 650,000$

TIA-DK-050(16) Miller Road from Minola Drive to Rock Springs Road - Pedestrian Improvements Bike/Ped 380,000$

TIA-DK-050(17) Miller Road from Snapfinger Woods Drive to Minola Drive - Pedestrian Improvements Bike/Ped 250,000$

TIA-DK-050(18) Northcrest Road from Chamblee Tucker Road to Oakcliff Road - Pedestrian Improvements Bike/Ped 500,000$

TIA-DK-050(19) Oak Grove Road from SR 236 (Lavista Road) to Briarcliff Road - Pedestrian Improvements Bike/Ped 300,000$

TIA-DK-050(20)Old Johnson Ferry Road from Fulton County Line to Nancy Creek Drive - Pedestrian Improvements Bike/Ped 200,000$

TIA-DK-050(21)SR 124 (Rock Chapel Road) from Union Grove Road to Maddox Road - Pedestrian Improvements Bike/Ped 375,000$

TIA-DK-050(22)Rockbridge Road from North Clarendon Avenue to North Indian Creek Drive - Pedestrian Improvements Bike/Ped 520,000$

TIA-DK-050(23)Shadow Rock Drive from Stone Mountain Lithonia Road to Mystery Valley Drive / Nell Yates Drive - Pedestrian Improvements Bike/Ped 810,000$

TIA-DK-050(24)Stephenson Road from South Deshon Road to SR 124 (Rock Chapel Road) - Pedestrian Improvements Bike/Ped 850,000$

Page 23 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DK-050(25) Stephenson Road from Rockbridge Road to South Deshon Road - Pedestrian Improvements Bike/Ped 700,000$

TIA-DK-050(26) The By Way from SR 42 (Briarcliff Road) to Oakdale Road - Pedestrian Improvements Bike/Ped 200,000$

TIA-DK-051 SR 155 (Snapfinger Road) from Flat Shoals Parkway to River Road - Corridor Improvements Roadway 20,020,000$

TIA-DK-052Stone Mountain Lithonia Road from Rockbridge Road to Main Street in Lithonia - Bicycle and Pedestrian Improvements Bike/Ped 23,269,220$

TIA-DK-055 I-20 East at Panola Road - Interchange Improvements Roadway 21,200,000$ TIA-DK-056 I-285 South at Bouldercrest Road - Interchange Improvements Roadway 55,014,000$

TIA-DK-057 US 23 (Buford Hwy) / SR 141 (Peachtree Industrial Boulevard) Connector - New Alignment Roadway 48,492,000$ TIA-DK-059 Perimeter Center Intelligent Transportation System (ITS) Program Roadway 1,000,000$

TIA-DK-063 Chamblee Dunwoody Road from I-285 North to Spalding Drive - Corridor Improvements Roadway 14,400,000$ TIA-DK-065 Mountain View Road from SR 10 (Memorial Drive) to Sheppard Road - Sidewalks Bike/Ped 1,285,000$

TIA-DK-069 Mt Vernon Road from Fulton County Line to Dunwoody Club Drive - Corridor Improvements Roadway 20,000,000$

Page 24 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DO-002 I-20 West from I-285 West to SR 5 - ITS and Western Regional Traffic Control Center Roadway 19,000,000$ TIA-DO-003 SR 92 from Fairburn Road to Dallas Highway - Phases I, II and III Realignment Roadway 44,641,410$ TIA-DO-004 I-285 West at I-20 West - Interchange Improvements Roadway 149,000,000$ TIA-DO-005 SR 5 from Dorsett Shoals Road / Pool Road to Kings Highway - Widening Roadway 38,399,998$

TIA-DO-006 Lee Road / South Sweetwater Road from I-20 West to US 78 (Bankhead Highway) - Widening Roadway 18,900,000$

TIA-DO-007US 78 (Veterans Memorial Highway) from SR 6 (Thornton Road) to SR 92 Realignment - Widening Roadway 96,938,521$

TIA-DO-008SR 166/92 (Fairburn Road / Campbellton Road) from SR 92/166 Split in Douglas County to SR 70 (Fulton Industrial Boulevard) in Fulton County - Widening Roadway 43,632,332$

