THE VIDYALAYA PLAN - K.V. · PDF filekendriya vidyalaya, ins shivaji, lonavla (mumbai region)...

22
KENDRIYA VIDYALAYA, INS SHIVAJI, LONAVLA (MUMBAI REGION) VIDYALAYA PLAN SESSION 2016 - 2017 VIDYALAYA PROFILE 1 Name of the Kendriya Vidyalaya KENDRIYA VIDYALAYA, INS SHIVAJI, LONAVLA 2 Sector: Defence (Navy) 3 Vidyalaya building (Temp/Perm): Permanent 4 Established in: 1963 5 Classes up to: XII th Science & Commerce 6 No. of Sections: Classes I to VI & XI, XII: 2 Sections, Classes VII to X: 1 section each. 7 Streams: Science and Commerce 8 Total students’ strength of the Vidyalaya: 586 9 No. of sanctioned staff in position: Principal: 01, VP: 00, HM: 00, Teaching Staff: PGTs: 09, TGTs: 05, PRTs: 11, Misc: 05 Non-teaching staff: UDC: 01, LDC: 01, Sub staff: 06 10 Vacancy position: UDC: 01, Sub Staff: 01 11 Name of the Principal: Mrs Indra Devi Jain 12 Academic Results: Class Pass % PI / % of Grades /% of students Scoring 75 %and above Remarks XII 100 PI: 52, No. of students scoring 75% & above: 03 X 100 PI: 72.5, No. of students with 10 CGPA: 06 XI 94.6 No. of students securing 75% & above: 03 IX 89.5 No. of students securing grades: A1 (Overall)-06 VIII 100 No. of students securing grades: A1 (Overall)-06 VII 100 No. of students securing grades: A1 (Overall)- 07 VI 100 No. of students securing grades: A1 (Overall)-14 I-V 100 ---------------- 13 No. of Internal Audit Paras pending as on 31 March 2016 10 No. of AG Audit Paras pending as on 31 March 2016 03 No. of Internal Audit Paras settled during2015-16 All paras settled for 2014-15 No. of AG Audit Paras settled during2015-16 01 14 VVN Balance as on 31 March 2016 Rs 21,182 Approx. estimation of Collection of VVN per Quarter Rs. 8 Lakh

Transcript of THE VIDYALAYA PLAN - K.V. · PDF filekendriya vidyalaya, ins shivaji, lonavla (mumbai region)...

  • KENDRIYA VIDYALAYA, INS SHIVAJI, LONAVLA (MUMBAI REGION) VIDYALAYA PLAN

    SESSION 2016 - 2017 VIDYALAYA PROFILE

    1 Name of the Kendriya Vidyalaya KENDRIYA VIDYALAYA, INS SHIVAJI, LONAVLA

    2 Sector: Defence (Navy) 3 Vidyalaya building (Temp/Perm): Permanent

    4 Established in: 1963 5 Classes up to: XIIth Science & Commerce 6 No. of Sections: Classes I to VI & XI, XII: 2 Sections, Classes VII to X: 1 section each.

    7 Streams: Science and Commerce 8 Total students strength of the Vidyalaya: 586

    9 No. of sanctioned staff in position: Principal: 01, VP: 00, HM: 00, Teaching Staff: PGTs: 09, TGTs: 05, PRTs: 11, Misc: 05 Non-teaching staff: UDC: 01, LDC: 01, Sub staff: 06

    10 Vacancy position: UDC: 01, Sub Staff: 01 11 Name of the Principal: Mrs Indra Devi Jain

    12 Academic Results:

    Class Pass % PI / % of Grades /% of students Scoring 75 %and above Remarks

    XII 100 PI: 52, No. of students scoring 75% & above: 03

    X 100 PI: 72.5, No. of students with 10 CGPA: 06

    XI 94.6 No. of students securing 75% & above: 03

    IX 89.5 No. of students securing grades: A1 (Overall)-06

    VIII 100 No. of students securing grades: A1 (Overall)-06

    VII 100 No. of students securing grades: A1 (Overall)- 07

    VI 100 No. of students securing grades: A1 (Overall)-14

    I-V 100 ----------------

    13 No. of Internal Audit Paras pending as on 31 March 2016 10

    No. of AG Audit Paras pending as on 31 March 2016 03 No. of Internal Audit Paras settled during2015-16 All paras settled for 2014-15 No. of AG Audit Paras settled during2015-16 01

