This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National...

18
This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Transcript of This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National...

Page 1: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 2: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

Copyright © 2014 by NCEES. All rights reserved. All NCEES sample questions and solutions are copyrighted under the laws of the United States. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means without the prior written permission of NCEES. Requests for permissions should be addressed in writing to [email protected] or to NCEES Exam Publications, PO Box 1686, Clemson, SC 29633. ISBN 978-1-932613-73-5 Printed in the United States of America October 2014 First Printing

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 3: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

iii

CONTENTS

Introduction to NCEES Exams.................................................................... 1

About NCEES

Updates on exam content and procedures

Exam-day schedule

Admission to the exam site

Examinee Guide

Scoring and reporting

Staying connected

Exam Specifications ...................................................................................... 3

Civil AM Practice Exam .................................................................... 11

Transportation PM Practice Exam .................................................. 33

Civil AM Solutions ............................................................................ 55

Transportation PM Solutions ........................................................... 75

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 4: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

1

About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made up of engineering and surveying licensing boards from all U.S. states and territories. Since its founding in 1920, NCEES has been committed to advancing licensure for engineers and surveyors in order to protect the health, safety, and welfare of the American public. NCEES helps its member licensing boards carry out their duties to regulate the professions of engineering and surveying. It develops best-practice models for state licensure laws and regulations and promotes uniformity among the states. It develops and administers the exams used for engineering and surveying licensure throughout the country. It also provides services to help licensed engineers and surveyors practice their professions in other U.S. states and territories. Updates on exam content and procedures Visit us at ncees.org/exams for updates on everything exam-related, including specifications, exam-day policies, scoring, and corrections to published exam preparation materials. This is also where you will register for the exam and find additional steps you should follow in your state to be approved for the exam. Exam-day schedule Be sure to arrive at the exam site on time. Late-arriving examinees will not be allowed into the exam room once the proctor has begun to read the exam script. The report time for the exam will be printed on your Exam Authorization. Normally, you will be given 1 hour between morning and afternoon sessions. Admission to the exam site To be admitted to the exam, you must bring two items: (1) your Exam Authorization and (2) a current, signed, government-issued identification. Examinee Guide The NCEES Examinee Guide is the official guide to policies and procedures for all NCEES exams. All examinees are required to read this document before starting the exam registration process. You can download it at ncees.org/exams. It is your responsibility to make sure that you have the current version. NCEES exams are administered in either a computer-based format or a pencil-and-paper format. Each method of administration has specific rules. This guide describes the rules for each exam format. Refer to the appropriate section for your exam. Scoring and reporting NCEES typically releases exam results to its member licensing boards 8–10 weeks after the exam. Depending on your state, you will be notified of your exam result online through your MyNCEES account or via postal mail from your state licensing board. Detailed information on the scoring process can be found at ncees.org/exams. Staying connected To keep up to date with NCEES announcements, events, and activities, connect with us on your preferred social media network.

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 5: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

11

CIVIL AM PRACTICE EXAM

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 6: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

CIVIL AM PRACTICE EXAM

Copyright 2014 by NCEES 13 GO ON TO THE NEXT PAGE

7. ORDER & DELIVER METAL BUILDING30 DAYS

10 DAYSSTART 10 DAYS

15 DAYS

10 DAYS 10 DAYS FINISH

5. INSTALL FINISHELEMENTS

4. ERECT BUILDING

5 DAYS

35 DAYS

6. PROCURE REINFORCING

STEEL7 DAYS

1. EXCAVATE FOOTINGS

2. FORM & POUR FOOTINGS

8. ROUGH INELECTRIC &PLUMBING

3. GRADE & POUR SLABON GRADE

9. PROCURE MISCELLANEOUS BUILDING ELEMENTS

A B C D E F

104. A CPM arrow diagram is shown below. Nine activities have been estimated with durations ranging from 5 to 35 days. The minimum time (days) required to finish the project is most nearly:

(A) 40 (B) 42 (C) 45 (D) 50

105. A bridge is to be jacked up to replace its bearings. The design requires a hydraulic ram with a

minimum capacity of 1,000 kN (kilonewtons). The hydraulic rams that are available are rated in tons (2,000 lb/ton). The minimum size (tons) ram to use is most nearly:

(A) 1,110 (B) 250 (C) 150 (D) 100

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 7: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

CIVIL AM PRACTICE EXAM

Copyright 2014 by NCEES 27 GO ON TO THE NEXT PAGE

131. The Standard Penetration Test (SPT) is widely used as a simple and economic means of obtaining which of the following?

