THE RION ANTIRION BRIDGE

10
T-THE RION-ANTIRION BRIDGE ATUL KUMAR (1212200039) SEMINAR PRESENTATION SHRI RAMSWAROOP MEMORIAL GROUP OF PROFESSIONAL COLLEGES, LUCKNOW Under the guidance of - MS. SHRUTI CHANDRA

Transcript of THE RION ANTIRION BRIDGE

Page 1: THE RION ANTIRION BRIDGE

T-THE RION-ANTIRION BRIDGE

ATUL KUMAR (1212200039)

SEMINAR PRESENTATION

SHRI RAMSWAROOP MEMORIAL GROUP OF PROFESSIONAL COLLEGES, LUCKNOW

Under the guidance of -MS. SHRUTI CHANDRA

Page 2: THE RION ANTIRION BRIDGE

INTRODUCTION

• LOCATION- over the Gulf of Corinth, Western Located over the Gulf of Corinth, Western Greecee

total length 2 880.400 m deckdeck depth 2.82 m span lengths 286 m - 3 x 560 m - 286 m pylons pylon height (above deck) 113.00 mdeck width 27 .20 m girder depth 2.7m main bridgemain span 560 m

cost of construction -----Euro 630 000 000

deck composite steel-reinforced concrete piers reinforced concrete Materials

Page 3: THE RION ANTIRION BRIDGE

This project quite complex:• large water depth (up to 65 m) • deep soil strata of weak alluviums• a strong seismic activity• possible tectonic movements

Page 4: THE RION ANTIRION BRIDGE

Concept

• Hanger• Pepsi bottele• Sprinlke system• Chimney

Page 5: THE RION ANTIRION BRIDGE

1 Logic

• Silty clay -liqufiction-

• Quick sand condition—Japan earthquake

• Concept used – Vital grass root (7m long)

Page 6: THE RION ANTIRION BRIDGE

2. Logic

Topling • Each pier moves freely

Page 7: THE RION ANTIRION BRIDGE

3. Logic

• Deck movement in earthquake zoneDeck free to moveViscus damfer- control the movement Control the movement – Sprinkling –(60-68*C)Pepsi bottel

Page 8: THE RION ANTIRION BRIDGE

4.Logic

• Cables 1997- wind effect Chimney – helical strips

Page 9: THE RION ANTIRION BRIDGE

SILT CLAY SOLUTIONLIQUIFICATION

Page 10: THE RION ANTIRION BRIDGE

USE THE NEW CONCEPT & DEVELOP

THE ENGINEERING

• `

THANK YOU