The Ranch at ArringtonProposed Multi Family Development
Site Location
Arrington UpdateCounty/City/Developer Meeting - 2/16/17-Condition vs. Capacity-No regulatory requirement for improvements-Upgrading condition of Arrington benefits The Ranch-Developer participation
Timing-Mesa Verde Extension projected completion date 12/31/17-Arrington can start construction after Mesa Verde complete
Tracking Roads Advisory Committee Update
TRAC Members/Developer Meeting – 2/16/17-Arrington Road Update-80’ Right-of-Way
-Dedications on west side of Arrington-Relocate BTU and Wellborn SUD facilities
-Access-Fire, required-Secondary, not required, must maintain connection to
Arrington -Buffer
Site Plan
Development Buffer
The Ranch
DemographicsYoung Professionals
ViaSat – 300 jobs, $64,000 average salaryFujifilm – 250 jobs, $60,000 average salaryAcademic Advisors - $30,000 - $33,000 salary
Young Families
New Graduates
Leased by the unit, not per bedroom
Traffic Impact AnalysisExisting Traffic Patterns of future development ‘generated’
Human Nature factor
10% Annual Growth 2016-2024TEC Experience – 1,500+ TIAs, 8 states, highest growth rate seen is 5%TIA completed in May 2016 on Wellborn Road, 2% growth
Urban Land Uses
All studied intersections operate at acceptable Levels of Service
Summary-No adverse impact to utility or roadway infrastructure
-Consistent with the City of College Station Comprehensive Plan
-Willing participant in Arrington Road remediation though not required
-Exceeded requirements and expectations with regard to working with neighbors, public entities, and development community