TIA-DO-009 Dorris Road Multiuse Path Phase 1 - Transportation Center to Prestley Mill Road Bike/Ped 650,000$

TIA-DO-010 Dorris Road Multiuse Path Phase 2 - Prestley Mill Road from I-20 West to Slater Mill Road Bike/Ped 2,212,700$ TIA-DO-016 Riverside Parkway from SR 92 (Fairburn Road) to SR 6 (Thornton Road) - Widening Roadway 39,720,000$

TIA-DO-017I-20 West at SR 5 (Bill Arp Road) / Bright Star Road - New Interchange / Interchange Improvements Roadway 61,000,000$

TIA-DO-018SR 6 (Thornton Road) from Paulding County Line to Riverside Parkway - Truck Friendly Lanes, ITS, Intersection Improvements and Partial Widening Roadway 45,000,000$

Page 25 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-DO-019 SR 92 (Dallas Highway) at Upshaw Mill Road - Intersection Improvements Roadway 875,000$ TIA-FA-002 Hood Avenue Connector / SR 92 Realignment - New Alignment Roadway 6,421,691$

TIA-FA-003East Fayetteville Bypass Segment 1 (South) from South Jeff Davis Road to SR 54 (East Lanier Avenue) - New Alignment and Widening Roadway 28,275,000$

TIA-FA-004East Fayetteville Bypass Segment 2 (North) from SR 54 (East Lanier Avenue) to SR 85 - New Alignment and Widening Roadway 9,113,000$

TIA-FA-005MacDuff Parkway Extension Phase 2 - New Alignment to Connect SR 54 to SR 74 - New Alignment Roadway 7,210,540$

TIA-FA-006 SR 85 Phase 1 from Bernhard Road to Grady Avenue - Widening Roadway 23,966,000$ TIA-FA-007 McIntosh Road at Flint River - Bridge Replacement Roadway 2,937,000$ TIA-FA-008 Kenwood Road at Morning Creek - Bridge Replacement Roadway 2,100,000$ TIA-FA-009 SR 54 and Commerce Drive - Intersection Improvements Roadway 1,000,000$ TIA-FA-010 South Industrial Park Path Connection Bike/Ped 1,207,701$

TIA-FA-012 Tyrone Road / Palmetto Road from SR 54 to Coweta County Line - Operational Improvements Roadway 13,252,000$ TIA-FA-013 SR 92 from Jimmy Mayfield Boulevard to McBride Road - Widening Roadway 15,915,000$ TIA-FA-014 SR 85 from Bernhard Road to SR 74 - Operational Improvements Roadway 5,838,000$ TIA-FA-015 Ebenezer Church Road at Whitewater Creek - Bridge Replacement Roadway 3,000,000$ TIA-FA-019 SR 54 West and Gateway Bridge Path Connections Bike/Ped 1,881,762$

Page 26 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-FA-022 Southeast Industrial Park Path Connection Bike/Ped 1,147,181$ TIA-FA-023 Wilshire Shopping Center / Rite Aid Tunnel Path Connections Bike/Ped 600,000$

TIA-FA-024Castlewood Road from Senoia Road to Coweta County Line - Safety Improvements and Resurfacing Roadway 498,000$

TIA-FA-025 SR 279 from SR 85 to Fulton County Line - Widening Roadway 44,663,000$

TIA-FA-026SR 92 to SR 138 Connector - New Alignment from SR 138 in Fulton County to SR 92 in Fayette County Roadway 18,300,000$

TIA-FA-027 SR 92 from McBride Road to Spalding County Line - Operational Improvements Roadway 14,150,000$

TIA-FA-028SR 92 (Forrest Avenue) from SR 85 (Glynn Street) in Fayette County to Oakley Industrial Boulevard in Fulton County - Operational Improvements Roadway 43,765,000$

TIA-FA-036 Tyrone Road from SR 74 (Joel Cowan Parkway) to SR 54 (West Lanier Avenue) - Multiuse Path Bike/Ped 2,020,000$

