This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over 100 so I shortened it to give you just a taste.
Please note that the timings for this presentation were different than they are here – there was a presenter who was clicking to the next slide when he was done speaking – here the slides are transitioning automatically, so you might not have enough time to read the entire slide.
So when you are ready, just click once to start.
THANK YOU FOR WATCHING – ROSE LAWLESS
Project Goals
Your Company purchased 6.22 acres on Water Tower Road during the summer of 2007.
This will be the new home of the Your Operations Division.
Project Goals
WHY OUR COMPANY, YOU ASK???
Our project goal is to take this location from the current condition of a vacant parcel with a preliminary plan, through design, specifications, site plan approval, permitting, bidding to the various trades, construction, obtaining a Certificate of Occupancy and moving YOU in to a beautiful new facility no later than August, 2009.This goal will be realized through the use of our firm which has the knowledge and proven experience to achieve this goal.
Procedures
PHASE I –
SCHEMATIC DESIGN STUDIESPHASE II –
DESIGN DEVELOPMENTPHASE III –
CONSTRUCTION DOCUMENTSPHASE IV –
CONSTRUCTION
Phase II – Design Development
Upon approval of Schematic Designs and owners authorization to proceed:
•Development of the concept•Finalize floor plans and elevations•Complete site plans
AUTOCLAVED AERATED CONCRETE
+ + + = AAC
Cement water lime sand
YOUR site
Boynton Pump & Irrigation
Corporate Office/Distribution Facility
Location: Lake Park, Florida
Client: Boynton Pump and Irrigation
Designed By: MY COMPANY
Size: 40,000 S.F.
Features: This facility combines tilt wall construction and a USA Pre-engineered Metal Building System. It contains two (2) showrooms and distribution warehousing with truck docking facilities.
Steel Structure
during construction
COMPLETED PROJECT
Technology - More GREEN!
GREENBUILDING
INSULATION
IMPACTWINDOWS
GALVANIZEDMETALROOF
LOW WATERUSE
PLUMBING
CARPET AND
FLOORINGMATERIALS
ENERGY STAR
PROGRAM
SHADE TREES
WHAT CAN WE DO TOMAKE YOURBUILDINGGREEN?
•HEBEL AUTOCLAVED AERATED CONCRETE
•INSULATED COMPOSITE WALL PANELS
•RECYCLED STEEL STRUCTURE
•REFLECTIVE WHITE METAL ROOF
•IMPACT WINDOWS
•CARPET AND FLOORING
•“ENERGY STAR” PRODUCTS
•PLUMBING
•SHADE TREES/IRRIGATION
•HIGH-EFFICIENCY LIGHTING
RECYCLED STEEL
Steel is the most recycled material in North America, according to the Steel Recycling Institute.
More than 68 million tons are recycled each year. In fact, all new steel made in North America contains recycled steel.
LANDSCAPING/IRRIGATION OPTIONS
Overflow rainfall is collected in silo-like cisterns and used to maintain landscaping. An on-site, constructed wetland and landscaped bioswales cleanse water from the parking area before it leaves the site.
REFLECTIVE WHITE METAL ROOF
REFLECTIVE WHITE METAL ROOF
ENERGY EFFICIENT CARPET AND FLOORING
30,000 lbs of crumb rubber from tires A DAY are recycled.
10,000,000 pounds of tires are used per year to produce carpet and flooring.
ENERGY STAR PROGRAM
Tax Deductions for Commercial Buildings:A tax deduction of up to $1.80 per square foot is available to owners or designers of new or existing commercial buildings that save at least 50% of the heating and cooling energy of a building that meets ASHRAE Standard 90.1-2001.
HIGH EFFICIENCY ELECTRIC
Efficient Fluorescent Lighting
WANTED DEAD OR ALIVE. LOW EFFICIENCY HID LIGHTINGEarn Rewards Up To $140 Per HID Fixture
Technology - More GREEN!WHAT CANSHADE TREESDO TO HELPSAVE ENERGY?
When shade trees cool a building, such that one unit of air conditioning energy is avoided, 5 to 10 units of primary energy are avoided at the power plant.
Thank you for watching and I hope to work with you in the very near future!
Click ESC key to exit.
Rose LawlessYour Office On Call