    14 VVN Balance as on 31 March 2016 Rs 21,182 Approx. estimation of Collection of VVN per Quarter Rs. 8 Lakh

  • (I) Development and Maintenance of Infrastructural and Other Facilities S. No

    Activity/ Programme Status Planned Achievement/

    targets

    Expected date/time

    of completion

    Key Result Areas/ Programme of

    action

    Responsible Person

    A Construction Work 1

    Construction of 5 new Classrooms

    5 more rooms are required by 1920 due to conversion/ natural growth of Vidyalaya from single section to double section in Classes VI to X

    Letter will be sent to GE for REC & for sanctioning of fund from KVS HQ.

    Mar-2018 Planned early as the gradual growth from Class VI has already started.

    Mr.Pankaj Mathur

    2 Construction of Ramp on Primary and Secondary wing Ground Floor for Disabled

    Work complete Ramp constructed during 2014-

    15

    --- Ramp has

    already been

    constructed at

    the main

    entrance.

    -----

    B Special Repairs

    1 Re plastering of the Wall (1500+ 1500 Sq Mtr with 3000 Sq. Mtr Paint Area) damaged due to seepage

    Letter has already been sent to GE, MES

    RCEs invited & to be taken up

    after the rainy season.

    May 2017 -- Mr Pankaj Mathur,

    PGT (Phy)

    2 Mathematical garden Not available

    Place will be explored Dec 2016 Area earmarked Mrs. Mamta Rani, Mr.

    Jitender and Mr.

    Somnath.

    3 BALA (Buildings Learning

    Aid)

    Teachers are using Building

    as a teaching-learning tool

    Maps, Tables, Pictures,

    portraits, Charts etc to be

    procured for display on

    building walls.

    Dec 2016 Feasible facilities

    will be explored

    Mrs. Mamta Rani, Mr.

    B k Patra and

    Mr. Somnath.

    C Regular Annual Repairs

    1 White Wash and Paint Was done in Dec.2013 To be done in autumn break 2016 Oct. 2016 After taking

    estimate fund will

    be asked from RO

    VVN Deposit fund.

    Mr. Pankaj

    Mathur

    2 Repairing of cooler Working To be maintained regularly ----- ---- Mr. Somnath

  • D Maintenance of Infrastructural Facilities

    S. No

    Activity/ Programme Status Planned Achievement/

    targets

    Expected date/time

    of completion

    Key Result Areas/ Programme of

    action

    Responsible Person

    Maintenance of Children Park

    Park not available Development of park depends on the availability of funds.

    Under

    consideration

    Mr.A.K.Sharma

    Maintenance of cooler

    One more cooler is required and existing coolers are repaired

    AMC to be awarded for maintenance of coolers. Additional cooler procurement planned.

    Sept 2016 --- Mr.Somnath

    E Procurement of Services

    Conservancy Contract has already been

    made w.e.f. April. 2016 and

    Gardener is available

    Continuous monitoring is

    done by the concerned

    teachers

    Regular monitoring House wise

    committees

    formed

    Mr. A.K.Sharma,

    Mr.RR Gawande

    Mrs.Archana Kumari

    Security

    Gardening

    Printing Readiness programme

    booklet was printed.

    Printing papers & sheets Procured April 2016 Printing of QPs,

    Certificates, Report

    Cards etc is being

    done in Vidyalaya

    Mrs.Shobhana Nichat

    AMC Computers AMC has been awarded Proper functioning of all computers.

    Regular maintenance

    Co-operation of all teachers

    Mrs.Kshama raut

    AMC Other Gadgets Aquagard , Photocopy ,

    smartboards, visulizers

    Proper utilization of

    resources

    Regular basis Co-operation of

    all teachers,

    students

    council.