TIA-FN-002 SR 120 (Kimball Bridge Road) from State Bridge Road to Jones Bridge Road - Widening Roadway 21,000,000$ TIA-FN-003 SR 120 (Old Milton Parkway) from SR 400 to Kimball Bridge Road - Widening Roadway 37,000,000$ TIA-FN-004 Windward Parkway from Westside Parkway to Union Hill Road - Widening Roadway 40,000,000$

TIA-FN-005SR 120 (Old Milton Parkway) at SR 400 and Morris Road - Interchange/Intersection Improvements Roadway 1,900,000$

TIA-FN-007 Rucker Road from Hardscrabble Road to Willis Road - Operational Improvements Roadway 19,000,000$

Page 27 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-FN-010 Hammond Drive from SR 400 to Ashford Dunwoody Road - Widening Roadway 8,100,000$ TIA-FN-011 Perimeter Center Circulator System Transit 29,900,000$ TIA-FN-013 Hammond Drive from SR 9 (Roswell Road) to SR 400 - Widening Roadway 60,000,000$ TIA-FN-014 SR 400 from I-285 North to Spalding Drive - Collector Distributor Lanes Roadway 190,560,000$

TIA-FN-015 Sandy Springs Circle Extension from Allen Road to Northwood Drive - New Alignment Roadway 40,000,000$ TIA-FN-016 Peachtree Dunwoody Road from Abernathy Road to Spalding Drive - Widening Roadway 10,500,000$ TIA-FN-018 Glenridge Drive from Royer Vista Drive and High Point Road - Widening Roadway 3,500,000$ TIA-FN-019 Glenridge Drive at Roswell Road - Intersection Improvements Roadway 2,500,000$

TIA-FN-020Spalding Drive at Winters Chapel Road - Intersection Improvements (includes bridge replacement at Crooked Creek) Roadway 3,500,000$

TIA-FN-021 SR 9 (Roswell Road) at Cliftwood Drive and Carpenter Drive - Intersection Improvements Roadway 3,000,000$

TIA-FN-022SR 9 (Roswell Road) from Atlanta City Limits to Abernathy Road - Intelligent Transportation System (ITS) Improvements Roadway 4,500,000$

TIA-FN-023 Fiber Network Expansion Program in Sandy Springs for Future Traffic Signal Coordination Roadway 12,250,000$

TIA-FN-024 SR 9 (Roswell Road) from Atlanta City Limits to I-285 North - Pedestrian Improvements Bike/Ped 11,000,000$

Page 28 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-FN-026 Lake Forrest Drive from I-285 North to Atlanta City Limits - Sidewalks and Bike Lanes Bike/Ped 4,300,000$ TIA-FN-028 I-285 North and Hammond Drive Fixed Guideway Transit Service Transit 1,021,000,000$

TIA-FN-029SR 9 (Alpharetta Highway) from Hamby Road in Forsyth County to Academy Street in Fulton County - Widening Roadway 119,000,000$

TIA-FN-030 SR 140 (Arnold Mill Road) from Cherokee County Line to Rucker Road - Widening Roadway 46,000,000$

TIA-FN-032Big Creek Bridge Road (Phases 1 and 2) from Old Alabama Road to Warsaw Road - New Alignment Roadway 43,000,000$

TIA-FN-034 SR 400 at SR 140 (Holcomb Bridge Road) - Interchange Improvements Roadway 50,000,000$

TIA-FN-035SR 9 (Atlanta Street) from Chattahoochee River to SR 120 (Marietta Highway) - Widening and Corridor Improvements Roadway 20,400,000$

TIA-FN-036 SR 140 (Houze Road) from Rucker Road to Mansell Road - Operational Improvements Roadway 19,600,000$ TIA-FN-038 Perimeter Center Automated Traffic Management System (ATMS) Roadway 3,000,000$ TIA-FN-042 Jones Bridge Road from Taylor Road to Douglas Road - Widening Roadway 28,000,000$

TIA-FN-043SR 120 (Abbotts Bridge Road) from Parsons Road (east of SR 141) to Peachtree Industrial Boulevard - Widening Roadway 28,000,000$

TIA-FS-003 Hutcheson Ferry Rd at Atlanta Newnan Road and Rico Road - Roundabout Roadway 1,750,000$ TIA-FS-004 SR 6 (Camp Creek Parkway) from I-85 South to Welcome All Road - Widening Roadway 13,200,000$

