Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona 12-15 May 2003 1 DISPOWER...

14
1 Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona 12-15 May 2003 DISPOWER Distributed Generation with High Penetration of Renewable Energy Sources Thomas Degner ISET e.V. Königstor 59, D-34131 Kassel Tel. +49 561 7294 232 Fax +49 561 7294 200 Email: [email protected] kassel.de

Transcript of Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona 12-15 May 2003 1 DISPOWER...

1Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWERDistributed Generation with High Penetration of

Renewable Energy Sources

Thomas DegnerISET e.V.

Königstor 59, D-34131 KasselTel. +49 561 7294 232 Fax +49 561 7294 200Email: [email protected]

2Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

Future grids with Decentralised Power Production

3Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

Objective and ApproachMain objective:• Preparation of a new distributed generation structure of

power supply in regional, local and island grids

Approach• Investigation on basic solutions for technical problems

expected from more decentralised generation in distribution networks

• Demonstration of exemplary technical solutions in test centres and at selected sites

• Restriction on medium and low voltage grids

4Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER

• 37 partners from 11 European countries

• 17 mio Euro overall budget• Project duration Jan 2001 – Dec 2005• Work divided into 11 work packages

5Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWERConsortium

37 partners from 11 European countries:

• utilities

• power industry and service companies

• research centres and universities

6Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER – research areasGrid stability and control• Stable operation of networks with very high penetration of DG• Control of DG and storage plant• Hardware and control strategies for load management• Advanced communication and metering

Power quality and safety• Power quality of LV connected DG• Development of a power quality and management system for DG in

LV networks• Concepts and solutions for preventing unintended islanding• Protection against overload and short circuits in DG networks• Identification of requirements for new standards for DG

7Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER – research areas(continued)

Socio-economic issues• Evaluate the potential of the users as “controllable” load • Influence of ICT and innovative distribution networks on the

penetration of DG• Effect of institutional changes in the electricity markets and strategic

behaviour of incumbent utilities on the position of DG

8Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER – research areas(continued)

Planning, trading and operation tools• Adaptation of a simulation tool for load flow calculations in DG

networks with wind power plants• Development of software tools for optimisation of grid connection

of wind farms• SCADA system for DG and controllable loads• Training facilities and programme for grid operator personal

Information, communication, and electricity trading• Standardised data structures and data bases for information services• Wind power prediction tool for wind farms in UK to improve

energy trading

9Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER – research areas(continued)

Test facilities for grid stability, control and power quality • Test facility for power quality at CESI, Milano (transient and energy

flow analysis)• Test facility for grid stability and control at ISET, Kassel (test of

DG units, setup of laboratory DG grid)

10Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

Test facility for grid stability and control at ISET

11Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER – research areas(continued)

Implementation of DG technology in regional power supply systems

• Case studies for DG in European interconnected networks• Case studies for DG in European islands and weak grid

Pilot installations and monitoring of DG in low voltage grids• Solar Settlement Querdeich (PV/ micro turbine / battery storage)• Technology Demonstration Centre San Agustin del Guadalix (PV/

Wind/ Battery)• Stadtwerke Karlsruhe (Fuel cell, battery storage)

12Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER – document management system

13Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

DISPOWER: CIRED 2003 contributions

UOG_Massucco_A1. Stefano Massucco (University of Genova) “Electrical energy distribution networks: actual situation and perspectives for distributed generation”

ISE_Degner_A1. Thomas Degner (ISET) ”Effect of renewable energy sources on power quality -Recent research activities”

UMI_Bopp_A1. Thomas Bopp (UMIST)“Commercial and technical integration of distributed generation into distribution networks”

UMI_Chilvers_A1. Ian Chilvers (UMIST) “Development of distribution network protection schemes to maximise the connection of distributed generation”

14Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG

Barcelona 12-15 May 2003

For further information and documents please visit

dispower.org

Thank you for your attention !

We acknowledge the support of the project by the European Commission under contract No. ENK5-CT-2001-00522