Transcript of Theodore to Gilmore 132 Kv transmission line 132 kV transmission line upgrade Application for s211...

  • Theodore to Gilmore 132 kV transmission line upgrade

    Application for s211 exemption consideration report

    April 2013

  • Application for s211 Exemption Consideration Report i Theodore to Gilmore 132kV Transmission Line Upgrade Version: 1.1 FINAL – 12/04/2013

    Table of Contents Application for s211 Exemption Consideration Report – Theodore to Gilmore 132kV Transmission Line Upgrade ............................................................................................................................................ i

    1. Introduction ................................................................................................................................ 1

    1.1. Project ................................................................................................................................. 1

    1.2. Background ......................................................................................................................... 3

    1.3. Public consultation .............................................................................................................. 3

    2. Environmental impact assessment ............................................................................................. 5

    2.1. Impact track ........................................................................................................................ 5

    2.1.1. Impact track triggers ....................................................................................................... 5

    2.2. s211 Process ........................................................................................................................ 6

    2.3. s211 requirements under the Planning and Development Regulation 2008 ..................... 7

    2.4. The s211 application ........................................................................................................... 8

    2.5. Project risk assessment ....................................................................................................... 8

    2.6. Entity referral ...................................................................................................................... 9

    3. Matters of National Environmental Significance ...................................................................... 11

    3.1. EPBC referral ..................................................................................................................... 11

    4. Evaluation of information - Schedule 4 items ........................................................................... 13

    4.1. - Schedule 4, Part 4.2, Item 2 – proposal that involves construction of 132kV electricity transmission lines in excess of 500m in length ............................................................................. 13

    4.2. - Schedule 4, Part 4.3, Item 1 – impacts on species or ecological communities .............. 15

    4.3. - Schedule 4, Part 4.3, Item 2 – Removal of more than 0.5 ha of native vegetation ........ 19

    4.4. - Schedule 4, Part 4.3, Item 3– proposal for development on land reserved under s 315 of the Act for the purpose of a nature reserve ............................................................................. 21

    5. Other potential environmental impacts ................................................................................... 25

    5.1. Traffic ................................................................................................................................ 25

    5.2. Visual Impact ..................................................................................................................... 25

    5.3. Aboriginal and non-Aboriginal cultural heritage .............................................................. 25

    6. Development application considerations ................................................................................. 27

    7. Conclusion ................................................................................................................................. 31

    8. Bibliography .............................................................................................................................. 33

    Appendix 1. - Referral Entity Comments ....................................................................................... 35

    Appendix 2. – EPBC Act Referral Decision ..................................................................................... 41

  • Application for s211 Exemption Consideration Report ii Theodore to Gilmore 132kV Transmission Line Upgrade Version: 1.1 FINAL – 12/04/2013

    Figures

    Figure 1 – Location of Transmission Lines, Application for s211 exemption – Theodore to Gilmore, Purdon 2012. ........................................................................................................................................... 2 Figure 2 - The s211 process ..................................................................................................................... 7

    Tables

    Table 1 - Legal land description and tenancy ......................................................................................... 3 Table 2 - EIS triggers per Schedule 4 of the Act ...................................................................................... 5 Table 3 - Assessment of supporting information - Item 2, Part 4.2, Schedule 4 .................................. 14 Table 4 - Listed species and ecological communities ........................................................................... 15 Table 5 – Protected and rare plants ...................................................................................................... 15 Table 6 - Assessment of supporting information - Item 1, Part 4.3, Schedule 4 .................................. 16 Table 7 - Mitigation measures - species and ecological communities.................................................. 18 Table 8 - Assessment of supporting information - Item 2, Part 4.3, Schedule 4 .................................. 19 Table 9 - Mitigation measures – removal of native vegetation ............................................................ 20 Table 10 - Assessment of supporting information - Item 3, Part 4.3, Schedule 4 ................................ 21 Table 11 - Mitigation measures – works in nature reserve .................................................................. 23 Table 12 - Development application considerations ............................................................................ 28

    Glossary and Definitions

    ACT Australian Capital Territory

    BGGW ‘White box yellow Box – Blakely’s Red Gum grassy Woodland and Derived Native Grassland’: EPBC Act listed ecological community; the ACT equivalent being ‘Yellow Box-Red Gum Grassy Woodland’ listed under the Nature Conservation Act.

    CEEC Critically Endangered Ecological Community (as listed under the EPBC Act)

    CEMP construction environmental management plan

    DA development application

    DM daily maximum (typical daily maximum, TDM)

    EAR Environmental Assessment Report

    EIA environmental impact assessment: the process of identifying, predicting, evaluating and mitigating the biophysical, social, and other relevant effects of development proposals before major decisions and commitments are made1.

    1 International Association for Impact Assessment in cooperation with Institute of Environmental Assessment, UK, ‘Principles of Environmental Impact Assessment Best Practice’, , viewed on 2 June 2009.

  • Application for s211 Exemption Consideration Report iii Theodore to Gilmore 132kV Transmission Line Upgrade Version: 1.1 FINAL – 12/04/2013

    EIS environmental impact statement: a document prepared to detail the expected environmental, social and economic effects of a development, and state commitments to avoid, mitigate or satisfactorily control and manage any potential adverse impacts of the development on the environment2. In the ACT, an EIS is required for proposals in the impact track as per Section 123 of the Planning and Development Act 2007.

    EMF Electromagnetic field (also referred to as electric and magnetic fields): a physical field produced by moving electrically charged objects. It affects the behaviour of charged objects in the vicinity of the field.

    EMP environmental management plan

    EPBC Act The Environment Protection and Biodiversity Conservation Act 1999 (Commonwealth)

    ESDD Environment and Sustainable Development Directorate

    EPA Environmental Protection Authority (part of ESDD)

    milliGauss one thousandth of a gauss. Gauss: unit of magnetic induction in the centimetre- gram-second system of physical units. One gauss corresponds to the magnetic flux density that will induce an electromotive force of one abvolt (10-8 volt) in each linear centimetre of a wire moving laterally at one centimetre per second at right angles to a magnetic flux. One gauss corresponds to 10-4 tesla (T), the International System Unit. The gauss is equal to 1 maxwell per square centimetre, o