Page 29 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-FS-005 Washington Road from I-285 West to US 29 (Legion Way) - Widening Roadway 34,894,208$ TIA-FS-006 Beltline Trail Extension from West End Mall Area to College Park Bike/Ped 2,125,920$ TIA-FS-007 Bus Service Between College Park, East Point, Fort McPherson and Greenbriar Transit 4,850,000$ TIA-FS-008 I-85 South at SR 74 - Interchange Improvements Roadway 22,500,000$

TIA-FS-009Oakley Industrial Boulevard from Stalwart Drive to SR 138 (Jonesboro Road) - Operational Improvements Roadway 3,169,653$

TIA-FS-010 Bohannon Road at Line Creek - Bridge Replacement Roadway 684,439$ TIA-FS-012 South Fulton Parkway at Derrick Road - Intersection Improvements Roadway 1,200,000$

TIA-FS-013Jones Road / McClures Road Connector - New Alignment (includes intersection at South Fulton Parkway) Roadway 18,600,000$

TIA-FS-014Koweta Road / Stonewall Tell Connector - New Alignment (includes intersection at South Fulton Parkway) Roadway 17,900,000$

TIA-FS-015Jones Road / Rosewood Place Connector - New Alignment (includes intersection at South Fulton Parkway) Roadway 12,900,000$

TIA-FS-016Butner Road at SR 6 (Camp Creek Parkway) Intersection Improvements and Butner Road over SR 6 (Camp Creek Parkway) Bridge Replacement Roadway 8,600,000$

TIA-FS-017SR 154/166 (Campbellton Road) at Boat Rock Road / New Hope Road - Intersection Improvements Roadway 4,300,000$

TIA-FS-018 I-285 West at Cascade Road - Interchange Improvements Roadway 23,600,000$

Page 30 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-FS-019SR 70 (Fulton Industrial Blvd) from SR 6 (Camp Creek Parkway) to Frederick Drive - Intersection Improvements at Multiple Locations Roadway 12,800,000$

TIA-FS-021Fulton County Airport (Charlie Brown Field) - Engineered Material Arresting System (EMAS) Installation Aviation 7,575,700$

TIA-FS-022 Fulton County Airport (Charlie Brown Field) - Coat/Restripe Runways Aviation 400,000$ TIA-FS-023 Fulton County Airport (Charlie Brown Field) - New Taxiways Aviation 8,797,812$

TIA-FS-024 South Fulton Pedestrian Improvements - Boat Rock Road, New Hope Road and Jerome Road Bike/Ped 11,800,000$

TIA-FS-026SR 92 (Campbellton Fairburn Road) at South Fulton Parkway and Hall Road - Intersection Improvements Roadway 7,500,000$

TIA-GW-003US 23 (Buford Highway) from George Pierce Park to McGinnis Ferry Road - Corridor Improvements Roadway 5,445,000$

TIA-GW-004US 23 (Buford Highway) from Old Peachtree Road to Sugarloaf Parkway - Corridor Improvements Roadway 14,000,000$

TIA-GW-006 US 23 (Buford Highway) from Sawnee Avenue to SR 347 in Hall County - Widening Roadway 28,000,000$ TIA-GW-007 US 23 (Buford Highway) at Jimmy Carter Boulevard - Intersection Improvements Roadway 15,000,000$ TIA-GW-011 Five Forks Trickum Road from Killian Hill Road to Oak Road - Widening Roadway 10,350,000$

TIA-GW-012 Five Forks Trickum Road from Constitution Boulevard to Sugarloaf Parkway - Widening Roadway 14,625,000$

Page 31 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-GW-016 Hamilton Mill Road from US 23 (Gainesville Highway) to SR 124 - Widening Roadway 50,700,000$

TIA-GW-017 Heavy Rail Extension from Doraville MARTA Station to Oakcliff Road / New Peachtree Road Transit 140,000,000$