    Mr.Jitender ,

    Mr.RA Patil

    Mrs.Kshama Raut

  • F Cleanliness

    S. No

    Activity/ Programme Status Planned Achievement/

    targets

    Expected date/time

    of completion

    Key Result Areas/ Programme of

    action

    Responsible Person

    Toilets

    Repaired & working Neat and hygienic (Cleanliness at 11:30 and 2:30)

    Cleaning on Regular basis

    Regular monitoring by in charges

    Mrs.Archana, Mr.A.K.Sharma Mr.Jitender kumar

    Drinking Water Area Potable drinking water

    available,

    purifiers installed & working Continuous

    monitoring

    Water testing

    done by INHS

    Kasturi

    Mr Jitender Kumar

    Corridors cleaned Mopping at 9:00, 3:00 Mr R R Gawande

    Class rooms cleaned After school hours (on all days)

    Monitored by class teacher

    School Ground Developed & Maintained Developed for Basket Ball, Volley Ball, Foot Ball, Throw Ball etc

    Cleanliness ensured

    Got leveled &

    rolling done

    recently

    Mr A K Sharma

    G Development of Garden

    Botanical Garden Under development

    Some medicinal plants have

    been planted. More plants

    will be planted soon.

    Oct 2016 Children can

    identify

    plants and

    will get

    knowledge

    of utility

    Mrs Archana Kumari

    Flower Garden To be developed

    Plants to be planted August 2016 - Mr Somnath P

    H Development of Play Ground, Children Park ,BS &G Corner ,NCC Corner, Activity Room, Resource Room, Maths Lab, JSL etc.

    Play Ground fair Developed in Feb-16, April 2016, further development to be explored.

    August 2016 Facility for different

    sports availaable Mr A K Sharma

    Childrens Park No play equipment at present

    To be developed Subject to availability of fund

    Letter already sent to KVS (HQ)

    Mr A K Sharma

    BS&G CORNER NOT AVAILABLE TO BE DEVELOPED SOON Oct 2016 WILL BE A LEARNING CORNER

    Mr. B.K.PATRA & All

    Scout & Guide

    Teachers.

  • S. No

    Activity/ Programme Status Planned Achievement/

    targets

    Expected date/time

    of completion

    Key Result Areas/ Programme of

    action

    Responsible Person

    Activity Room/ Resource Room AVAILABLE Maintained & utilized

    To improve further

    DEC.2016 PAINTINGS OF FUNCTIONS TO PURCHASE NEW SPEAKERS.

    Mrs. SHOBHANA

    Maths Lab AVAILABLE

    TO IMPROVE BY DEVELOPING

    TEACHING TOOLS & MODELS

    ENGAGING STUDENTS.

    DEC.2016 TO PROCURE SOME MODELS FROM OUTSIDE

    MRS.MAMTA to visit

    BARC, Mumbai for

    the same.

    Junior Science Lab AVAILABLE, WELL EQUIPPED. DECORATION PLANNED

    AUGUST 2016 PROCUREMENT OF DISPLAY MATERIAL AND MATERIAL TO BE PREPARED BY CHILDREN.

    MRS.ARCHANA K

    I Purchase of Lab Equipment, Consumables, Computer and Accessories, Generator,ACs, Coolers, Stationary, Audio-VisualAids

    Purchase of Lab Equipment

    ,Consumables ,Computer and

    Accessories, Stationary

    ,Furniture etc.

    Consumables, Computer

    accessories, stationary

    procured and adequate

    furniture is put to use after

    necessary repairs.

    Requisition for additional

    requirements shall be called

    & stocks to be procured

    beforehand.

    Requisition by August end.

    Adequately

    procured.

    All Stock I/Cs

    Purchase of Generator Letter for fund has already

    been sent to RO.

    To be procured on receipt of funds Subject to receipt of fund from RO

    Procurement & expenditure approved by VMC

    -Mr.Pankaj Mathur & Mr.Jitender kumar

    Purchase of ACs Not available for computer

    rooms

    Requirement: 2 Nos of 1.2 ton each. To be procured in installments.

    August 2016 & March 2017

    To be procured as and when funds become available

    Mrs Kshama Raut.

    Purchase of Water Coolers Available: 02 Nos One more is required and Will

    be purchased

    Nov. 2016 - Mr Somnath

    Purchase of Water Purifier Having sufficient -

    - -

  • J Purc