(A) A measurement of soil compressibility expressed in terms of a compression index

(B) A direct measurement of the undrained shear strength

(C) An indirect indication of the relative density of cohesionless soils

(D) A direct measurement of the angle of internal friction 132. A department of transportation must remove and replace a 12-ft 20-ft concrete slab on an

interstate facility. To minimize disruption to traffic, the work must be completed during an 8-hour nighttime work shift. Nighttime temperatures average 50F. If the minimum required compressive strength is 3,500 psi, the concrete mix would most likely consist of:

(A) coarse aggregate, sand, Type II cement, chemical accelerator

(B) sand, Type III cement, water, chemical accelerator

(C) coarse aggregate, sand, Type V cement, water, chemical accelerator

(D) coarse aggregate, sand, Type III cement, water, chemical accelerator 133. Fatigue in steel can be the result of:

(A) a reduction in strength due to cyclical loads

(B) deformation under impact loads

(C) deflection due to overload

(D) expansion due to corrosion

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 8: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

33

TRANSPORTATION PM PRACTICE EXAM

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 9: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

TRANSPORTATION PM PRACTICE EXAM

Copyright 2014 by NCEES 34 GO ON TO THE NEXT PAGE

A

BD

C

501. The following information applies to a four-lane freeway.

Volume 2,400 vph (in one direction) Peak hour factor 0.90 Base free-flow speed 60 mph 5% truck traffic 12-ft lanes 10-ft outside shoulders 2-mile interchange spacing Level terrain No recreational vehicles Commuter traffic familiar with facility

The level of service (LOS) for the freeway is most nearly:

(A) LOS A

(B) LOS B

(C) LOS C

(D) LOS D 502. The figure shows a ramp-weaving segment of a freeway. The following data apply:

Flow rate A-C = 4,200 pcph Flow rate B-C = 600 pcph Flow rate A-D = 500 pcph Flow rate B-D = 400 pcph

If the mean speed of the traffic in the weave segment is 56 mph, the density (pc/mile/lane) is most nearly:

(A) 34 (B) 32 (C) 28 (D) 25

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 10: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

TRANSPORTATION PM PRACTICE EXAM

Copyright 2014 by NCEES 35 GO ON TO THE NEXT PAGE

503. For a lane group at a signalized intersection, which of the following factors will change the saturation flow rate from the base saturation flow rate provided in the Highway Capacity Manual?

(A) Intersection located in a suburban school zone

(B) Level terrain

(C) Peak hour factor of 0.92

(D) Inclusion of left-turns with protected phasing 504. A speed study concludes that the 85th percentile speed of free-flowing traffic is 56.2 mph.

Which of the following posted speed limit signs most nearly meets the guidance for speed limit signs?

(A) 50 mph, 55 mph, 60 mph, 65 mph

(B) 50 mph, 55 mph

(C) 55 mph, 60 mph

(D) 60 mph, 65 mph

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 11: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

63

CIVIL AM SOLUTIONS

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 12: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

CIVIL AM SOLUTIONS

66

7 4 5+ +Activities:

30 + 10 + 10 = 50 daysDays:

30 ft

50 ft40 ft

x

104. Reference: Nunnally, Construction Methods and Management, 8th ed., 2011, pp. 282285.

THE CORRECT ANSWER IS: (D)

105. Reference: Ricketts, Loftin, and Merritt, Standard Handbook for Civil Engineers, 5th ed.,

p. 4.11.

1 ton1,000 kN 1,000 kN 112.4 tons

8.896444 kN

150 tons > 112.4 tons THE CORRECT ANSWER IS: (C)

106. Reference: Shapiro, Shapiro, and Shapiro, Cranes and Derricks, 3rd ed., 2000, p. 244.

40tan x 53.13

30cos 51.13 100 ft 60 ft

60 ft 35 ft 25 ft

x

THE CORRECT ANSWER IS: (B)

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 13: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

CIVIL AM SOLUTIONS

72

12 in. 2%

2 Q1 = Q2

Q2

12 in. 2%

? in. 2%Q1

Q1

121.

Reference: Viessman and Lewis, Introduction to Hydrology, 4th ed., 1996, p. 252.

