The Wedge – ULI Competition 2014

1
the Wedge monumental green space RESIDENTIAL (UPPER) RESIDENTIAL (MKT) RESIDENTIAL (AFFORDABLE CONDO (UPPER) CONDO (MKT) CONDO (AFFORDABLE) SENIOR INDEPENDENT LIVING OFFICE (LEED) OFFICE (CLASS A) RETAIL HOTEL ABOVE STRUCTURED PARKING UNDERGROUND STRUCTURED PARKING Introduction to the grid Transit and pedestrian traffic Wedge + connections Pocket space Sustainability - bWioswale system 363,720 SF 533,300 SF 246,900 SF 271,830 SF 549,150 SF 121,510 SF 48,400 SF 120,000 SF 234,800 SF 312,550 SF 281,500 SF 130,000 SF 925,523 SF 285,720 SF 138,700 SF 123,000 SF 70,000 SF 60,000 SF 112,000 SF 158,520 SF 281,500 SF 130,000 SF 366,133 SF 140,280 SF 242,600 SF 271,830 SF 478,950 SF 121,510 SF 60,000 SF 122,800 SF 119,230 SF 485,440 SF 152,000 SF 123,900 SF 48,400 SF 34,800 SF 73950 SF activation through green development Proposed Mixed Use Purchased Buildings Commercial Proposed Residential Hotel Proposed Demolition Current evelopment Phase I Phase II Phase III Phase Legend Floodplain 13.1% #2 Growth in Nashville’s young adult population between 2007 and 2012. 10th most popular city for millenials, according to Forbes magazine. On Forbes list of the best cities for jobs in 2013. By the numbers... #4 On Forbes list of cities creating the most tech jobs Sidewalk Vehicular Traffic Bike Lane Bioswale Canal Sidewalk Proposed Shoreline Traffic Flow Existing Shoreline Land Use 142014 142014 142014 Discovery World Rivers Edge Music Venue Urban Ecology Center Waste Water Facility Wetland Habitat Cumberland River Pier Rivers Edge District 2016-2017 2020-2021 2018-2019 Phase I Phase II Phase II Total First, we will start dam/ wetland/ Urban Ecology and other public building. Phase 1 will include office building, hotel, retail and residential. Phase 2 will include further construction and development after the water feature construction is finished. 0 64’ 128’ 256’ Phase 3 will incorporate senior housing and sustainable living. Bioswale Parking Lane

description

ULI Hines Student Competition 2014 - Urban Land Institute. The Edge activation through green development.

Transcript of The Wedge – ULI Competition 2014

the Wedge

monumental green space

RESIDENTIAL (UPPER)

RESIDENTIAL (MKT)

RESIDENTIAL (AFFORDABLE

CONDO (UPPER)

CONDO (MKT)

CONDO (AFFORDABLE)

SENIOR INDEPENDENT LIVING

OFFICE (LEED)

OFFICE (CLASS A)

RETAIL

HOTEL

ABOVE STRUCTURED PARKING

UNDERGROUND STRUCTURED PARKING

Introduction to the grid

Transit and pedestrian traffic

Wedge + connections

Pocket space

Sustainability - bWioswale system

363,720 SF

533,300 SF

246,900 SF

271,830 SF

549,150 SF

121,510 SF

48,400 SF

120,000 SF

234,800 SF

312,550 SF

281,500 SF

130,000 SF

925,523 SF

285,720 SF

138,700 SF

123,000 SF

70,000 SF

60,000 SF

112,000 SF

158,520 SF

281,500 SF

130,000 SF

366,133 SF

140,280 SF

242,600 SF

271,830 SF

478,950 SF

121,510 SF

60,000 SF

122,800 SF

119,230 SF

485,440 SF

152,000 SF

123,900 SF

48,400 SF

34,800 SF

73950 SF

activation through green development

Proposed Mixed Use

Purchased Buildings

Commercial

Proposed Residential

Hotel

Proposed Demolition

Current evelopment

Phase I

Phase II

Phase III

Phase Legend

Floodplain

13.1%

#2

Growth in Nashville’s young adult population between 2007 and 2012.

10th most popular city for millenials, according to Forbes magazine.

On Forbes list of the best cities for jobs in 2013.

By the numbers...

#4On Forbes list of cities creating the most tech jobs

Sidewalk

Vehicu

lar T

rafficBike

Lane

Biosw

aleCana

l

Sidewalk

Proposed ShorelineTraffic FlowExisting ShorelineLand Use

142014 142014142014

Discovery World

Rivers Edge Music Venue

Urban Ecology Center

Waste Water Facility

Wetland Habitat

Cumberland River Pier

Rivers Edge District

2016-2017

2020-2021

2018-2019

Phase I Phase II Phase II Total

First, we will start dam/ wetland/ Urban Ecology and other public building. Phase 1 will include office building, hotel, retail and residential.

Phase 2 will include further construction and development after the water feature construction is finished.

0 64’ 128’ 256’

Phase 3 will incorporate senior housing and sustainable living.

Biosw

ale

Parkin

g Lane