Site Code: Date: Site Type: Activity Type: Lat:: Long: Site Address: Attendees (Complete as Appropriate) Team NAME COMPANY/TITLE Acceptance Status* Huawei Sub-Con du ND du NO * 1) Fully accepted 2) Partially accepted 3) Rejected *Snag List should be attached TI Acceptance Check List V01 MA-FO-30701 Page 1 of 7 Provisional Acceptance Testing Telecom Works Acceptance Checklist-LTE Project

description

Acceptance

Transcript of TI Provisional Acceptance Check List-(LTE) V2

Page 1: TI Provisional Acceptance Check List-(LTE) V2

Site Code: Date:  

Site Type:   Activity Type:  

Lat::   Long:  

Site Address:

   

Attendees (Complete as Appropriate)

Team NAME COMPANY/TITLEAcceptance

Status*

Huawei

Sub-Con

du ND

du NO

* 1) Fully accepted 2) Partially accepted 3) Rejected

*Snag List should be attached

Severity Levels were classified as: J: Major M: Minor

TI Acceptance Check List V01 MA-FO-30701 Page 1 of 6

Provisional Acceptance Testing

Telecom Works Acceptance Checklist-LTE Project

Page 2: TI Provisional Acceptance Check List-(LTE) V2

Provisional Acceptance TestingTelecom Works Checklist-LTE Project

Severity Level Work Item / Check

Checked Item Failure Comments / Qualifying

InformationNo Snag

Comply

Do not Compl

y

eNodeB Installation– (For New BTS3900 & APM30H installation scenarios)

J Stability of Cabinet should proper.

M (Outdoor Node B only) Cabinet should correctly mount with specified size bolts. (Galvanized or stainless steel only)

M Is the Locking mechanism & door fitted and functioning correctly?

J Cabinet positioning in shelter should be as per design.

M Cabinet Grounding should be tight and proper.

J Optical Fiber, power & grounding cables routing should be proper (Optical Fiber cable shouldn’t route with other cables from out of eNodeB).

eNodeB Modules & Internal Cables Installation (For New BTS3900 & APM30H installation scenarios)

M All Modules including PMU module, Battery Modules, FAN Modules & RFU subrack installation should be proper (all screws present and tightened).

J Internal Cabling including CPRI, Alarm Signal Cables, BBU power cables and connectors should install properly & tied.

M Necessary Labelling of cables & modules should exist (Ext Alarm cables, Sensors, ect..).

BBU cards/DCDU Installation

J The installation position of the BBU/DCDU strictly complies with the engineering design.

J The installed breakers in Rectifier module should meet the needs of eNodeB power consumption which is larger than 50A.

M Required boards are installed on existing BBU in correct positions as per design.

M All the bolts should tight. Both the spring washer and the flat washer are installed in the correct sequence.

J All cards should be neat and clean.

J All labels, tags and name plates are correct, legible and complete.

RRU Installation

J The RRU is securely installed.

J None of power cables and GND cables can’t be short-circuited or reversely connected. In addition, these cables are not damaged or broken.

J Power cables and GND cables should separately bound from other cables.

J Grounding of the RRUs should connect to common grounding bus bar on tower top which is connected with tower grounding strip.

M The connectors of each signal cable should intact and securely linked, and these cables should not damaged or broken.

J Labels are correct, legible and complete at both ends of each cable

TI Acceptance Check List V01 MA-FO-30601 - 2 -

Page 3: TI Provisional Acceptance Check List-(LTE) V2

Provisional Acceptance TestingTelecom Works Checklist-LTE Project

Severity Level Work Item / Check

Checked Item Failure Comments / Qualifying

InformationNo Snag

Comply

Do not Compl

y

terminations. (RRU & Antenna port)M All outdoor labelling should be installed with steel labels.

eNodeB Commissioning

J All eNode B commissioning data and results entered into site folder.

J Software loaded and version verified correct.

J Site configuration files (XML) is downloaded and running properly.

J eNodeB License installed and verification by using Local Login.

J Time synchronization & clock synchronization should verify.

J BTS type configured should match with hardware BTS type.

