The Subic Clark Alliance for Development
and the SCAD Corridor
A Presentation to the SPECIAL COMMITTEE ON BASES CONVERSION
ByLinda B. Pamintuan
Executive Director, SCAD
5 February 2014Congress of the PhilippinesHouse of Representatives
Outline
1. Agreements and Issuances Creating and Defining Subic-Clark Alliance for Development Council
2. Composition of the SCAD Council3. Vision/Mission4. Projects from 2006-20105. Projects from 2011-present6. Current Role of SCAD7. Gaps and Challenges
www.scadcouncil.com
Agreements and Issuances Creating and Defining SCADC
www.scadcouncil.com
Memorandum of Understanding between Department of Trade and Industry (DTI), Bases Conversion and Development Authority (BCDA), Subic Bay Metropolitan Authority (SBMA) and Clark Development Corporation (CDC) creating SCAD Program.
EO 365 was issued defining the functions of the President Adviser for the Subic-Clark Area Development.
EO 504 created the Subic-Clark Alliance for Development Council (SCADC).
EO 504-A defined the powers and functions of SCADC amending EO 504.
19 June 2001
27 September 2004
1 February 2006
10 April 2008
The SCAD Council
1. Chairman - concurrent Chairman of the Bases Conversion and Development Authority
2. Vice Chairman - concurrent Chairman of Clark Development Corporation
3. Chairman and Administrator of the Subic Bay Metropolitan Authority
4. Alternate Chairman of the Clark International Airport Corporation – concurrent Secretary of the Department of Transportation and Communications
5. President of Bases Conversion and Development Authority6. President of Clark Development Corporation7. President of Clark International Airport Corporation8. President of North Luzon Railways Corporation
www.scadcouncil.com
Vision
A world-class Mega Logistics Hub that provides seamless delivery of goods, services, people and
information to and from the production, manufacturing and trading centers of the country, which will serve the
Asia-Pacific Supply Chain.
www.scadcouncil.com
Mission
To enable the integrated and sustainable development of the Subic-Clark-Tarlac Corridor as the Philippines' main
gateway, bringing in investments and generating employment, thus improving the quality of life in the
Corridor and its environs, in line with the principles of good governance, accountability and transparency, and public-
private partnerships set by the national leadership.
www.scadcouncil.com
Projects
• Benchmarking missions to other logistics hubs• Consultations with logistics industry players• Coordination with international agencies and firms
that could provide grants in the development of a master plan and a business plan for the Subic-Clark Corridor.
• Lobbying for the granting of Freeport Status to Clark Special Economic Zone
• Development options for the DMIA Gateway Project• Registration of SCAD Corporation with SEC
www.scadcouncil.com
2006
Activities
• Monitored the development of:– SCTEX– New Subic Container Ports 1 and 2
• Resolved issues and concernswww.scadcouncil.com
2006
Projects
Harmonization of Policies and Procedures for Subic and Clark
Major Successes in:• Immigration • Customs • Quarantine• Business Registration
www.scadcouncil.com
2007-2010
Projects – 2007 -2010
• Customs– Implemented the electronic Transit Admission Permit
(e-TAPS) in December 2008– Bureau of Custom’s (BOC) approval of importer/
exporter on-line accreditation by mere CDC/SBMA endorsement
– Migration of BOC’ import permitting system to electronic to mobile (e2M) system
– Electronic Export Declaration System (EEDS). – Agreement for Clark and Subic to pilot study the
electronic Certificate of Origin (eCO)
www.scadcouncil.com
Harmonization of Policies and Procedures
www.scadcouncil.com
BEFORE PRESENT Procedures/Steps 6 1
Signatures 6 0
Time Average 96 hours/4 days 2 minutes
Form/s to be presented to Bureau of Customs (BOC) upon arrival of cargo
4 1 (for Direct Discharge Subic/Clark)2 (for Discharge Manila)
Cost of delivery of documents to SBMA/CDC and Port of Discharge
Php175/set of documents Php55 for VASP charges
Underguarding (BOC to accompany cargo to Clark/Subic)
Php1,500/containerChoice between underguarding and General Transportation Surety Bond
(GTSB)
Electronic Transit and Admission Permit System (ETAPS)
Projects – 2007-2010
• Immigration– Implementation of new Subic-Clark Immigration
System in October 2009– Establishment of One-Stop-Shop (Immigration
Center) in Clark and Subic, October 2009.
