Site Code: Date:
Site Type: Activity Type:
Lat:: Long:
Site Address:
Attendees (Complete as Appropriate)
Team NAME COMPANY/TITLEAcceptance
Status*
Huawei
Sub-Con
du ND
du NO
* 1) Fully accepted 2) Partially accepted 3) Rejected
*Snag List should be attached
Severity Levels were classified as: J: Major M: Minor
TI Acceptance Check List V01 MA-FO-30701 Page 1 of 6
Provisional Acceptance Testing
Telecom Works Acceptance Checklist-LTE Project
Provisional Acceptance TestingTelecom Works Checklist-LTE Project
Severity Level Work Item / Check
Checked Item Failure Comments / Qualifying
InformationNo Snag
Comply
Do not Compl
y
eNodeB Installation– (For New BTS3900 & APM30H installation scenarios)
J Stability of Cabinet should proper.
M (Outdoor Node B only) Cabinet should correctly mount with specified size bolts. (Galvanized or stainless steel only)
M Is the Locking mechanism & door fitted and functioning correctly?
J Cabinet positioning in shelter should be as per design.
M Cabinet Grounding should be tight and proper.
J Optical Fiber, power & grounding cables routing should be proper (Optical Fiber cable shouldn’t route with other cables from out of eNodeB).
eNodeB Modules & Internal Cables Installation (For New BTS3900 & APM30H installation scenarios)
M All Modules including PMU module, Battery Modules, FAN Modules & RFU subrack installation should be proper (all screws present and tightened).
J Internal Cabling including CPRI, Alarm Signal Cables, BBU power cables and connectors should install properly & tied.
M Necessary Labelling of cables & modules should exist (Ext Alarm cables, Sensors, ect..).
BBU cards/DCDU Installation
J The installation position of the BBU/DCDU strictly complies with the engineering design.
J The installed breakers in Rectifier module should meet the needs of eNodeB power consumption which is larger than 50A.
M Required boards are installed on existing BBU in correct positions as per design.
M All the bolts should tight. Both the spring washer and the flat washer are installed in the correct sequence.
J All cards should be neat and clean.
J All labels, tags and name plates are correct, legible and complete.
RRU Installation
J The RRU is securely installed.
J None of power cables and GND cables can’t be short-circuited or reversely connected. In addition, these cables are not damaged or broken.
J Power cables and GND cables should separately bound from other cables.
J Grounding of the RRUs should connect to common grounding bus bar on tower top which is connected with tower grounding strip.
M The connectors of each signal cable should intact and securely linked, and these cables should not damaged or broken.
J Labels are correct, legible and complete at both ends of each cable
TI Acceptance Check List V01 MA-FO-30601 - 2 -
Provisional Acceptance TestingTelecom Works Checklist-LTE Project
Severity Level Work Item / Check
Checked Item Failure Comments / Qualifying
InformationNo Snag
Comply
Do not Compl
y
terminations. (RRU & Antenna port)M All outdoor labelling should be installed with steel labels.
eNodeB Commissioning
J All eNode B commissioning data and results entered into site folder.
J Software loaded and version verified correct.
J Site configuration files (XML) is downloaded and running properly.
J eNodeB License installed and verification by using Local Login.
J Time synchronization & clock synchronization should verify.
J BTS type configured should match with hardware BTS type.
J Installed card should comply with configured hardware types.
J Certificate installation status should verify.
J Addition of standby power protection UPEUc.
J Replacement of existing BBU FAN with FANc.
J For newly installed cabinets only: eNodeB Reset by Power OFF & Power ON and check the stability of eNodeB after reset.
eNodeB Intégration
J Test calls in all sectors performed.
J No alarm in Alarm browser.
J eNodeB Alarms reporting to OMC.
J Radio Network parameters & Transmission data consistent with site folder data?
J Management connection to the site is verified from OMC/NOC.
J eNodeB data consistency by STR CFGCHK from M2000.
J Binary alarms are connected & verified by testing (outdoor Macro)
J
Continues ping test for five minutes to next hop performed & packet loss is less than 0.1% Note: Transmission link quality issues Should follow up with ND & MS teams)
Outdoor/Indoor Power, Optical Fiber & RF Jumper cable Installation
J Internal Jumper Installation & routing should proper.
M All connectors should tighten to specified torque setting.
TI Acceptance Check List V01 MA-FO-30601 - 3 -
Provisional Acceptance TestingTelecom Works Checklist-LTE Project
Severity Level Work Item / Check
Checked Item Failure Comments / Qualifying
InformationNo Snag
Comply
Do not Compl
y
J External jumper installation & routing should proper.
M Internal and External connectors’ installation and waterproofing should proper.
M Labelling of RF jumpers at antenna & eNodeB end shouls available. ( Outdoor Labelling with Steel lables)
M Outdoor Optical cable installation should proper.
M Outdoor DC power cable installation should proper.
M Cable laying in cable tray should without overlapping each other.
J All DC power cable terminations should with proper rating of lugs & boot lugs.
eNodeB Antenna & SASU Installation
J Correct antenna types (Dual Band-1800/2100Mhz) on each sector according to design.
M LTE & 3G antenna ports should labelled.
M Tilting kits installation should proper.
M SASU unit installation should proper with labelling & grounding cable.
J All Node-B antenna/RF system installation data has been entered into site folder.
eNodeB Antenna System Commissioning
J Printed measurement results properly filled signed and inserted in the Site Specific Folder.
J
VSWR done and Values are within range? (<1.5).Note: VSWR of Jumper cable between RRU & antenna can be measured by equipment command. VSWR of feeders scenarios need to be measured by SiteMaster (IBS & Shared Sites).
JVSWR of 2G DCS antenna path should measure & verified until triplexer in feeder sharing with 2G scenarios. (<1.5)Note: Ericsson MS team will verify 2G DCS ports VSWR.
Indoor Optical Fiber patch câble Installation and Routing to RTN port
J Optical fiber cable routing through cable tray to RTN optical ports should proper & safe. Cable should be standard shielded optical fiber cable.
SLO Check Items :
JeNodeB access through Web LMT by M2000 & LAN
j eNodeB access rights for Local users in correct user categories
j RTWP of 3G cells effected after LTE cell unblocked?
GeneralJ Other unused material brought back. Site is clean and tidy?
TI Acceptance Check List V01 MA-FO-30601 - 4 -
Provisional Acceptance TestingTelecom Works Checklist-LTE Project
Severity Level Work Item / Check
Checked Item Failure Comments / Qualifying
InformationNo Snag
Comply
Do not Compl
y
M Cable ties trimmed.
J No property damage visible.
OIL List
Item no Outstanding Items/Snags detectedClearance
DateWitnessed by
(Sign)
Nominal ID: __________________ Candidate ID: _________________Date of completion:
_____/______/_______
TI Acceptance Check List V01 MA-FO-30601 - 5 -
Provisional Acceptance TestingTelecom Works Checklist-LTE Project
Inspection completed by: Huawei Sub con Du ND Du NO
Name:
Signature:
TI Acceptance Check List V01 MA-FO-30601 - 6 -