TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts,...

37
The State of the Global CLT Industry A Survey in Progress Lech Muszyński* * Eric Hansen* Jasmin Rainer** Julian Geisel* ** B.M.S.R. Fernando* Gabriel Schwarzmann**

Transcript of TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts,...

Page 1: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

The  State    of  the  Global  CLT  Industry  A  Survey  in  Progress  

Lech  Muszyński*   *  Eric  Hansen*  Jasmin  Rainer**  Julian  Geisel*   **  B.M.S.R.  Fernando*  Gabriel  Schwarzmann**  

Page 2: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete
Page 3: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete
Page 4: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

large small visited

visited new

other

 

An  opportunity  

Page 5: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Sources  of  informa8on  

Holzkurier    2011  (15),  2013,  

2015      37  

Industry  survey  2016  

 21    

(out  of  41  sent)  

Field  trips    2011-­‐2016  

 22  

5 19 16

7

Other sources: Presentations by

G. Schickhofer 2010 Companies’ websites

anonymous  

Page 6: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

-­‐

200  

400  

600  

800  

1,000  

1990 1995 2000 2005 2010 2015

CLT  prod

uctio

n  in  m

3Th

ousand

s

Global  output  es8mates  Global  manufacturing  output  

reached    2010:  ~327k  m3    2011:  ~419k  m3  

 2012:  ~600k  m3  

 2015:  projected  ~1M  m3  

   

* Based on Schickhofer 2010, Holzkurier 2011, 2015 & personal contacts 2012-2014

Dynamics in CLT volume produced 1990-2012*

Austria 60%

Germany16%

Italy,  6%

Canada 5%

USA 3%

Switzerland 3% The  rest  of  the  world 7%

Concentration  in  Alpine  Region

35.3 m cft or 424 M bf

Page 7: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

The  global  output  es8mates  

Austria  60%  

Germany  16%  

Italy  6%  

Canada  5%  

USA  3%  

Switzerland  3%  

The  rest  of  the  world  

7%  

ConcentraNon    in  Alpine  Region  

Austria  54%  Germany  14%  

Italy  5%  

Switzerland  3%  

France**  5%  

The  rest  of  EU*  6%  

Canada  5%   USA  3%   Japan**  5%  

ConcentraNon    in  Alpine  Region  

Based on Holzkurier 2015… … and some guestimation based on field trips and secondary sources excluding the survey

Page 8: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Manufacturers  1.   BINDERHOLZ  Bausysteme  CLT  plant  in  Unternberg  ,  AT  (Dec  2011)  2.   KLH  plant  in  Katch  am  Mur,  AT  (June  2012)  3.   Old  Stora  Enso  CLT  plant  in  Bad  Sankt  Leonhard,  AT  (Nov  2014)  4.   New  Stora  Enso  CLT  plant  in  Ybbs  a.d.  Donau,  AT    (March  2012)  5.   Hasslacher  Norica  CLT  plant  in  Stall,  AT  (Nov  2014)  6.   Mayr-­‐Melnhof  Holz,  CLT  plant  in  Geishorn,  AT  (Apr  2015)  

7.   Pius  Schuler  family  owned  CLT  plant  in  Rothenthurm,  CH  (Dec  2012)  8.   Schilliger  Holz  AG  CLT  plant  in  Hal8kon/Küssnacht,  CH  (Dec  2011)  

9.   Artuso  Legnami  in  Caselle  di  Al8vole,  IT  (Feb  2012,  Nov  2014)  10.   XLAM  Dolomi8  in  Castelnuovo,  IT  (Feb  2012)  

11.   Egoin  family  owned  plant  in  Bizkaya,  ES  (Sep  2013)  

12.   Mar8nsons  in  Bygdsiljum,  SE  (Sep  2013)  

13.   StructurLam  in  Pen8cton,  BC,  CA  (Nov  2012)  14.   Nordic  in  Chibougamau,  QC,  CA  (Oct  2013)  15.   SmartLam  in  Whitefish,    MT,    U.S.A.  (Aug  2013)  16.   DR  Johnson  in  Riddle,  OR,  U.S.A.  (Mar  2015)  

17.   Merk  CLT  plant,  in  Aichach,  D  (Sept  2014)  18.   Stephan  Holz,  in  Geildorf,  D  (Sept  2014)  19.   Mayr  &  Sontag  MHM  plant  in  Legau,  D  (Nov  2014)    20.   Eugen  Decker  Holzindustrie,  Morbach,  D  (Apr  2015)  

21.   Novatop,  Ptensky  Dvorek,  CZ  (Sept  2014)  

http

://w

ww

.art

usol

egna

mi.i

t

Contractors  Fores8  in  Brescia  region,  IT  (Feb  2012)  Cammi  in  Brescia  region,  IT  (Feb  2012)  Schmidt  Holzbau  CLT  processing  plant  in  

