THE SANDERSON PROJECTFinding the S vs. Q relationshipBy: Cody Hudson
![Page 2: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/2.jpg)
SITES Background Water Resources “Site”
Analysis Program Developed for NRCS Performs hydrologic
and hydraulic analyses of water control structures
Calculates spillway stability
![Page 3: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/3.jpg)
Single Event Analysis Used to simulate
design storm through existing structures
Calculates Inflow HydrographOutflow HydrographSpillway StabilityStorage/Outflow
![Page 4: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/4.jpg)
Hydrology (Inflow)
Enter Rainfall or Hydrograph
Calculate SCS Hydrograph based on Basin characteristicsRainfall amountRainfall distribution
![Page 5: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/5.jpg)
Elevation-Storage
E(S)=Elevation function of storage
dE(S)
![Page 6: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/6.jpg)
Hydraulics(Outflow) Principal Spillway
Orifice flowWeir flow
L
WD
![Page 7: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/7.jpg)
Hydraulics(Outflow) Auxiliary Spillway
Open Channel FlowWidthSide SlopeChannel SlopeLengthManning’s n
2/13/2 SARnkQ
![Page 8: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/8.jpg)
Watershed Schematic
Structure
Reach
UncontrolledSubwatershed
Junction
![Page 9: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/9.jpg)
Sites ModeloCN=60o6hr 100 year rainfall = 5.11 inoPeak Flow = 10,323 cfs @ 8.6 hr
![Page 10: The Sanderson Project](https://reader035.fdocuments.net/reader035/viewer/2022062501/5681684a550346895dde3d44/html5/thumbnails/10.jpg)
Sites ModeloCN=74o6hr 100 year rainfall = 5.11 inoPeak Flow = 18590 cfs @ 6.5 hr