1 1 2 2

2/3 1/ 2 2/3 1/21 1 2 2

2/3 2/31 2

1 21 2

222

1

1

2/3 22

2 V A V A

1.49 1.492 A R S A R S

n n

A A2 A A

P P

1DA 0.785 ft

4 4P D 1 3.14 ft

DD0.785

2 0.7853.14 4

2/322

2

2/322 2

2/322 2

2/38/3

2

8/32

3/8

2

2

4D

D D0.623

4 4

D D

4 4

1 1D

4 4

0.623 0.311 D

0.623D

0.311

12 in.D 1.297 ft 15.6 in. 16 in.

ft

THE CORRECT ANSWER IS: (A)

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 14: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

CIVIL AM SOLUTIONS

79

135. Reference: Garber and Hoel, Traffic & Highway Engineering, 4th ed., p. 901.

s w

s w a

s

w

s

w

a

33

W WWTotal density

V V V V

where total density

W total weight

V total volume

W weight soil

W weight of water

V volume of soil

V volume of water

V volume of air

9.11 lb 4.41 lb156.67 lb/ft (pcf )

0.03 ft

Dry unit weig

d

d

ht of soil1 w

where w moisture content

156.67 pcf140.51 pcf

1 0.115

THE CORRECT ANSWER IS: (B)

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 15: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

75

TRANSPORTATION PM SOLUTIONS

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 16: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

TRANSPORTATION PM SOLUTIONS

77

501. Reference: Transportation Research Board, Highway Capacity Manual, 2010, pp. 11-7 to 11-19.

LW LC N id

LW

LC

N

id

Compute the free flow speed (FFS):

FFS BFFS f f f f

where :

BFFS 60 mph (given)

f 0 12-ft lanes

f 0 10-ft shoulders

f 4.5 two lanes in each direction

f 0 2-mile spacing between interchanges

FFS 60 4.5 55.5 mph

Compute

HV T

HVT T

pHV p

f , p.11-13, level terrain E 1.5:

1 1f 0.97561 P (E 1) 1 0.05 (1.5 1)

Compute flow rate:

2,400Vv 1,366 pcphpl(PHF)(N)(f )(f ) 0.9 2 0.976 1.00

Compute density:

1,366volumeDensity = = = 24.6 pcpmplspeed 55.5

Find LO

S:

From p.11-7, LOS C

THE CORRECT ANSWER IS: (C)

502. Reference: Transportation Research Board, Highway Capacity Manual, 2010, pp. 12-10 to 12-33.

Total volume = 4,200 + 500 + 600 + 400 = 5,700 Speed given = 56 mph Number of lanes, N = 4 See p. 12-23 Eqn. 12-22

V 5,7001, 425N 4

D 25.44S 56 56

pc/mile/lane

THE CORRECT ANSWER IS: (D)

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 17: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

TRANSPORTATION PM SOLUTIONS

78

503. Reference: Transportation Research Board, Highway Capacity Manual, 2010, pp. 18-35 to 18-37.

Left-turns with protected phasing (exclusive or shared lanes) decrease saturation flow rate.

THE CORRECT ANSWER IS: (D) 504. Reference: FHWA, Manual on Uniform Traffic Control Devices, 2009, pp. 437–446.

When a speed limit is to be posted, it should be within 10 km/hr or 5 mph of the 85th percentile speed of the free-flowing traffic.

56.2 5 mph 61.255 or 60 mph

56.2 5 mph 51.2

THE CORRECT ANSWER IS: (C)

505. Reference: Roess, Prassas, and McShane, Traffic Engineering, 3rd ed., pp. 189–193.

Given:

Vehicles on Street A on Wednesday 10,300 Vehicles on Street B on Wednesday 7,450

Calculate the ratio of vehicles on Street B on Wednesday to the vehicles on Street A on Wednesday:

7,450 0.723310,300

Calculate the average daily traffic volume for Street B:

6,950 9,450 7,340 10,300 9,850 11,250 8,450

ADT 0.7233 6,5707

THE CORRECT ANSWER IS: (A)

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].

Page 18: This is a preview. Some pages have been omitted ... · PDF file1 About NCEES The National Council of Examiners for Engineering and Surveying (NCEES) is a nonprofit organization made

95

PE Practice Exams Published by NCEES

Chemical

Civil: Construction

Civil: Geotechnical

Civil: Structural

Civil: Water Resources and Environmental

Electrical and Computer: Computer Engineering

Electrical and Computer: Electrical and Electronics

Electrical and Computer: Power

Environmental

Mechanical: HVAC and Refrigeration

Mechanical: Mechanical Systems and Materials

Mechanical: Thermal and Fluids Systems

Structural

For more information about these and other NCEES publications and services,

visit NCEES.org or call Client Services at (800) 250-3196.

This is a preview. Some pages have been omitted. Copyrighted by NCEES. For permission to reuse, email [email protected].