The Swedish data hub

Overall project information

January 2018

First release

Page 2: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Agenda

Introduction

Time plan

Functions

Further information

January 2018 The Swedish data hub - Overall project information - First release 2

Page 3: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

When the central, IT-system, the electricity market data hub is

introduced the market model will switch to supplier centric

January 2018 The Swedish data hub - Overall project information - First release 3

• Data hub – a central IT-system

• Supplier centric market model

Two components of the change The data hub

The data hub simplifies and improves

• One single source of valid information

• All data exchange via the data hub

• Centralizing important processes

• Centralizing grid loss calculations

• Enables innovation and new types of energy services

• Competition on common basis

Page 4: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Svenska kraftnät and the Energy Markets Inspectorate are cooperating

with market participants and involved governmental bodies

January 2018

Coalition partners

”Propose regulatory changes to

enable the introduction of a central IT-

system and a supplier centric market

model

Energy Markets Inspectorate

”Establish and operate the data

hub.”

Svenska kraftnät

The Swedish data hub - Overall project information - First release 4

Page 5: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

January 2018

Svenska kraftnät has been given the assignment to establish and

operate a data hub for the Swedish electricity market

The Swedish data hub - Overall project information - First release 5

2014 Report from Ei

2015 Assignment from

the government

2016 Pre-study report from Svk

June 2017 Report from Ei

Page 6: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

The introduction of the data hub is comparable to a second

deregulation of the swedish electricty market

January 2018

Year

Market model

1996

1.0 Deregulation

of the

electricity

market

2021

2.0 Data hub and supplier centric

market model

2017

”1.5” Nordic Balance

Settlement

The Swedish data hub - Overall project information - First release 6

Page 7: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Svenska kraftnät organisation for project data hub (Elmarknadshubb)

January 2018

Organisation project Elmarknadshubb

En

erg

y M

ark

ets

Ins

pec

tora

te

Go

ve

rnm

en

t

Steering group

Project manager

IT Business

Demands

Change

Management Procurement

Working and expert groups

Reference

group

The Swedish data hub - Overall project information - First release 7

Page 8: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Introduction

Time plan

Functions

Further information

Agenda

January 2018 The Swedish data hub - Overall project information - First release 8

Page 9: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Tim

e p

lan

2017 2018 2019 2020

H1 H2 H1 H2 H1 H2 H1 H2

Time plan for introduction of the data hub (indicative)

The Swedish electricity market data hub could at the earliest be

introduced by Q4 2020

Demand focus

Procurement

Implementation

Migration and validation activities

January 2018

Commissioning*

Demands

Procurement

Implementation

Migration activities – Pilot group

Migration activities - Mandatory

* Commissioning at the earliest Q4 2020

The Swedish data hub - Overall project information - First release 9

Page 10: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Tim

e p

lan

2017 2018 2019 2020

H1 H2 H1 H2 H1 H2 H1 H2

Time plan for introduction of the data hub (indicative)

Market participants will be actively preparing their structure data from

mid 2018

January 2018

Pilot evaluation

Pilot migration

Evaluation Validation

(initial) Validation and migration

The Swedish data hub - Overall project information - First release 10

Demand focus

Procurement

Implementation

Commissioning*

Demands

Procurement

Implementation

Migration activities – Pilot group

Migration activities - Mandatory

* Commissioning at the earliest Q4 2020

Page 11: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

To enable the introduction of the data hub major changes to the

regulatory frame work are needed

January 2018 The Swedish data hub - Overall project information - First release 11

Steering regulation for the data hub

Riksdagen ”Data hub law”

”Electricity law”

Government ”Secondary regulation”

”Regulation”

Svk ”Ediel agreement”

”GDPR”

Page 12: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Introduction

Time plan

Functions

Further information

Agenda

January 2018 The Swedish data hub - Overall project information - First release 12

Page 13: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

The data hub will have an effect on all market parties active on the

swedish electricity market

January 2018 The Swedish data hub - Overall project information - First release 13

Producers

Retailers

Transmission grid

Regional grid

Regional grid Local grid

Consumers

Page 14: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

When commissioned it will serve multiple market participants

January 2018

Hub

RE

DSO

BRP

Energy Service provider

eSett Oy

The Swedish data hub - Overall project information - First release 14

Ca 150 retailers

Ca 180 distribution system operators

Ca 30 balance responsible parties

Unknown

Ca 10 parties

1 user

Statistics

Page 15: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Most of the central processes will be initiated by market parties and

performed in the data hub

January 2018

Hub

RE

DSO

BRP

Energy Service provider

Statistics

eSett Oy

Basis for

Balance

Settlement

Basis for

joint

invoicing

Grid

settlement

Structuring

metering

points

Supplier

switch

Basis for

Balance

Settlement

Meter data

handling

Simple MP

communi-

cation

Move out Move in

Connect /

disconnect

Customer

data update

Grid tariffs

Settlement

data

Report &

statistics

Report meter

values

The Swedish data hub - Overall project information - First release 15

Authority

Page 16: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

The data hub will serve around 400 market parties and handle

multiple processes

January 2018 The Swedish data hub - Overall project information - First release 16

~40 000 supplier switches per

month

All structure data to eSett

Daily distribution of settlement

data to eSett Oy

Approximately 400 000 move

in/out processes per annum

The data hub will handle consumption

data to a value of approximately 37

billion SEK per annum based on spot

price1

1. Based on 135 TWH annual consumption in Sweden, average annual FX (euro/sek) 2016 & average spot price on NordPool

2. http://www.ekonomifakta.se/Fakta/Skatter/Skattetryck/Skatteintakter-per-skatt/

3. En svensk-norsk elcertifikatsmarknad, årsrapport 2016

Settlement data as basis for

energy tax approximately 20

billion SEK per annum2

20 million green certificates

per annum3

Page 17: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

Introduction

Time plan

Functions

Further information

Agenda

January 2018 The Swedish data hub - Overall project information - First release 17

Page 18: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

The following documents are available in Swedish on the project

homepage 1(2)

January 2018

• Pre-study report

Pre-strudy report

www.svk.se/hubb

The Swedish data hub - Overall project information - First release 18

• In depth information about

the information model

Information model

www.svk.se/hubb

• Process descriptions

• BRS documents

Process documentation

www.svk.se/hubb

Page 19: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

PROJECT – DATA HUB

3 Information letters during 2017

The following documents are available in Swedish on the project

homepage 2(2)

January 2018

• Overall information about

the data hub

¨Fact sheet

www.svk.se/hubb

• Information letters are sent out on a regular basis with a minimum

of 3 letters per year.

During 2017 the following information letters were distributed:

#1 Maj 2017

#2 September 2017

#3 December 2017 www.svk.se/hubb

The Swedish data hub - Overall project information - First release 19

Page 20: The Swedish data hub · 2018-01-04 · PROJECT – DATA HUB When the central, IT-system, the electricity market data hub is introduced the market model will switch to supplier centric

Thank you!

[email protected]

www.svk.se/hubb