TIA-GW-018 Hillcrest Road / Satellite Boulevard Connector - New Alignment and Overpass at I-85 North Roadway 19,864,000$ TIA-GW-025 I-85 North at SR 324 (Gravel Springs Road) - New Interchange Roadway 33,300,000$ TIA-GW-026 I-85 North at McGinnis Ferry - New Interchange Roadway 19,500,000$ TIA-GW-029 Killian Hill Road from Camp Creek to Arcado Road - Widening Roadway 14,900,000$

TIA-GW-030US 29 (Lawrenceville Hwy) from Hood Road to Hillcrest Road - Multiuse Trail and Pedestrian Improvements Bike/Ped 1,849,840$

TIA-GW-031 I-85 North Transit Corridor Alternatives Analysis Transit 100,000,000$

TIA-GW-032I-85 North Light Rail Transit Service from Doraville MARTA Station to Oakcliff Road to New Peachtree Road (Section 1) Transit 68,000,000$

TIA-GW-033I-85 North Light Rail Transit Service from Oakcliff Road / New Peachtree Road to Gwinnett Village (Section 2) Transit 262,500,000$

TIA-GW-034I-85 North Light Rail Transit Service from Gwinnett Village to Indian Trail Road Park and Ride Lot (Section 3) Transit 168,750,000$

TIA-GW-035I-85 North Light Rail Transit Service from Indian Trail Park and Ride Lot to Gwinnett Place Mall (Section 4) Transit 243,750,000$

Page 32 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-GW-036 I-85 North Light Rail Transit Service from Gwinnett Place Mall to Gwinnett Arena (Section 5) Transit 262,500,000$

TIA-GW-041Peachtree Industrial Boulevard at McGinnis Ferry Road, Moore Road and Suwanee Dam Road - Intersection Improvements Roadway 940,000$

TIA-GW-042 Pleasant Hill Road from Howell Ferry Road to Chattahoochee River - Widening Roadway 6,600,000$

TIA-GW-044 Ronald Reagan Parkway Extension from Pleasant Hill Road to I-85 North - New Alignment Roadway 300,000,000$

TIA-GW-046Satellite Boulevard Extension from SR 20 (Buford Drive) to Thompson Mill Road - New Alignment Roadway 45,800,000$

TIA-GW-047Satellite Boulevard / Old Peachtree Road Connector - New Alignment and Overpass at I-85 North Roadway 27,000,000$

TIA-GW-048SR 20 (Nelson Brogdon Boulevard / Cumming Highway) from Peachtree Industrial Boulevard to Chattahoochee River - Widening Roadway 40,000,000$

TIA-GW-049 SR 20 (Buford Drive) from I-985 to US 23 (Buford Highway) - Widening Roadway 4,100,000$

TIA-GW-052SR 120 (Duluth Highway) from Langley Drive to SR 317 (Lawrenceville Suwanee Road) - Widening Roadway 38,400,000$

TIA-GW-053SR 120 (Abbotts Bridge Road) from Hill Street to Proposed Hospital Connector - Corridor Improvements Roadway 2,900,000$

Page 33 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-GW-054 SR 124 (Braselton Highway) from SR 20 (Buford Drive) to Barrow County Line - Widening Roadway 160,200,000$

TIA-GW-055 SR 124 (Scenic Highway) from US 78 (Main Street) to Ronald Reagan Parkway - Widening Roadway 10,000,000$

TIA-GW-056SR 141 (Peachtree Parkway) from Peachtree Industrial Boulevard to Chattahoochee River - Widening Roadway 35,700,000$

TIA-GW-057 SR 316 at Harbins Road - Grade Separation Roadway 23,000,000$ TIA-GW-058 SR 316 at Hi Hope Road / Cedars Road - Grade Separation Roadway 47,000,000$ TIA-GW-059 SR 316 at US 29 - Grade Separation Roadway 51,000,000$

TIA-GW-060 Sugarloaf Parkway Phase 2 Extension from SR 316 to SR 20 (Buford Drive) - New Alignment Roadway 301,000,000$

TIA-GW-061Sugarloaf Parkway Extension Phase 3 from SR 20 (Buford Drive) to Peachtree Industrial - New Alignment Roadway 162,000,000$

TIA-GW-064 US 29 (Winder Highway) from SR 125 (Scenic Highway) to SR 316 - Widening Roadway 45,800,000$

