The Road to Success is Always Under Construction
Soil Erosion & Construction Storm Water Compliance Tips, Techniques & Examples
Presented by: Sarah Ehinger, DEQ
Compliance
Inspections & Things to Look
For On-Site
Emerging SESC Product – Bonded Fiber Matrix
Plans, Procedures, Maintenance
Contract Language
Soil Erosion Plans
Limits of Earth Change
“The earth disturbance limit for this project will be limited to 10’ beyond the slope stake line or to the ROW line, whichever is less for all areas except for wetland areas. For areas adjacent to wetlands, the earth disturbance limit will be limited to the slope stake line.”
Drainage & Dewatering Locations
Timing & Sequencing
September October November December
Temporary SESC Measure Install
Strip & Stockpile topsoil
Rough Grade
Construct Road
RestorationPermanent SESC
September October November December
Strip & Stockpile topsoil
Install TemporarySESC Measures
Rough Grade
Construct Road
RestorationPermanent SESC
SESC Installation Details
SESC Procedures
Ditch Clean Out
Use Contract Language to
Drive Compliance
Stabilize As You Go
Inspections
Winter Inspections
Earth Work Has Ceased
SESC Measures In & Working
Consistently Below Freezing
What to look for ... Besides the
Obvious
Other Pollutants
Polyacrylamides
Blanket Install
Bonded Fiber Matrix
Conclusion
Questions