The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during...

14
The timetable of the project from 10.11.2011.

Transcript of The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during...

Page 1: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

The timetable of the project from 10.11.2011.

Page 2: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

Plan, we would like to organize a roundtables during 3-4 weeks with the below dates:

1. roundtable: 15.11.2011.2. roundtable: 18.11.2011.3. roundtable: 21.11.2011.4. roundtable: 22.11.2011.5. roundtable: 25.11.2011. 6. roundtable: 28.11.2011.7. roundtable: 29.11.2011.8. roundtable: 02.12.2011.9. roundtable: 05.12.2011.

Page 3: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

According to the below settlements

Page 4: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

1. Place: LakócsaCroatian roundtable’s

settlements:- Lakócsa- Potony- Tótújfalu- Szentborbás

2. Place: DarányEast-region roundtable’s

settlements:- Darány - Drávagárdony- Drávatamási- Istvándi- Kastélyosdombó

Page 5: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

3. Place: BarcsMid Region roundtable’s settlement: - Barcs

4. Place: CsokonyavisontaNorth region roundtable’s settlements: - Csokonyavisonta- Rinyaújlak

Page 6: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

5. Place: HomokszentgyörgyNortheast region roundtable’s settlements: - Homokszentgyörgy- Lad- Patosfa

6. Place: SzulokMideast region roundtable’s settlmenets: - Szulok- Kálmáncsa

Page 7: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

7. Place: BabócsaMidwest region roundtable’s settlements: - Komlósd- Péterhida- Somogyaracs- Rinyaújnép- Babócsa

8. Place: BolhóWest region roundtable’s settlements: - Bolhó - Heresznye

Page 8: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

9. Place: VízvárNorthwest region roundtable’s

settlements: - Vízvár

- Bélavár

Page 9: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

What we will be concerned:- Strengths, Weeknesses, Threats, Opportunities on the level of social and

economic involved the non-government organizations and enterpreneursFor example:

- which employees would be needful for the micro-region-in which sector of economic would be the best, which provides

advantages the micro-region- migrations, trainings

- tourism- infrastructures

if you have any actionplans or measures, we would be very glad, if you provide them us

Page 10: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

The deadline of the SWOT analyze, which will base on the roundtables is

31.12.2011.

The deadline of the commond study 31.08.2031.08.2012.

Page 11: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

The planned dates of the other two workshops :

month of February in 2012.month of September in 2012.

Page 12: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

The planned date of the final conference and press conference in Barcs:

in the mid of September in 2012.

Page 13: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

We would like to thank you your attention and cooperation concerning the implementation of the project.

Page 14: The timetable of the project from 10.11.2011.. Plan, we would like to organize a roundtables during 3-4 weeks with the below dates: 1. roundtable: 15.11.2011.

Contact:Dél-Dunántúli Terület- és Gazdaságfejlesztő

Nonprofit Kft.7625 Pécs, Dr. Majorossy Imre u. 36.

Tel.: 72/314-845Fax: 72/314-867

Email: [email protected]

Our first control body: VÁTI NKft.Dél-Dunántúli Területi Iroda7621 Pécs, Rákóczi út 62-64.