TIA-GW-065US 78 (Athens Highway) from SR 84 (Grayson Parkway) in Gwinnett County to SR 81 in Walton County - Widening Roadway 29,100,000$

TIA-GW-066US 78 (East Main Street) from SR 124 (Scenic Highway) to SR 84 (Grayson Parkway) - Widening Roadway 33,700,000$

TIA-GW-067 US 78 (Main Street) at SR 124 (Scenic Hwy) - Intersection Improvements Roadway 19,088,028$

Page 34 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-GW-069 Walther Boulevard North/South Connection - New Alignment and Overpass at SR 316 Roadway 10,600,000$

TIA-GW-070 West Liddell Road / Club Drive Connector - New Alignment and Overpass at I-85 North Roadway 39,300,000$ TIA-GW-073 Xpress Transit System - Gwinnett County Local Match Transit 50,000,000$ TIA-HE-001 US 23 / SR 42 from SR 138 to Butts County Line - Widening Roadway 83,450,000$

TIA-HE-002SR 155 (North McDonough Road) from Spalding County Line to Bill Gardner Parkway - Widening (Phase 2) Roadway 10,450,000$

TIA-HE-003SR 155 (North McDonough Road) from Bill Gardner Parkway to Racetrack Road - Widening (Phase 1) Roadway 36,660,000$

TIA-HE-004 SR 155 from Turner Church Road to Kellytown Road - Widening (Phase 3) Roadway 31,167,300$

TIA-HE-005 Bill Gardner Parkway from SR 155 (North McDonough Road) to I-75 South - Widening Roadway 44,252,000$ TIA-HE-006 Bill Gardner Parkway from I-75 South to US 23 / SR 42 - Widening Roadway 11,850,000$

TIA-HE-007McDonough Parkway Extension from US 23 (Atlanta Street) to SR 20 (Conyers Highway) - New Alignment (Phases 1 and 2) Roadway 23,026,000$

TIA-HE-008SR 20/81 (Hampton Street / Keys Ferry Road) from Jonesboro Road at Norfolk Southern Railroad to Lemon Street - Extension and Upgrade of One-Way Pair through McDonough Roadway 19,310,000$

Page 35 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-HE-009 Rock Quarry Road from Eagles Landing Parkway to SR 138 - Widening Roadway 25,033,000$

TIA-HE-011Western Parallel Connector from Hudson Bridge Road to SR 920 (Jonesboro Road) - New Alignment Roadway 17,200,000$

TIA-HE-012SR 20 Extension from Richard Petty Boulevard in Henry County to SR 92 in Fayette County - New Alignment Roadway 20,750,000$

TIA-HE-014SR 920 (Jonesboro Road) from I-75 South in Henry County to US 19/41 (Tara Boulevard) in Clayton County - Widening Roadway 11,621,000$

TIA-HE-015 I-75 South at Bill Gardner Parkway - Interchange Improvements Roadway 18,900,000$ TIA-M-001 MARTA Train Control Systems Upgrade Transit 4,439,000$ TIA-M-002 MARTA Elevator and Escalator Rehabilitation Program Transit 97,535,000$ TIA-M-003 MARTA Unified Transit Communication Infrastructure Transit 84,438,000$

TIA-M-004 MARTA Passenger Information System, Audio Visual Information System and Wayfinding Transit 30,460,000$ TIA-M-005 MARTA Tunnel and Platform Lighting Upgrade Transit 27,934,000$ TIA-M-006 MARTA Tunnel Ventilation Rehabilitation Transit 700,000$ TIA-M-007 MARTA Electrical Power Rehabiliation Transit 308,831,000$ TIA-M-008 MARTA Track Rehabilitation Transit 5,592,000$ TIA-M-009 MARTA Aerial Structure Rehabilitation Transit 89,951,000$ TIA-M-010 MARTA Rail Station Rehabilitation Program Transit 312,579,000$