www.scadcouncil.com
Harmonization of Policies and Procedures
www.scadcouncil.com
Subic-Clark Immigration System
BEFORE PRESENT
Documentary Requirements
Average 12 Average 4
Processing Time Average 7 2 days(Endorsement: 8 hours;
Issuance: 8 hours)
Cost Average US$ 150 Average US$ 75
Processing Office 4 Offices(Freeport, DOLE, BI Region
III, BI Central)
1 Office(One-Stop Shop)
I-Card Issuance Central Office (Manual Processing)
One Stop Shop (AutomatedProcessing)
Projects – 2007-2010
Harmonized Business Registration System in Subic and Clark
www.scadcouncil.com
Harmonization of Policies and Procedures
Projects
• SCAD Mega Logistics Forum Series• Inbound and Outbound Trade Missions• Benchmarking Missions• Advocacy for the Open Skies Policy for Clark• Communications program to inform the public about
SCAD, Logistics and the Corridor
www.scadcouncil.com
2007-2010
Projects
One of the objectives of SCAD then was to develop a Master Plan for the SCAD Corridor (Tarlac, Pampanga, Bataan and Zambales).
Terms of Reference- completed.
But because of the lack of funds, the SCAD Council decided on developing it by phase.
www.scadcouncil.com
2007-2010
Projects
• Subic-Clark Conceptual Land Use Plan (SCOLUP)• Metro Clark Area (MCA) Framework Plan• Metro Subic Area (MSA) Framework Plan
www.scadcouncil.com
2007-2010
Projects – 2007 -2010
www.scadcouncil.com
Subic-Clark Conceptual Land Use Plan (SCOLUP)
Tarlac - Land HubClark - Air HubSubic - Sea Hub
Projects
www.scadcouncil.com
Metro Clark Area (MCA) and Metro Subic Area (MSA) Framework Plans
Metro Clark Area (MCA) Framework Plan
Metro Subic Area (MSA) Framework Plan
UncertaintyLack of Funding
SCAD Council directive:
Concentrate on harmonization and coordination functions
www.scadcouncil.com
Since 2011…
Projects- 2011-present
• Trade Facilitation - Customs, Immigration and Quarantine » Electronic Cross-Border Information Exchange
• Tourism Development» Subic-Clark Tourism Roadmap» Tourism Road Infrastructure Projects under the DOT-DPWH
Convergence Program» Tourism Packages
• Harmonization of the Business Start-up and Registration System for the BCDA Group, AFAB and SBMA• Marketing of the Port of Subic Bay • Investment Promotions
www.scadcouncil.com
Focus is on the following projects:
Projects – 2011 - Present
eZ-Biz – The Harmonized Business Start Up and Registration Systems in the BCDA Group, SBMA and AFAB
– eZ-Biz has 7 steps with an estimated 20 working days or less.
– It will have common: • Processing Duration• Final Documents• Registration Fees• Documentary Requirements
– 40-80% Improvement in processing duration (days)
www.scadcouncil.com
www.scadcouncil.com
New Business Start Up and Registration ProcessStep Activity Duration
1
Submission of Letter of Intent (LOI)a/ and other required documents
1 day
by the Investor to the IPA:a.Application Forma/, with Feasibility Study/Business Plan
(if and as required)b.Project Brief/Company Profile (Resume of Principal Officers)c.Notarized undertaking and anti-graft certificatea/ d.Board Resolution of Duly Authorized Representativee.SEC Registration and Articles of Incorporation
f.Proof of Financial Capability/Assets - Bank Certification of Credit Line or Deposits, Paid Up Capital, Assets
g.Audited Financial Statements for last 3 years of operation, if applicableh.Proposed/Existing Site Development Plan/Location Map -if and as required
2
Evaluation (of Investor and Proposed Business) by the IPA
5 daysa.Review by Individual Evaluation Committee Members (all concerned
departments) - Background check, etc.
b.Evaluation Committee Meeting (Presentation/Approval of the Proposal)
3 Preparation of Evaluation Report by the appropriate IPA Department/Unit 1 day
4Finalize Lease Agreement 1 day
Final Review by Investor
5Board Deliberation and Approval (including securing of initials)
10 days *Materials : Draft Contract, Evaluation Report
6
Notification of Project's Approval by IPA to the Investor
1 day Proponent prepares to submit all other necessary documents
required before signing of Lease Agreement and processing of Certificate of Registration and Tax Exemption
7Signing of Contract (Lease Agreement) between IPA and Investor
1 day Processing and Issuance of Signed Certificate of Registration and
tax Exemption (CRTE)20 WORKING DAYS
Current Role of SCAD
www.scadcouncil.com
Gaps and Challenges
• Funding• Uncertainty/Instability• No security of tenure for the staff
www.scadcouncil.com