Bobingen,  D  (Nov  2014)    Equipment  Manufacturers  CTC-­‐Routech,  SCM  Grp,  Sinalunga,  IT  (Feb  2012)  Hundegger  in  Hawangen,  D  (Nov  2014)  Minda  in    

Field  trips  2011-­‐16:  CLT  industry  

Page 9: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

New  StoraEnso  plant  in  Ybbs  a.d.  Donau*  

Price tag: ~23 M EU (2012) 6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete (3,000 m3 flooring)

*Information volunteered by Lech’s field trip guide in 2012

Page 10: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

XLam  Dolomi8*  

Price tag for the complete new plant ~10M EU (2012)

*Information volunteered by Lech’s field trip guide in 2012

Page 11: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Small  scale:  Artuso  Legnami*  

Page 12: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Global  output  by  opera8on  scale*  

*based on combined sources

0

2

4

6

8

10

12

14

16

<=  10000 <=  20000 <=  30000 >  30000

number  o

f  plants

Annual  output  in  m3

15<=  10000

11% 6<=  20000

13%

3<=  30000

21%

7>  3000055%

Page 13: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Produc8on  profile*  

*) Percentages of annual volume output Based on 17 of 21 companies surveyed in 2016.

81% of the production is being used in structures allowed in current code

Custom  CLT  (specialty)

Blank  CLT  (commodity)

Production  profile  1/2*

Medium   size  public28%

Multi-­‐family  housing31%

Medium   size  industtrial

22%

Large  Scale7%

Other  markets12%

Production  profile  2/2*

Page 14: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Appe8te  for  growth*  

*) Based on 17 of 21 companies surveyed in 2016.

 -­‐

 500

 1,000

 1,500

 2,000

1990 1995 2000 2005 2010 2015 2020

CLT  prod

uctio

n  in  m

3Th

ousand

s Currently most companies work well below their max capacity. *Survey average 1.15 shift.

0123456789

NR Within  12months

within  2years

within  5years

no  increaseplanned

#  of  respon

dents  (of  16)

Plans  to  increase  production

Page 15: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Options a, b and c Options d and e

Source: BSPhandbuch 2010

WoodWorks

50%  to  75%  of  the  process  is  similar  to  glulam  manufacturing  

Page 16: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Overview  of  the  manufacturing  process  

Page 17: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Manufacturing  steps  &  op8ons    Manufacturing  Steps  

OpNons  a   b   c   d   e  

1.  Recep8on  of  raw  material                    (C24  lumber  dried  to  ~12%  MC)   J   J   J   J   J  

2.  Check  MC   J   J   J   J   J  3.  Check  grade   J   J   J   J   J  4.  Manipulate  (cut  out)  substandard  sec8ons  

(improve  grade)   J   J   J   J  

5.  Finger  join8ng   J   J   J   J  6.  Plane  4  sides  (8ght  thickness  tolerances)   J   J   J   J  

Page 18: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Manufacturing  steps  &  op8ons    Manufacturing  Steps  

OpNons  a   b   c   d   e  

7a.  Apply  adhesives  on  wide  faces   J   J   J  7b.  Apply  adhesive  on  narrow  edges   J   J   J      8.  Edge  bond  flat  lamellas   J   J      9.  Spread  adhesive  on  wide  faces  of  the  layers   J   J  10.    Bond  layers  into  billets  (or  deep  glulams)   J   J  11.  Rip  billets  (glulams)  into  thin  lamellas  

(ver8cal  band  saw  cuts  through  all  layers)   J   J  

12.  Panel  layup   J   J   J   J   J  13.  Pressing   J   J   J   J   J  

 a.  through  the  thickness  (1  direc8on)   J   J   J   J   J    b.  edges  (2  direc8ons)   J   J  

Page 19: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Manufacturing  steps  &  op8ons    Manufacturing  Steps  

OpNons  a   b   c   d   e  

14.  Trim  edges     J   J   J   J   J  and/or  

15.  CNC  finish  (cumng  window/door  openings,  connec8on  nests,  ducts  etc.)   J   J   J   J   J  

16.  Packaging  (weathering  protec8on)   J   J   J   J   J  17.  Shipping   J   J   J   J   J  

Page 20: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Pius  Schuler  

Page 21: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Op8on  (d)  for  easy  startup    (Pius  Schuler)  

Page 22: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Op8on  (d)  (Pius  Schuler)  

Page 23: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Press  sizes*  and  types  

* Based on combined sources, incl: max dimensions of products offered by companies in their on-line catalogues.

http://www.proholz.at/zuschnitt/31/brettsperrholz/

0

5

10

15

20

25

30

35

<15 15-­‐30 30-­‐60 60-­‐90 90-­‐110press  lengths,  ft

Press  length

0

5

10

15

20

25

30

35

<3 3-­‐6 6-­‐9 9-­‐12 12-­‐15 15+press  widths,  ft

Press  width

02468

101214161820

<100 100-­‐300 300-­‐500 500-­‐700 700-­‐900 900+press  area,  ft2

Press  area

vacuum,  10,  22%

hydraulic,  27,  60%

pmeumatic,  3,  7% nails,  4,  9% other,  1,  2%

Page 24: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Press  types  and  adhesives*  

* Based on combined sources

vacuum,  10,  22%

hydraulic,  27,  60%

pmeumatic,  3,  7% nails,  4,  9% other,  1,  2%

Incl.  3  RF  presses   PUR

59%

MUF22%

other8%

nails/screws11%

Page 25: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

CLT  Manufact.  &  

prefab.  