Page 36 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-M-011 MARTA On-Board Vehicle Security Cameras Transit 14,070,000$ TIA-M-013 MARTA Five Points Station Improvements Transit 16,515,000$ TIA-M-014 MARTA Airport Station Improvements Transit 7,125,000$ TIA-M-020 I-20 East Corridor Bus Rapid Transit Improvements - Phase A Transit 93,222,000$ TIA-M-021 I-20 East Corridor Bus Rapid Transit Improvements - Phase B Transit 103,760,000$ TIA-M-022 I-20 East Corridor High Capacity Transit from Central Atlanta to Candler Road Transit 1,026,800,000$

TIA-M-023MARTA East Heavy Rail Line Extension from Indian Creek Station to Wesley Chapel Road Near I-20 East Transit 522,500,000$

TIA-M-024 MARTA Heavy Rail Line Extension to Turner Field Transit 368,866,155$ TIA-M-025 Clifton Corridor Transit - Foundational Feeder Services and Transit Centers Transit 34,500,000$ TIA-M-028 Clifton Corridor Transit - Rail Corridor Phases 1A, 1B and 1C Transit 1,097,000,000$

TIA-M-029MARTA West Heavy Rail Line Extension from Hamilton Holmes Station to Martin Luther King, Jr. Drive Near I-285 Transit 542,100,000$

TIA-M-030 MARTA Northeast Heavy Rail Line Extension from Doraville Station to Norcross Transit 146,400,000$ TIA-M-031 Enhanced MARTA Arterial Bus Service Program Transit 354,538,550$

TIA-M-032US 29 (Roosevelt Highway) Sidewalk Improvements and SR 279 (Old National Highway) Bus Service Improvements Bike/Ped 26,790,000$

TIA-M-034 Circulator Systems in DeKalb and Fulton Counties Transit 242,950,644$ TIA-M-035 MARTA Station Access Enhancement Program Bike/Ped 29,598,999$

Page 37 of 37Prepared by Atlanta Regional Commission, with concurrence from GDOT Director of Planning

June 1, 2011

Transportation Investment Act of 2010Atlanta Region Unconstrained Project List - Sorted by Project ID

Project ID Project Name Project Type

Funding Request from Submittal* (UNDER REVIEW)

This list represents approximately $22.6 billion of proposed transportation investments approved for consideration by the Atlanta region transportation roundtable for funding under a proposed 1% sales tax to be voted upon by citizens of the 10-county region in July 2012. This list is not financially constrained to the amount of funding will the sales tax will actually generate. It includes projects requested by local governments, as well as additional projects identified by the Georgia Department of Transportation. Supplemental information on each project, including need and purpose, work scopes and location maps, will be available on fact sheets to be released through the atlantaregionalroundtable.com website on or before June 9, 2011.

* Please note that the costs for the projects submitted are currently under review and are subject to change. The amount of funding requested may not necessarily be the total cost of the entire project. In addition, the possibilities with matching local, state and federal funds for many of the projects will be a point of discussion during the project selection process this summer.

TIA-M-036 MARTA Blue/Green Heavy Rail Line Improvements Transit 130,000,000$ TIA-M-037 MARTA Regional Bus Services Program Transit 224,660,275$ TIA-M-039 Regional Transit Information Integration System Transit 3,000,000$ TIA-M-040 Variable Based Fare System Transit 47,000,000$

TIA-RO-001Sigman Road from Lester Road to Dogwood Connector - Widening and Corridor Improvements Roadway 40,072,140$

TIA-RO-003Commerce Crossing from Old Salem Road to Old Covington Highway - New Alignment and Overpass at I-20 East Roadway 22,590,000$

TIA-RO-004Old Covington Highway from Green Street to East of SR 20/138 - Widening and Reestablish Connection Roadway 4,895,935$

TIA-RO-005SR 162 (Salem Road) from Flat Shoals Road in Rockdale County to Old Salem Road in Newton County - Widening Roadway 43,065,000$

TIA-RO-006 Parker Road from Millers Chapel Road to Flat Shoals Road - Widening (Phase 3A) Roadway 4,880,775$

TIA-RO-007Old Salem Road Realignment - Relocate Intersection Away From SR 138 / SR 20 Ramps at I-20 East Interchange Roadway 28,800,000$

TIA-RO-008 Flat Shoals Road from SR 162 (Salem Road) to Old Salem Road - Widening Roadway 9,697,500$