J Installed card should comply with configured hardware types.

J Certificate installation status should verify.

J Addition of standby power protection UPEUc.

J Replacement of existing BBU FAN with FANc.

J For newly installed cabinets only: eNodeB Reset by Power OFF & Power ON and check the stability of eNodeB after reset.

eNodeB Intégration

J Test calls in all sectors performed.

J No alarm in Alarm browser.

J eNodeB Alarms reporting to OMC.

J Radio Network parameters & Transmission data consistent with site folder data?

J Management connection to the site is verified from OMC/NOC.

J eNodeB data consistency by STR CFGCHK from M2000.

J Binary alarms are connected & verified by testing (outdoor Macro)

J

Continues ping test for five minutes to next hop performed & packet loss is less than 0.1% Note: Transmission link quality issues Should follow up with ND & MS teams)

Outdoor/Indoor Power, Optical Fiber & RF Jumper cable Installation

J Internal Jumper Installation & routing should proper.

M All connectors should tighten to specified torque setting.

TI Acceptance Check List V01 MA-FO-30601 - 3 -

Page 4: TI Provisional Acceptance Check List-(LTE) V2

Provisional Acceptance TestingTelecom Works Checklist-LTE Project

Severity Level Work Item / Check

Checked Item Failure Comments / Qualifying

InformationNo Snag

Comply

Do not Compl

y

J External jumper installation & routing should proper.

M Internal and External connectors’ installation and waterproofing should proper.

M Labelling of RF jumpers at antenna & eNodeB end shouls available. ( Outdoor Labelling with Steel lables)

M Outdoor Optical cable installation should proper.

M Outdoor DC power cable installation should proper.

M Cable laying in cable tray should without overlapping each other.

J All DC power cable terminations should with proper rating of lugs & boot lugs.

eNodeB Antenna & SASU Installation

J Correct antenna types (Dual Band-1800/2100Mhz) on each sector according to design.

M LTE & 3G antenna ports should labelled.

M Tilting kits installation should proper.

M SASU unit installation should proper with labelling & grounding cable.

J All Node-B antenna/RF system installation data has been entered into site folder.

eNodeB Antenna System Commissioning

J Printed measurement results properly filled signed and inserted in the Site Specific Folder.

J

VSWR done and Values are within range? (<1.5).Note: VSWR of Jumper cable between RRU & antenna can be measured by equipment command. VSWR of feeders scenarios need to be measured by SiteMaster (IBS & Shared Sites).

JVSWR of 2G DCS antenna path should measure & verified until triplexer in feeder sharing with 2G scenarios. (<1.5)Note: Ericsson MS team will verify 2G DCS ports VSWR.

Indoor Optical Fiber patch câble Installation and Routing to RTN port

J Optical fiber cable routing through cable tray to RTN optical ports should proper & safe. Cable should be standard shielded optical fiber cable.

SLO Check Items :

JeNodeB access through Web LMT by M2000 & LAN

j eNodeB access rights for Local users in correct user categories

j RTWP of 3G cells effected after LTE cell unblocked?

GeneralJ Other unused material brought back. Site is clean and tidy?

TI Acceptance Check List V01 MA-FO-30601 - 4 -

Page 5: TI Provisional Acceptance Check List-(LTE) V2

Provisional Acceptance TestingTelecom Works Checklist-LTE Project

Severity Level Work Item / Check

Checked Item Failure Comments / Qualifying

InformationNo Snag

Comply

Do not Compl

y

M Cable ties trimmed.

J No property damage visible.

OIL List

Item no Outstanding Items/Snags detectedClearance

DateWitnessed by

(Sign)                                                               

Nominal ID: __________________ Candidate ID: _________________Date of completion:

_____/______/_______

TI Acceptance Check List V01 MA-FO-30601 - 5 -

Page 6: TI Provisional Acceptance Check List-(LTE) V2

Provisional Acceptance TestingTelecom Works Checklist-LTE Project

Inspection completed by: Huawei Sub con Du ND Du NO

Name:

Signature:

TI Acceptance Check List V01 MA-FO-30601 - 6 -