Cutout  specificaNon  

Primary  processing  

Engineering  design  

Architectural  design  

ConstrucNon  

Transport  

Technical  training  

HarvesNng  

InsulaNon  &  Siding  

Industrial  hardware  design  &  manuf.  

Connectors  &  fi[ngs  hardware  

The  supply  chain  (a  dran)*  

*) Based on field trip experience & observation

Page 26: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

CLT  Manufact.  &  

prefab.  

Cutout  specificaNon  

Primary  processing  

Engineering  design  

Architectural  design  

ConstrucNon  

Transport  

Technical  training  

HarvesNng  

InsulaNon  &  Siding  

Industrial  hardware  design  &  manuf.  

Connectors  &  fi[ngs  hardware  

The  supply  chain  (a  dran)*  

*) Based on field trip experience & observation

Page 27: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Ver8cal  Integra8on*  

*) Based on 17 of 21 companies surveyed in 2016.

0

5

10

15

20

25

forest logtransp

lumbermfg

lumbertrans

CLTmfg

archdesign

bldengng

CLTtransp

realestate

bldgconstr

otherVI

numbe

r  of  com

panies

Vertical  chain  elements

Vertical   Integration

Page 28: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

CLT  Manufact.  &  

prefab.  

Cutout  specificaNon  

Primary  processing  

Engineering  design  

Architectural  design  

ConstrucNon  

Transport  

Technical  training  

HarvesNng  

InsulaNon  &  Siding  

Industrial  hardware  design  &  manuf.  

Connectors  &  fi[ngs  hardware  

The  supply  chain  (a  dran)*  

*) Based on field trip experience & observation

Page 29: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

StoraEnso  mill  in  Ybbs  a.d.  Donau  

Page 30: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

CLT  Manufact.  &  

prefab.  

Cutout  specificaNon  

Primary  processing  

Engineering  design  

Architectural  design  

ConstrucNon  

Transport  

Technical  training  

HarvesNng  

InsulaNon  &  Siding  

Industrial  hardware  design  &  manuf.  

Connectors  &  fi[ngs  hardware  

The  supply  chain  (a  dran)*  

*) Based on field trip experience & observation

Page 31: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Contractor  Fores8  div.  Legno  built  an  8  storey  building  in  Milan  

Page 32: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Cammi  div.  Legname  

Page 33: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

InnovaNveness  of  CLT  Producers  

1  

1.5  

2  

2.5  

3  

3.5  

4  

Product   Process   Bus  Syst  

Level  of  Inn

ovaN

vene

ss  

*) Based on 16 of 21 companies surveyed in 2016.

Page 34: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Key  Sources  of  CompeNNve  Advantage  

1  

1.5  

2  

2.5  

3  

3.5  

4  

4.5  

5  

Quality   Services   Workforce  Skill   Proc  Tech   Partners  

Impo

rtan

ce  

*) Based on 17 of 21 companies surveyed in 2016.

Page 35: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Summary  The organic development of the industry developed in Europe over the last 16 years resulted in a surprising diversity in the manufacturing processes, products and market strategies.

q  Plant capacities vary from less than 3,000 m3 to 60,000 m3 per shift (50% below 10,000 m3)

q  Owners: from family enterprises to international holdings

q  Manufacturing processes and levels of automation vary greatly

q  Press types and sizes vary greatly (no size standard):

q  Vacuum (25%), Hydraulic/Pneumatic (61% including 3 systems with RF)

q  Widths from up to 4 m (4’ to 13’)

q  Lengths from up to 20 m (15’ to 65’)

q  Adhesive systems: PUR (59%) & MUF (22% incl. 3 cured with RF)

q  Layer thickness varies from 1cm to 10 cm (roughly .2” to 4”)

Page 36: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

QuesNons?  [email protected]

Page 37: TheState of$the$GlobalCLT$Industry …...6.5M EU building, 16.5M EU equipment 12,000 m2, 3 shifts, 45 blue collar, 5 white collar employees CLT 6,300 m3; glulam 980 m3; 5,000 m3 concrete

Holzkurier  2011  

Listing 15 manufacturers in Central Europe leaving out at least 4 in existence at the time of publication